This is a Contract Price Schedule template for the National Park Service (NPS) Denver Service Center for the General Grant Memorial (GEGR) roof replacement project (Solicitation Number: PARK - PMIS 247283). The contract requires offerors to submit pricing for a base line item and all option line items, with failure to do so potentially rendering proposals unacceptable.

The pricing structure includes: Contract Line Item Number 1 for Replace EPDM Roof (1 lump sum unit), Contract Line Item Number 2 for OPTION A—Repair and Repaint Structural Steel Supports for Stone Dome (1 lump sum unit), and Contract Line Item Number 3 for OPTION B—Porch Stone Roof Clean and Repoint (1 lump sum unit). Offerors must provide unit prices and extended total prices for unit-priced items and total price only for lump-sum items. All totals and extended prices must be rounded to whole dollars, with unit prices governing in case of calculation errors and corrected amount totals governing in case of summation errors. Additional measurement and payment information is specified in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

Contract Price Schedule
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:
PARK - PMIS:GEGR 247283
(Project Management Information System)
Developed Area:General Grant Memorial
Project Title:Replace EPDM Roof at GEGR
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Replace EPDM Roof1Lump Sum
TOTAL BASE PRICE (Contract Line Item Number 1) -----------------------------------------------------------------------------------------------
2OPTION A, Repair and Repaint Structural Steel Supports for Stone Dome1Lump Sum
3OPTION B, Porch Stone Roof - Clean and Repoint1Lump Sum
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 2 through 4) -----------------------------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 4) --------------------------
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.