2026_0616_GEGR_247283_drawings_REV_01_0002.pdf
PDF 13 MB Posted
- Solicitation number
- 140P4526R0019
About this file
This document comprises construction drawings for a roof replacement project at General Grant National Memorial in New York, New York. The project is identified as 247283 REPLACE EPDM ROOF and includes detailed architectural and construction documentation prepared by John G. Waite Associates, Architects, located at 225 Broadway, Suite 1215, New York, NY 10007.
The construction drawings package includes site plans, roof plans at multiple levels (lower roof with balcony and colonnade level), detail elevations showing north and west facades, and comprehensive membrane roof details. Key work includes removal of existing EPDM membrane, removal of existing sealants and flashing, removal of all roof accessories, and installation of a new fully adhered membrane roof system. The specifications call for replacement of slab, protective measures for existing historic stone elements (parapet, crenellations, stone mortar joints), installation of new sheet metal flashing and counter-flashing, drain modifications with sump receivers and scupper liners, and sealing of all joints. Protection requirements include site-wide matting, planning for vehicle protection and staging areas, and curb protection during vehicle access. The project designates an Option A for dome chamber structural steel preparation and painting, and Option B for porch stone roof cleaning and reporting. The documents are dated with a revision date of 06/16/2026 and were prepared for the National Park Service, Denver Service Center, under the Department of the Interior for rehabilitation of General Grant's Tomb.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL GRANT NATIONAL MEMORIAL
NEW YORK, NEW YORK
247283 REPLACE EPDM ROOF
A:
\2
0f n ps g eg r r oo f d om e si de w al k\ c on st ru ct io n do cu m en ts \2 do m e\ s he et s\ T1
.0 D om e
Co ve r.d w g, /1 6/
:1
6:
P M
, e se hl
A:
\2
0f n ps g eg r r oo f d om e sid ew al k\ co ns tru ct io n do cu m en ts \2 do m e\ sh ee ts
\A 1.
Ro of P la ns
.d w g, /1 6/
1:
:4
AM
, e
A:
\2
0f n ps g eg r r oo f d om e si de w al k\ c on st ru ct io n do cu m en ts \2 do m e\ s he et s\ A2
.2 D et ai l E le va tio ns .d w g, /1
7/
2:
:3
AM
, e
A:
\2
0f n ps g eg r r oo f d om e sid ew al k\ co ns tru ct io n do cu m en ts \2 do m e\ sh ee ts
\A 3.
M
EM
BR
AN
E
RO
O
F D
ET
AI
LS
.d w g, /1
6/
1:
:3
AM
, e
| T1.0 COVER_2026.06.16 - REV.1 |
| Sheets and Views |
| T1.0 COVER |
| C1.0 SITE PLAN_2026.06.16 - REV.1 |
| A1.1 Roof Plans_2026.06.16 - REV.1 |
| Sheets and Views |
| A1.1 ROOF PLANS |
| A2.2 DETAIL ELEVATIONS_2026.06.16 - REV.1 |
| Sheets and Views |
| A2.2 DETAIL ELEVATIONS |
| A3.1 MEMBRANE ROOF DETAILS_2026.06.16 - REV.1 |
| Sheets and Views |
| A3.1 MEMBRANE ROOF DETAILS |
File details come from the government source that posted it. Updated .