B1051_Att_08_Bid_Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Bldg. 1051 Replace Main Dry Valves
Solicitation number
N0025326Q0013
Issued by

About this file

This is a bid form template for solicitation N0025326Q0013 to replace the main dry valves at Building 1051, Naval Undersea Warfare Center (NUWC) Division, Keyport. The form is designed for contractors to submit pricing proposals on a firm fixed-price basis for the three primary work elements: repair and replacement of fire sprinkler riser components, replacement of the breathing air compressor and air purifier system, and lighting improvements above vertical waste storage tanks.

The bid form requires contractors to itemize costs by line item with detailed breakdowns of material, labor (by trade and hours), and equipment costs, organized by work category. Contractors must provide unit rates and calculate totals for each component, with summary sections for subcontractor performance value, prime contractor and project management costs, and percentage-based adjustments for general home office overhead, general field overhead, general and administrative costs, profit, and bond. The form emphasizes that all formulas in total cells must remain as formulas rather than hard-entered values, and example rows provided for guidance must be deleted before submission. Offerors must submit FOB Destination pricing to NUWC Division, Keyport, and this requirement is 100% set aside for small business concerns under NAICS code 238290 with a $22M annual revenue size standard. The solicitation was issued as a request for quotation (RFQ) and responses must be submitted via email to the designated Navy contracting officers.

View the file

Other files

File Type Posted
C07_B1051_Att_13_PPI_Answers.pdf PDF
Solicitation Amendment N0025326Q00130002 SF 30.pdf PDF
B1051_Att_13_PPI_Answers.pdf PDF
Solicitation Amendment N0025326Q00130001 SF 30.pdf PDF
B1051_Att_12_SOW_Rev_1.pdf PDF
B1051_Att_06_Schedule_of_Values.xlsx XLSX spreadsheet
B1051_Att_12_SOW.pdf PDF
B1051_Att_02_Wage_Det.pdf PDF
B1051_Att_05_Guide_OPSEC.pdf PDF
B1051_Att_10_Safety_Data.docx DOCX document
Solicitation - N0025326Q0013.pdf PDF
B1051_Att_01_Material_Equip.xlsx XLSX spreadsheet
B1051_Att_04_Guide_Environmental.pdf PDF
B1051_Att_03_Guide_Safety.pdf PDF
B1051_Att_07_Past_Perf.docx DOCX document
B1051_Att_09_PPI_Form.docx DOCX document
B1051_Att_11_OSHA.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N0025326Q0013Contractor:
PID Description:Building 1051 Replace Main Dry ValvesDate:
Project Location:Naval Undersea Warfare Center Division, Keyport
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
Building 1051 Replace Main Dry Valves
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount