B1051_Att_01_Material_Equip.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Bldg. 1051 Replace Main Dry Valves
- Solicitation number
- N0025326Q0013
About this file
This is an Installed Equipment Contract specification document that details the equipment and materials to be installed under Contract No. N00253-26-SIMACQ-KPT-102-0012 for Building 1051 at Naval Undersea Warfare Center (NUWC) Division, Keyport. The document provides a template and example entries for documenting equipment installations, removals, and associated costs. The template requires contractors to identify each installed asset by building number, room number, quantity, unit of measure, and total installation cost (including labor and material for both removal of old equipment and installation of new equipment). Each asset entry must include supplier/vendor information (name, address, email, phone), manufacturer details (name, model number, serial number), warranty expiration dates, and the asset number of any removed equipment.
The example provided includes specific installations such as two Breathing Air Filters (Atlas Copco model FTX345BU) in Building 5094, Room 101, each costing $2,400.00 with a warranty expiration date of 3/12/21, and carpet installation (300 square feet of Mohawk carpet) in Building 5094, Rooms 116-118, costing $4,200.00 with a warranty expiration date of 3/21/19. The document emphasizes that when installing assets with a unit of issue of "EACH," separate line items must be created for each individual asset, and that the government's Facilities Management Systems (FMS) will assign new asset numbers upon receipt of the contractor's completed spreadsheet rather than the contractor assigning them.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C07_B1051_Att_13_PPI_Answers.pdf | ||
| Solicitation Amendment N0025326Q00130002 SF 30.pdf | ||
| B1051_Att_13_PPI_Answers.pdf | ||
| Solicitation Amendment N0025326Q00130001 SF 30.pdf | ||
| B1051_Att_12_SOW_Rev_1.pdf | ||
| B1051_Att_06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| B1051_Att_12_SOW.pdf | ||
| B1051_Att_02_Wage_Det.pdf | ||
| B1051_Att_05_Guide_OPSEC.pdf | ||
| B1051_Att_08_Bid_Form.xlsx | XLSX spreadsheet | |
| B1051_Att_10_Safety_Data.docx | DOCX document | |
| Solicitation - N0025326Q0013.pdf | ||
| B1051_Att_04_Guide_Environmental.pdf | ||
| B1051_Att_03_Guide_Safety.pdf | ||
| B1051_Att_07_Past_Perf.docx | DOCX document | |
| B1051_Att_09_PPI_Form.docx | DOCX document | |
| B1051_Att_11_OSHA.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | N00253-26-SIMACQ-KPT-102-0012 | ||||||||||||||
| Project Title: | Bldg. 1051 - Replace Main Dry Valves | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .