B1040 First Floor.pdf

PDF 316 KB Posted

Attached to
Sound Testing IDIQ
Solicitation number
FA930226Q0031_V2
Issued by

About this file

This document is an architectural floor plan for the 1st Floor Secure Perimeter of a facility. The plan includes both a reflected ceiling plan (H1) and a floor plan (A1), drawn at a scale of 3/64" = 1'-0", depicting a secure operations facility with multiple functional areas and rooms.

The facility contains numerous operational spaces including master operations control rooms (blue force, white force, and red force control rooms), mission briefing areas, cockpit simulation stations (both standard and high-fidelity configurations), secure communication and storage areas, and administrative offices. Supporting infrastructure consists of mechanical rooms, electrical closures, UPS systems, loading docks, staging areas, and circulation corridors. The plan identifies specific test point locations marked with color-coded indicators (green squares for wall/door test points, red squares for ceiling/floor test points) and directional arrows indicating test point orientation. The secure perimeter is clearly demarcated with dashed red lines, and the document notes that roof deck and floor deck above the secure area must terminate for continuous enclosure at Level 1. The facility appears designed for military or defense-related simulation and command operations, with emphasis on secure communications, data storage, and coordinated multi-force operational control.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U3

COFFEE

BAR/

ROOM

ADV.

AST.

MOD SIM

BREAK

ROOM/

TDY

SURGE

NON

SECURE

COMM

MAN

TRAP

108 109

MASTER OPS

FAC MAN

OPS CHIEF

CHIEF 131

144 146

FILE JSE DEV

CTR

BLUE

FORCE

CONTROL

ROOM

WHITE

FORCE

CONTROL

ROOM

E;TRA

COCKPITS

E;TRA

COCKPITS

MISSION MISSION

BRIEFING BRIEFING

LOADING

DOCK /

STAGING

MISSION

BRIEFING

SPACE /

CYBER

ROOM

TECH

WORKSPACE

SECURE

STORAGE

SECURE

COMM

LARGE

DATA

STORAGE

RED

FORCE

CONTROL

ROOM

WOMENS

DIRECTORS SECURE

CONFERENCE VTC

JSE OPS

CHIEF

117.1

CORRIDOR

113 114 115

EWB

LEAD CHIEF CHIEF 116

ELEVATOR 138AFREIGHT ELEV MR

SECURITY

ITORIUM

RM/ MENS

JAN

CO

RR

ID

OR

7EWG / CC

PM LEAD

JSE M ; ROOM CHIEF145

ADMIN

106WAITING

105 TECH

EWS CUBICLES

JSE CUBICLES

JSE PM LEAD JSE E;P

148 149 150

HIGH FIDELITY COCKPITS

HIGH FIDELITY COCKPITS

STORAGE (HIGH BAY)

CORRIDOR

ELEC

UPS

MECHANICAL

CIRCULATION

FILE ARCHITECDTIRECTOR

EWB CUBICLES

MOTHER SB12R6EAK

SECURITYSECURITY MISSION

121 155 PLANNING

SECURITY

103B CONFERENCE LEAD

TOILET

TOILET

MENS

STAIR

STAIRS

ELEV

ELEV MR

CORRIDOR MAN TRAP

127 153

VESTIBULE LOBBY TASK

102 STATIONWOMENS

MECHANICAL

YARD

EL

EV

VE

ST

4A

A-515

A5 SIM

A8

A-515

A12 A-515

A1 A-515

A16 A-515

133 EWS BUS EWS DIV

LOGISTICS

TEAM EBW FMEBW DIV HRL

EWS SITESUPPORT

SUP DIV DIV

CHIEF CHIEF

A5 178 A-515

RSOIMOM 177

SECURED AREA

PERIMETER

ICD/ICS 705 w/ RF

SHIELDING

SECURED AREA

PERIMETER

ICD/ICS 705 WALL TYPE A

LOBBY

MECHANICAL

YARD

FLOOR DECK AT SECOND

LEVEL ABOVE SECURE AREA

TO TERMINATE FOR

CONTINUOUS ENCLOSURE

AT LEVEL 1

ROOF DECK ABOVE SECURE

AREA TO TERMINATE FOR

CONTINUOUS ENCLOSURE

AT LEVEL 1

ROOF DECK ABOVE SECURE

AREA TO TERMINATE FOR

CONTINUOUS ENCLOSURE

AT LEVEL 1

F8 A-515

E1 A-514

E16 H16 SIM

A-515 A-515

F12 A-515

F5 A-515

H16 SIM

A-515

A5 A-516

A9 A-516

C

A B

D

US Army Corps of Engineers ®

SHEET ID

D R

AW

N

BY

SU

BM

IT

TE

D B

Y:

N

3 5 7 9 11 13 15 17

L

G

E

C

A

DA

TE

M

AR

K

DE

SC

RI

PT

IO

N

2 4 6 10 12 14 16 1 19

SHIELDING LEGEND

P

M

K

H

F

D

B

AS-BUILT A110S

1S T

FL

O

O R

SE

C

U R

E

PE

R

IM

ET

ER

PL

AN

S

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

RS

LO

S

AN

G

EL

ES

DI

ST

RI

CT

C

AL

IF

O

R N

IA

TH

E

KO

R

TE

CO

M

PA

NY

U S

H

IG

H W

AY

H

IG

H

LA

N D

,I L

D

ES

IG

N

ED

BY

ES

W

IL

SH

IR

E

BL

VD

,S

U

IT

E

0, LO

S

AN

G

EL

ES

AL PP SI

ZE

AN

SI

D

C H

EC

KE

D

BY

W

F

IS

SU

E

DA

TE

SE

PT

EM

BE

R

,2

SO

LI

C

IT

AT

IO

N

NO

W

2P L2

0R

C

O N

TR

AC

T

NO

W

2P

L2 0C

R

EC

O R

D D

R

AW

IN

G

S

AS

-B U

IL

T

-2

ED

W

AR

D

S

AI

R

FO

R C

E

BA

SE

CA

LI

FO

RN

IA

-O

IN

T

SI

M U

LA

TI

O N

EN

VI

R O

N M

EN

T

FA

CI

LI

TY

3/64" = 1'-0"A1 1ST FLOOR SECURE PERIMETER FLOOR PLAN

PLAN NORTH

3/64" = 1'-0"H1 1ST FLOOR SECURE PERIMETER REFLECTED CEILING PLAN

AS BUILT RECORD DRAWING

THIS RECORD DRAWINGS HAS BEEN

PREPARED, IN PART, BASED UPON

INFORMATION FURNISHED BY OTHERS.

WHILE THIS INFORMATION IS BELIEVED TO BE

RELIABLE, THE ARCHITECT/ENGINEER

ASSUMES NO RESPONSIBILITY FOR THE

ACCURACY OFTHIS RECORD DRAWING OR

RECORD SPECIFICATIONS OR FOR ANY

ERRORS OR OMISSIONS THAT MAY HAVE

BEEN INCORPORATED INTO IT AS A RESULT

OF INCORRECT INFORMATION PROVIDED TO

THE ARCHITECT/ENGINEER. THOSE RELYING

ON THIS RECORD DOCUMENT ARE ADVISED

TO OBTAIN INDEPENDENT VERIFICATION OF

ITS ACCURACY.

3 Walls and door

Indicates wall / door test point area

Indicates ceiling / floor test point area

Indicates direction of test points

File details come from the government source that posted it. Updated .