B08_Solit_PSP_Vol_II_Proposed_Equals.doc

DOC document 52 KB Posted

Attached to
PT BONITA LIFT STATION & WATERLINE FOR GOLDEN GATE
Solicitation number
140P8621R0029
Issued by

About this file

This document contains a contractor's proposed equals submission relating to a solicitation from the National Park Service Pacific West Region. The contractor proposes alternate products or models that are equal or superior to the specifications for various section and paragraph numbers. By submitting the proposed equals, the contractor certifies that the alternate items are compatible with interfacing components, installation can be coordinated, and all changes resulting from the substitution will be covered without additional expense. The contractor is also encouraged to propose sustainable, accessible, or recycled materials.

The related federal contract opportunity is for the PT Bonita Lift Station and Waterline project for Golden Gate National Park. The solicitation number is 140P8621R0029 issued by the Department of the Interior National Park Service Pacific West Region.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No.
Paragraph No.
Product/Model No.
Proposed Product/Model No.

A.

By submitting the proposed equal, the contractor certifies that it:

1.

Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2.

Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3.

Has determined that the proposed item is compatible with interfacing items.

4.

Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5.

Waives all claims for additional expenses that may be incurred as a result of the substitution.

B.

The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

File details come from the government source that posted it. Updated .