B08_Section_J__Price_Schedule.pdf
PDF 637 KB Posted
- Solicitation number
- 140P8621R0029
About this file
This price schedule outlines the line items and pricing for rehabilitation work at Point Bonita Lift Station and installation of a new water pipeline. The contract includes three line items: installation of a new lift station and electrical components; gravel road improvements; and installation of a water pipeline with specified components. Offerors must submit pricing for all base and option line items. Pricing should be provided as lump sums for lump-sum line items and unit prices with extended totals for unit-priced line items. The solicitation number is 140P8621R0017 and is issued by the National Park Service Pacific West Region for the Department of the Interior Golden Gate National Park.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER: 140P8621R0017
PMIS: GOGA - 233751, 253304
DEVELOPED AREA: Point Bonita PROJECT TITLE: Rehabilitate Point Bonita Lift Station and Waterline
CONTRACT
LINE ITEM
NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
1 Installation of New Lift Station and Electrical Components
1 Lump Sum
2 Gravel Road Improvements 1 Lump Sum
3 Installation of Water Pipeline with Specified Components
1 Lump Sum
TOTAL PROPOSED PRICE (Contract Line Item Number 1 through 3) --------------------------- All measurement and payment information is included in the project specification, Section 012700.
CONTRACT PRICE SCHEDULE
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs.
In case of error in summation, the total of the correted amounts govern. Round totals and extended prices to whole dollars.
RFP No. 140P8621R0017 Section J - Attachment No. 001