This is a Project Specifications document for the Munising Falls Trail Rehabilitation project at Pictured Rocks National Lakeshore in Munising, Michigan (PMIS 226930). The project involves renovating approximately 650 feet of paved trail with new asphalt and concrete pavements, replacing three existing wood bridges with prefabricated elevated boardwalks, installing a new stone retaining wall to replace a failing wood crib wall, and completing miscellaneous drainage improvements and landscape restoration. The work is divided into three contract line items: Western Work Area (933 SF asphalt demolition, 1,000 LF wood crib wall demolition, 922 SF prefabricated boardwalk, landscape restoration); Central Work Area (1,011 SF asphalt demolition, 1,177 SF concrete paving); and Eastern Work Area (805 SF asphalt demolition, removal of three existing bridges, 1,216 SF prefabricated boardwalk). The contractor must complete all work within 365 calendar days of the Notice to Proceed, with the period inclusive of supply lead times, material deliveries, and anticipated average weather days.
Key specifications include: cast-in-place concrete abutments meeting ACI 318 requirements with 3,500 psi strength; structural steel components meeting AISC specifications with hot-dip galvanization; drilled micropiles and helical piles for boardwalk foundations with design parameters specified in the geotechnical reports; prefabricated steel-framed boardwalks with pressure-treated wood decking and guardrails from approved fabricators (Wickcraft Company preferred); stone retaining walls using Michigan boulders or salvaged stone with geotextile and drainage systems; concrete and aggregate base courses per MDOT specifications; and erosion/sediment controls per NPDES requirements. The contractor must manage temporary utility interruptions with 48-72 hours notice, maintain existing site access for the Visitor Center and North Country Trail, maintain normal business hours (8 a.m. to 5 p.m. Monday-Friday) unless approved otherwise, comply with noise limits not exceeding 70 dB(A) at 50 feet for repetitive impacts, and implement a site-specific Accident Prevention Plan addressing construction hazards. Submittals required prior to preconstruction conference include liability insurance certificates, construction schedule with shop drawing and procurement timelines, Schedule of Values breakdown, comprehensive Safety Plan with Job Hazard Analysis, subcontractor list with labor compliance certifications, Quality Control and Waste Management Plans, and Temporary Stormwater Pollution Prevention Plan. The project must comply with NPS management standards, historic/archaeological protection requirements (immediate work suspension if cultural resources are discovered), and environmental protection measures including tree protection, erosion control, and water quality preservation along Munising Creek.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_MFT_-_PIRO_0001.pdf | ||
| Sol_140P6426B0004_Amd_0001.pdf | ||
| B08_Solicitation_-_DOL_Wage_Determination.pdf | ||
| B08_Solicitation_-__ADDENDUM_1.pdf | ||
| B08_Solicitation_-_Statement_of_Structural_Tests_and_Special_Inspections.pdf | ||
| B08_Solicitation_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Drawings_-_Bid_Option_1.pdf | ||
| Sol_140P6426B0004.pdf | ||
| B08_Solicitation_-_Drawings_PIRO_226930.pdf | ||
| B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .