This is an addendum to bidding documents for the National Park Service that modifies the scope of work for the Pictured Rocks National Lakeshore Trail Rehabilitation project in Munising, Michigan (PMIS No. 226930).
In April 2025, a flood event at peak snowmelt undermined and displaced approximately 75 feet of wood cribwall, asphalt trail, and wood handrail, rendering the trail impassable and necessitating immediate public closure. Park staff obtained U.S. Army Corps of Engineers approval and extracted debris from the failure, stockpiling materials by type (asphalt, limestone rip-rap, wood timber, and dimensional lumber railing) adjacent to the trail at the eastern limits of the impacted reach. The contractor's removal scope remains unchanged—remove, haul off-site, and lawfully dispose of materials—but the stockpiled condition of materials in this 75-foot reach supersedes their original constructed condition. The flood event does not alter the engineering design of the new elevated walkway as detailed in the construction documents. The addendum updates two drawing sheets: Sheet 01 G2.0 (Site Survey) and Sheet 01 C2.1 (Existing Conditions and Demolition Plan West) to indicate approximate limits of the flood-swept trail and cribwall and the stockpiled cleanup debris. Photographs taken in September 2025 document the existing trail conditions, impacted reach, remaining cribwall sections, and stockpiled materials.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_MFT_-_PIRO_0001.pdf | ||
| Sol_140P6426B0004_Amd_0001.pdf | ||
| B08_Solicitation_-_DOL_Wage_Determination.pdf | ||
| B08_Solicitation_-_Statement_of_Structural_Tests_and_Special_Inspections.pdf | ||
| B08_Solicitation_-__Specifications_-_PIRO_226930.pdf | ||
| B08_Solicitation_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Drawings_-_Bid_Option_1.pdf | ||
| Sol_140P6426B0004.pdf | ||
| B08_Solicitation_-_Drawings_PIRO_226930.pdf | ||
| B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDM-1, Page 1
ADDENDUM NO. ADDM-01 National Park Service – Interior Regions 3, 4 5 Facilities, Planning and Infrastructure to the 601 Riverfront Drive Bidding Documents Omaha, NE 68102 30 January 2026
PICTURED ROCKS NATIONAL LAKESHORE TRAIL REHABILITATION MUNISING FALLS
Munising, MI PMIS No. 226930
NOTICE TO BIDDERS: The Specifications and Drawings for the above referenced project are hereby amended as follows:
SPECIFICATIONS – GENERAL
ITEM NO. G-1 SECTION 01 10 00 ITEM 1 – DESCRIPTION OF WORK
a. Part 1.1. Background: ADD the following paragraphs following the existing paragraph:
In April 2025, the project site experienced a high impact rain induced flood event at the peak of snowmelt which undermined and fully displaced an approximately 75-foot reach of wood cribwall, asphalt trail, and wood handrail rendering it impassible. The trail was immediately closed to the public and shall remain as such until the completion of the scope of work under this contract. Existing topography and geology previously concealed by the constructed trail and crib wall has been exposed.
Park staff, having obtained approval from the US Corps of Engineers, have extracted and stockpiled the debris from the failure arranged by material (asphalt, limestone rip-rap, wood timber and dimensional lumber railing) adjacent to the trail at the eastern limits of the impacted reach. Refer to photographs as provided within this addendum.
The Contractor’s scope of work for removals remains as called out in the Construction Documents, to remove, haul off site, and lawfully dispose of material.
The state of the material being stockpiled rather than in their original constructed condition for this 75-foot reach is modified by this addendum. This event of failed trail segment does not alter the engineering of the new elevated walkway as detailed and specified in these Construction Documents.
DRAWINGS – GENERAL
ITEM NO. G-2 SHEET 01 G2.0 SITE SURVEY
a. Replace sheet with the revised sheet 01 G2.0, SITE SURVEY, provided in this addendum. Revisions indicate approximate limits of flood swept trail and cribwall and stockpiling of clean up debris performed by park staff.
ITEM NO. G-3 SHEET 01 C2.1 EXISTING CONDITIONS AND DEMOLITION PLAN WEST
a. Replace sheet with the revised sheet 01 C2.1, EXISITNG CONDITIONS AND DEMOLITION PLAN WEST, provided in this addendum. Revisions indicate approximate limits of flood swept trail and cribwall and stockpiling of clean up debris performed by park staff.
ADDM-1, Page 2
PHOTOGRAPHS TAKEN SEPTEMBER 2025
EXISTING TRAIL LOOKING WEST TOWARDS IMPACTED REACH
ADDM-1, Page 3
VIEW OF IMPACTED REACH OF TRAIL LOOKING NORTHWEST
REMAINING EXISTING CRIBWALL AND TRAIL EAST WEST OF IMPACTED REACH
REMAINING CRIBWALL AND TRAIL WEST OF IMPACTED REACH
ADDM-1, Page 4
STOCKPILED DISPLACED MATERIALS WEST OF IMPACTED REACH
END OF ADDENDUM
stephanie.redding Stamp stephanie.redding Date tbentley Cloud+ tbentley Cloud+ tbentley Polygon tbentley Polygon tbentley Callout APPROXIMATE 75-FOOT REACH OF TRAIL, WOOD CRIB WALL, RAILING, AND SOIL DISPLACED BY FLOOD EVENT APRIL 2025 tbentley Ellipse tbentley Ellipse tbentley Ellipse tbentley Callout STOCKPILED MATERIALS (LIMESTONE RIP-RAP, ASPHALT TRAIL, WOOD TIMBER/DIMENSIONAL LUMBER) BY PARK STAFF FOR CONTRACTOR REMOVAL AND DISPOSAL
MATCHLINE
RESTROOM
BUILDING
VISITOR
CENTER
REMOVE 15 LF 18" CORRUGATED
METAL CULVERT. ABANDON ANY
REMAINING LENGTH.
SAWCUT AND REMOVE EXISTING
CONCRETE PAVING (HATCHED)
REMOVE AND SALVAGE SIGN. STORE,
PRESERVE AND PROTECT SIGN UNTIL
NPS TAKES POSESSION.
REMOVE BENCH AND SALVAGE
FOR REUSE ON SITE
REMOVE WOOD HANDRAILPRESERVE AND PROTECT EXISTING STONE
RETAINING WALL WEST OF THIS POINT. REMOVE
EXISTING STONE RETAINING WALL EAST OF THIS
POINT AND SALVAGE STONE FOR REUSE ON SITE.
REMOVE EXISTING STONE
RETAINING WALL AND SALVAGE
STONE FOR REUSE ON SITE.
PRESERVE AND PROTECT
EXISTING RETAINING WALL
- TYP.
REMOVE EX. 6" PIPE
(PIPE IS ABOVE GRADE)
REMOVE WOOD RETAINING WALL AND
HANDRAIL - TYP. REMOVE WOOD DECKING
AND ASPHALT TRAIL ABOVE - TYP. REMOVE
ALL MATERIALS THAT ARE NOT SOIL OR
PLANT MATERIAL AND DISPOSE OF OFF SITE.
MATERIALS TO BE REMOVED INCLUDE BUT
ARE NOT LIMITED TO: LUMBER, METAL,
GRAVEL BACKFILL, ASPHALT, AND
CONCRETE.
SEQUENCE AND PERFORM WALL REMOVAL
TO ENSURE BACKFILL AND OTHER
MATERIALS DO NOT SPILL AND/OR MIGRATE
DOWN SLOPE OUTSIDE THE LIMITS OF WORK.
0+00
0+50
1+00
1+50
2+00
2+
3+00
EXISTING CORDUROY ROAD REMNANT LOGS. DO
NOT DISTURB. THESE LOGS ARE PART OF THE
SCHOOLCRAFT FURNACE HISTORIC SITE LISTED ON
THE NATIONAL HISTORIC REGISTER. REFER TO
SHEET G4.0 FOR ADDITIONAL REQUIREMENTS.
STRIP AND STOCKPILE TOPSOIL AND OTHER ORGANIC MATERIAL FROM ALONG TRAIL IN ACCORDANCE WITH
NOTES ON SHEET G4.0
COORDINATE DEMOLITION SEQUENCING WITH BOARDWALK FOUNDATION INSTALLATION AND OTHER PROPOSED
IMPROVEMENTS AS REQUIRED.
REFER TO SHEET G4.0 FOR ADDITIONAL NOTES AND REQUIREMENTS.
NOTES
LEGEND
- CONCRETE PAVEMENT - REMOVE
- BITUMINOUS TRAIL - REMOVE
- LIMITS OF WORK
REMOVE CONCRETE PAD
END CONTRACT LINE ITEM 1
BEGIN CONTRACT LINE ITEM 2
10 0 10 20
SCALE OF FEET
tbentley Cloud+ tbentley Cloud+ tbentley Polygon tbentley Polygon tbentley Callout APPROXIMATE 75-FOOT REACH OF TRAIL, WOOD CRIB WALL, RAILING, AND SOIL DISPLACED BY FLOOD EVENT APRIL 2025 tbentley Ellipse tbentley Ellipse tbentley Ellipse tbentley Callout STOCKPILED MATERIALS (LIMESTONE RIP-RAP, ASPHALT TRAIL, WOOD TIMBER/DIMENSIONAL LUMBER) BY PARK STAFF FOR CONTRACTOR REMOVAL AND DISPOSAL
| G1.0 - COVER |
| G2.0 - SITE SURVEY |
| G3.1 - REPRESENTATIONAL PHOTOS WEST |
| G3.2 - REPRESENTATIONAL PHOTOS EAST |
| G4.0 - GENERAL NOTES |
| C1.1 - EROSION AND SEDIMENT CONTROL WEST |
| C1.2 - EROSION AND SEDIMENT CONTROL EAST |
| C2.1 - EXISTING CONDITIONS AND DEMOLITION PLAN WEST |
| C2.2 - EXISTING CONDITIONS AND DEMOLITION PLAN EAST |
| C3.0 - LAYOUT PLAN OVERALL |
| C3.1 - LAYOUT AND GRADING PLAN WEST |
| C 3.2 - LAYOUT AND GRADING PLAN EAST |
| C4.0 - TRAIL PROFILE AND ALIGNMENT DATA |
| C5.0 - TRAIL CROSS SECTION WEST |
| C5.1 - TRAIL CROSS SECTION EAST |
| C6.0 - DETAILS SHEET |
| L0.0 - SITE NOTES AND ABBREVIATIONS |
| L0.1 - CONSTRUCTION STAGING PLAN |
| L1.1 - SITE PLAN WEST |
| L1.2 - SITE PLAN EAST |
| L4.0 - SITE SECTIONS A&B |
| L4.1 - SITE SECTIONS C |
| L5.0 - SITE DETAILS |
| L5.1 - SITE DETAILS |
| L5.2 - SITE DETAILS - WEST SLOPE RESTORATION |
| L6.0 - BOARDWALK DETAILS |
| L6.1 - BOARDWALK LAYOUT PLAN WEST |
| L6.2 - BOARDWALK LAYOUT PLAN EAST |
| S0.1 - STRUCTURAL GENERAL NOTES |
| S0.2 - STRUCTURAL DESIGN INFORMATION |
| S1.1 - STRUCTURAL SITE PLAN WEST |
| S1.2 - STRUCTURAL SITE PLAN EAST |
| S2.0 - STRUCTURAL TYPICAL DETAILS |
| S2.1 - STRUCTURAL SECTIONS |
| S2.2 - STRUCTURAL SECTIONS |
File details come from the government source that posted it. Updated .