B08_Solicitation_-_DOL_Wage_Determination.pdf

PDF 2 MB Posted

Attached to
Munising Falls Trail Rehabilitation Federal contract opportunity
Solicitation number
140P6426B0004
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a General Decision wage determination document issued by the U.S. Department of Labor for prevailing wage requirements on federal construction contracts in Michigan.

The decision covers heavy construction pipeline work statewide in Michigan, effective January 2, 2026, and supersedes a previous determination (MI20250157). It establishes prevailing wage rates for power equipment operators performing gas distribution and duct installation work, classified into two groups based on equipment type and capacity. Group 1 equipment (backhoe, crane, grader, mechanic, dozer D-6 or larger, side boom, trencher, endloader 2+ yards) requires a rate of $39.78 per hour with $25.25 fringes, while Group 2 equipment (smaller dozers, endloaders, side booms, backfillers, pumps, tractors, tampers, concrete saws, compressors, and supporting personnel) requires $36.05 per hour with $25.25 fringes. The determination also establishes laborer rates for distribution work across five Michigan zones, ranging from $22.92 to $28.41 per hour with uniform fringes of $13.45 across all zones. Additional notes address Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements, wage rate identifier classifications (union, survey, and state-adopted rates), and the appeals process for wage determination disputes directed to the Department of Labor's Wage and Hour Division and Administrative Review Board.

View the file

Other files for this federal contract opportunity

Other files attached to Munising Falls Trail Rehabilitation, newest first.
File Type Posted
Sol_140P6426B0004_Amd_0001.pdf PDF
Questions_and_Answers_-_MFT_-_PIRO_0001.pdf PDF
Sol_140P6426B0004.pdf PDF
B08_Solicitation_-_Drawings_PIRO_226930.pdf PDF
B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
B08_Solicitation_-__ADDENDUM_1.pdf PDF
B08_Solicitation_-_Statement_of_Structural_Tests_and_Special_Inspections.pdf PDF
B08_Solicitation_-__Specifications_-_PIRO_226930.pdf PDF
B08_Solicitation_-_Bid_Schedule.xlsx XLSX spreadsheet
B08_Solicitation_-_Drawings_-_Bid_Option_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .