B08_Solicitation-NPS_SubmittalList.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
INDU Fire and Intrusion Alarm Replacement Federal contract opportunity
Solicitation number
140P6425B0006
Issued by
Department of the Interior National Park Service Midwest Region

About this file

The document is a Submittal List with Review Estimate Instructions and Template for the Indiana Dunes National Park Fire and Intrusion Alarms Replacement project. The solicitation, numbered 140P6425B0006, is for a firm-fixed price contract valued between $1M and $5M, set aside 100% for Total Small Businesses under NAICS Code 238210. The project involves removing existing and installing new fire and intrusion systems across multiple buildings at Indiana Dunes National Park in Porter, Indiana, with an expected award by early summer 2025 and performance beginning in summer 2025.

The submittal list details specific documentation requirements for design and construction services, including submissions for various project phases such as historic preservation treatment, cutting and patching plans, waste management, selective demolition, and technical specifications for electrical, safety, and security systems. The document provides instructions for both the Design Architect/Engineer and Construction Contracting Officer Representative on completing the submittal list, tracking review times, and estimating effort for different project disciplines. Construction Wage Rate Requirements for Porter County will apply to the contract.

View the file

Other files for this federal contract opportunity

Other files attached to INDU Fire and Intrusion Alarm Replacement, newest first.
File Type Posted
Questions_and_Answers_0002.pdf PDF
B11_Site_Visit_Sign-In_Sheet_0002.pdf PDF
Sol_140P6425B0006_Amd_0002.pdf PDF
Sol_140P6425B0006_Amd_0001.pdf PDF
Sol_140P6425B0006.pdf PDF
B08_Solicitation-Specifications.pdf PDF
B08_Solicitation-Bid_Schedule.xlsx XLSX spreadsheet
B08_Solicitation-Wage_Determination.pdf PDF
B08_Solicitation-Specifications_Drawings.pdf PDF
B08_Solicitation-Notice_to_Contractors.pdf PDF
B08_Solicitation-Construction_Contract_Administration.pdf PDF
B08_Solicitation-Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
B08_Solicitation-Bid_Schedule.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) |
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:325487, 325489, 325494, 325495, 334528(Complete this portion for Architect / Engineer (A/E)
Project Title:INDIANA DUNES NATIONAL PARK (INDU) FIRE AND INTRUSION ALARMS REPLACEMENTconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
DIV. 18.1CM-16 FORMS ARE TO BE SUBMITTED WITH ALL SUBMITTALSX
DIV. 19.1 CPRECONSTRUCTION CONFERENCE SUBMITTALX
01 35 911.3HISTORIC PRESERVATION TREATMENT PLAN - CHELLBERG MAIN HOUSE ONLYXX
01 73 291.2CUTTING AND PATCHING PLANX
01 74 191.4WASTE MANAGEMENT PLANX
02 41 191.6SELECTIVE DEMO: SURVEY OF EXISTING CONDITIONS, REPORT, SCHEDULE, WARRANTIESXX
02 41 191.7CLOSEOUT INVENTORY LIST, IF APPLICABLEX
09 26 501.5WORKER QUALIFICATIONS FOR PLASTER - CHELLBERG MAIN HOUSE ONLYXXXXX
09 94 001.8WORKER QUALIFICATIONS FOR PAINTINGXXXXX
26 05 001.8BASIC ELECTRICAL REQUIREMENTSXX
26 05 003.5BASIC ELECTRICAL REQUIREMENTSXX
26 05 003.7BASIC ELECTRICAL REQUIREMENTSX
28 05 003.4BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTSXX
28 05 003.5BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTSXX
28 05 003.8BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTSXX
28 05 031.4THROUGH-PENETRATION FIRESTOPPINGXX
28 13 001.5ELECTRONIC ACCESS CONTROLXXXXXX
28 13 001.9ELECTRONIC ACCESS CONTROLX
28 16 001.5INTRUSION DETECTION SYSTEMXXXX
28 16 001.7INTRUSION DETECTION SYSTEMX
28 16 001.8INTRUSION DETECTION SYSTEMXX
28 31 001.4FIRE ALARM DETECTION SYSTEMSXXXXXXX

Total: 0 0 0 0 0 0 0

Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

File details come from the government source that posted it. Updated .