This document is a comprehensive solicitation specification for a fire and intrusion alarm replacement project at Indiana Dunes National Park in Porter, Indiana. The project involves removing existing fire and intrusion systems and installing new systems across multiple buildings, including the Portage Lakefront Pavilion, Dunes Learning Center, Douglas Center, Chellberg Farm, various restroom facilities, and other park structures. The solicitation is structured as a firm-fixed price contract with a total project magnitude between $1 million and $5 million, set to be awarded in early summer 2025 with performance beginning in summer 2025.
The solicitation is specifically set aside for Total Small Businesses under NAICS Code 238210 with a size standard of $19 million. Potential bidders must have an active UEI number and be registered in the System for Award Management (SAM). The official solicitation will be posted on SAM.gov in March/April 2025, with a site visit date to be announced in the solicitation. Contractors will be required to follow Construction Wage Rate Requirements for Porter County, Indiana. The primary point of contact is Colette Riegelmayer, Contract Specialist, who can be reached at colette_riegelmayer@nps.gov or 330-631-8990.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6425B0006_Amd_0002.pdf | ||
| Questions_and_Answers_0002.pdf | ||
| B11_Site_Visit_Sign-In_Sheet_0002.pdf | ||
| Sol_140P6425B0006_Amd_0001.pdf | ||
| B08_Solicitation-Notice_to_Contractors.pdf | ||
| B08_Solicitation-Construction_Contract_Administration.pdf | ||
| Sol_140P6425B0006.pdf | ||
| B08_Solicitation-Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitation-Wage_Determination.pdf | ||
| B08_Solicitation-Specifications_Drawings.pdf | ||
| B08_Solicitation-Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Solicitation-NPS_SubmittalList.xlsx | XLSX spreadsheet | |
| B08_Solicitation-Bid_Schedule.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Div. 1 V. 2022-9-6 Page | 1
INDIANA DUNES NATIONAL PARK
PORTER, IN
REPLACE FIRE AND INTRUSION ALARMS AT INDIANA
DUNES NATIONAL PARK
PMIS 325487, 325489, 325494, 325495, 334528
Drawing No: 80055, 80056, 80057, 80058, 80059
PROJECT SPECIFICATIONS
100% CD Submission
NATIONAL PARK SERVICE
February 3, 2025
Revised: February 13, 2025
Page | 2
Page | 3
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements Section 01 35 91 - Historic Preservation Treatment Procedures (Chellberg Farm Main House only) Section 01 42 00 – Reference Standards Section 01 73 29 - Cutting and Patching Section 01 74 19 - Construction Waste Management and Disposal
DIVISION 01 - GENERAL REQUIREMENTS
Section 02 41 19 – Selective Demolition
DIVISION 09 – FINISHES
Section 09 26 50 – Plaster Repairs (Chellberg Farm Main House only) Section 09 94 00 – Restoration Paint
DIVISION 26 - ELECTRICAL
Section 26 05 00 - Basic Electrical Requirements Section 26 05 03 - Through Penetration Firestopping Section 26 05 05 - Electrical Demolition for Remodeling Section 26 05 13 - Wire and Cable Section 26 05 27 - Supporting Devices Section 26 05 33 – Conduit and Boxes
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Section 28 05 00 - Basic Electronic Safety and Security System Requirements Section 28 05 03 - Through Penetration Firestopping Section 28 13 00 - Electronic Access Control Section 28 16 00 - Intrusion Detection System Section 28 31 00 - Fire Alarm and Detection Systems Performance Based
DRAWINGS
- Cover G0.1 General Information and Index G0.2 General Notes
E0.0 Electrical Cover Sheet
E0.1 Electrical Details
T0.0 Technology Cover Sheet
PMIS 325487 – Portage Lakefront Pavilion and Dunes Learning Center C1.1 Portage Lakefront Pavilion Logistic Plan E1.1 Portage Lakefront Pavilion First Floor Plan - Electrical Systems T1.1 Portage Lakefront Pavilion First Floor Plans - Technology
C2.0 Dunes Learning Center Logistic Plan
E2.1 DLC Dining Hall – First Floor Plan – Electrical Systems
T2.1 DLC Dining Hall – First Floor Plan - Technology
E2.2 Cowles Lodge Cabin – First Floor Plan – Electrical Systems
T2.2 Cowles Lodge Cabin – First Floor Plan - Technology
T2.3 DLC Dining Hall Technology Details and Diagrams
T2.4 Technology Schedules
Page | 4
PMIS 325489 – Douglas Center and Dunewood Campground Buildings
C3.0 Douglas Center Logistic Plan
ED3.0 Douglas Center - Lower Level Demolition Plan - Electrical Systems
ED3.1 Douglas Center - First Floor Demolition Plan - Electrical Systems
E3.0 Douglas Center - Lower Level Plan - Electrical Systems
E3.1 Douglas Center - First Floor Plan - Electrical Systems
T3.0 Douglas Center - Lower Level Plan - Technology
T3.1 Douglas Center - First Floor Plan - Technology
T3.2 Douglas Center Technology Schedules
C4.0 Dunewood Campground Logistic Plan
E4.1 Registration Building First Floor Plan - Electrical Systems
T4.1 Registration Building First Floor Plan – Technology – Bid Option 3
T4.2 Registration Building Technology Schedules
E5.1 Mather Loop Restroom - First Floor Plan - Electrical Systems
E6.1 Douglas Loop Restroom - First Floor Plan - Electrical Systems
PMIS 334528C – Chellberg Farm
C7.0 Chellberg Farm Logistic Plan
ED7.1 Chellberg Farm House – First, Second, and Cellar Floor Plan – Electrical Systems
E7.1 Chellberg Farm House – First, Second, and Cellar Floor Plan – Electrical Systems
TD7.1 Chellberg Farm House – First, Second, and Cellar Floor Plan – Technology
T7.1 Chellberg Farm House – First, Second, and Cellar Floor Plan – Technology
T7.2 Chellberg Farm House Technology Schedules
E8.1 Chellberg Barn - First Floor Plan – Electrical Systems
E8.2 Chellberg Farm Outbuildings – First Floor Plans – Electrical Systems
PMIS 325494 – Several Park Restroom Facilities
C9.0 West Beach Logistic Plan
E9.1 West Beach Contact Station - First Floor Plan - Electrical Systems – Bid Option
E10.1 West Beach Picnic Restrooms – First Floor Plan - Electrical Systems – Bid Option
C11.0 West Beach Fee Collection Building Logistic Plan
E11.1 West Beach Fee Collection Building - Electrical Systems – Bid Option
T11.1 West Beach Fee Collection Building – Technology – Bid Option
T11.2 West Beach Collection Facility Technology Schedules – Bid Option
C12.0 Calumet Dune Restroom and Pumphouse Logistic Plan
E12.1 Calumet Dune Restroom First Floor Plan - Electrical Systems – Bid Option
C13.0 Bailly Chellberg (BC) Contact Station Logistic Plan
ED13.1 BC Contact Station Demolition First Floor Plan – Electrical Systems – Bid Option
E13.1 BC Contact Station First Floor Plan - Electrical Systems – Bid Option
C14.0 Glenwood Dunes Logistic Plan
E14.1 Glenwood Dunes Restroom First Floor Plan - Electrical Systems – Bid Option
Page | 5
PMIS 325495 – Beach Restroom Facilities
C15.0 Central Restroom Logistic Plan
E15.1 Central Restroom First Floor Plan - Electrical Systems – Bid Option
C16.0 Tremont Restroom Logistic Plan
E16.1 Tremont Restroom First Floor Plan - Electrical Systems – Bid Option
C17.0 Mount Baldy Restroom Logistic Plan
E17.1 Mount Baldy Restroom First Floor Plan – Electrical Systems – Bid Option
C18.0 Kemil Restroom Logistic Plan
E18.1 Kemil Restroom First Floor Plan - Electrical Systems – Bid Option
C19.0 Porter Beach Restroom Logistic Plan
E19.1 Porter Beach Restroom First Floor Plan – Electrical Systems – Bid Option
C20.0 Dunbar Restroom Logistic Plan
E20.1 Dunbar Restroom First Floor Plan - Electrical Systems – Bid Option
C21.0 Lakeview Restroom Logistic Plan
E21.1 Lakeview Restroom First Floor Plans - Electrical Systems – Bid Option
Page | 6
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: This project includes replacement of all fire and intrusion alarm systems in multiple park buildings that are not proposed for major rehabilitation in the next 5 years. As most park alarm systems are no longer functional, many park structures are vulnerable to damage by fire or break-ins. This project includes the removal of these existing non-functioning fire and intrusion alarm systems.
1.2 Work Covered by the Contract Documents:
A. Project Location: Multiple locations at Indiana Dunes National Park
a. Group A – Portage Lakefront Pavilion and Dunes Learning Center – PMIS 325487
i. Portage Lakefront Pavilion - 100 Riverwalk Dr, Portage, IN 46368
ii. Cowles Lodge - 700 Howe Rd, Porter, IN (46304. 41.626615105668286, -
87.10042860030187)
iii. Student Cabins (10) - 700 Howe Rd, Porter, IN (41.625622049524566, -
87.10020719535667)
b. Group B – Douglas Center and Dunewood Campground Building – PMIS 325489
i. Douglas Center - 100 N Lake St, Gary, IN 46403
ii. Campground Registration Building - Golf Wood Road, Beverly Shores, IN 46360
iii. Mather Loop Restroom - Golf Wood Road, Beverly Shores, IN 46360
(41.66993927211802, -86.98319040440546)
iv. Douglas Loop Restroom - Golf Wood Road, Beverly Shores, IN 46360
(41.67208309957772, -86.97917703721465)
c. Group C – Chellberg Farm - PMIS 334528C
i. Chellberg Farm Main House - 900 N Mineral Springs Rd, Porter, IN 46304
ii. Chellberg Farm Barn - 900 N Mineral Springs Rd, Porter, IN 46304
iii. Chellberg Farm Sugar Shack - 900 N Mineral Springs Rd, Porter, IN 46304
iv. Chellberg Farm Chicken Coop - 900 N Mineral Springs Rd, Porter, IN 46304
v. Chellberg Farm Storage Shed - 900 N Mineral Springs Rd, Porter, IN 46304
d. Group D – Park Restroom Facilities - PMIS 325494
i. West Beach Contact Station - 1 W Beach Rd, Gary, IN 46403
ii. West Beach Picnic Restroom - 1 W Beach Rd, Gary, IN 46403
iii. West Beach Fee Collection Facility – 376 N. County Line Road, Gary, IN 46403
iv. Calumet Dune Restroom and Pumphouse – 1574 N 300E Chesterton, IN 46304
v. Bailly/Chellberg Contact Station – 618 N Mineral Springs Rd, Porter, IN 46304
vi. Glenwood Dunes Restroom – 557 US-20, Chesterton, IN 46304
e. Group E – Beach Restroom Facilities - PMIS 325495
i. Central Restroom – Central Ave, Beverly Shores, IN 46360
ii. Tremont Restroom – 25 E US Highway 12, Chesterton, IN 46304
iii. Mount Baldy Restroom- 187 Rice Street (US HWY 12), Michigan City, IN 46360
Page | 7
iv. Kemil Restroom –E State Park Boundary Rd & W Lake Front Drive, Porter, IN
46304
v. Porter Beach Restroom – 3039 Wabash Ave, Porter, IN 46304
vi. Dunbar Restroom – 190 Dunbar Ave, Beverly Shores, IN 46301
vii. Lakeview Restroom – 12 Lakefront Drive, Beverly Shores, IN 46301
B. Work consists of: Removal of existing fire and intrusion systems, installation of new existing fire and intrusion systems, and patching of finishes and maintenance repainting as needed -at select buildings at Indiana Dunes National Park.
C. Base Services include:
a. Group A – Portage Lakefront Pavilion and Dunes Learning Center – PMIS 325487
i. Portage Lakefront Pavilion
1. Fire alarm coverage
2. Intrusion coverage to include:
a. Contacts at all exterior doors, roller door, and sliding windows.
b. Motion detection in main corridor, glass break detector in classroom.
c. Contact at roof hatch.
ii. Dunes Learning Center - Cowles Lodge
1. Fire alarm coverage
2. Intrusion coverage to include:
a. Contacts at all exterior doors.
b. Motion detection in hallways and cafeteria.
c. Door contacts at two interior offices; contacts at SE office windows, evaluation of glass break detection.
iii. Dunes Learning Center - (10) Student Cabins:
1. Fire alarm coverage
D. Bid Options:
a. Bid Option #1: Group B – Douglas Center and Dunewood Campground Building –
PMIS 325489
i. Douglas Center
1. Fire alarm coverage
2. Intrusion coverage to include:
a. Contacts at all exterior doors (include lower level exterior door);
contacts on environmental control windows tied to HVAC
(walkway, main lobby, and activity rooms)
b. Motion detection in main corridors and all classrooms
c. Interior door contacts at mechanical / electrical room and supervisor office
ii. Campground Registration Building
1. Fire alarm coverage
iii. Mather Loop Restrooms
1. Fire alarm coverage
iv. Douglas Loop Restrooms
1. Fire alarm coverage
b. Bid Option #2: Group C – Chellberg Farm - PMIS 334528C
i. Chellberg Farm Main House
1. Fire alarm coverage
Page | 8
2. Intrusion alarm coverage to include:
a. Contacts at all exterior doors and basement hatch.
b. Motion detectors in living room and upper level.
ii. Chellberg Farm Barn
1. Fire alarm coverage
iii. Chellberg Farm Sugar Shack
1. Fire alarm coverage
iv. Chellberg Farm Chicken Coop
1. Fire alarm coverage
v. Chellberg Farm Storage Shed
1. Fire alarm coverage
c. Bid Option #3: Group A – Portage Lakefront Access Control– PMIS 325487
i. Portage Lakefront Pavilion
1. Access Control (Unlocking Doors)
d. Bid Option #4: Group A – DLC Cabin Intrusion– PMIS 325487
i. Dunes Learning Center - (10) Student Cabins
1. Exterior Door Contacts
e. Bid Option #5: Group A – Cowles Lodge Access Control– PMIS 325487
i. Cowles Lodge
1. Access Control (Unlocking Doors)
f. Bid Option #6: Campground Registration Intrusion – PMIS 325489
i. Campground Registration Building
1. Contacts at all Exterior Doors and all Exterior Windows
2. Motion Detector in Main Corridor
g. Bid Option #7: Douglas Center Access Control - PMIS 325489
i. Douglas Center
1. Access Control (Unlocking Doors)
h. Bid Option #8: Group D – Park Restroom Facilities - PMIS 325494
i. West Beach Contact Station
1. Fire alarm coverage
ii. West Beach Picnic Restrooms
1. Fire alarm coverage
iii. West Beach Fee Collection Facility
1. Fire alarm coverage
2. Intrusion coverage to include:
a. Contacts at all exterior doors and all exterior windows.
b. Panic buttons.
c. Motion detector in main corridor.
iv. Calumet Dune Restroom and Pumphouse
1. Fire alarm coverage
v. Bailly Chellberg Contact Station
1. Fire alarm coverage
vi. Glenwood Dunes Restroom
1. Fire alarm coverage
i. Bid Option #9: Group E – Beach Restroom Facilities - PMIS 325495
i. Central Restroom
1. Fire alarm coverage
ii. Tremont Restroom
1. Fire alarm coverage
Page | 9
iii. Mount Baldy Restroom
1. Fire alarm coverage
iv. Kemil Restroom
1. Fire alarm coverage
v. Porter Beach Restroom
1. Fire alarm coverage
vi. Dunbar Restroom
1. Fire alarm coverage
vii. Lakeview Restroom
1. Fire alarm coverage
j. Bid Option #10: Group D – Park Restroom Facilities Access- PMIS 325494
i. West Beach Fee Collection Facility
1. Access Control (Unlocking Doors)
E. Period of performance: Work shall be completed within 180 calendar days of the start date provided on the Notice to Proceed
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative
(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary
Page | 10 provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park
Service, and applicable park rules and regulations prescribed by the Park Superintendent.
A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting
Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Park has to option to close some or all restrooms. Park to close fee collection building and student cabins during removal and installation of alarm systems.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day
Martin Luther King, Jr’s Birthday
Washington’s Birthday
Memorial Day
Juneteenth National Independence Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal
Holidays (opm.gov).
3.3 Contractor Use of Site:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
Page | 11
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. See Logistic Plans for staging and storage locations for each site. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Define site disturbance area, including earthwork and clearing of vegetation, to:
1. 40 feet beyond building perimeter
2. 10 feet beyond surface walkways, patios, surface parking, and utilities less than 12 inches in diameter
3. 15 feet beyond primary roadway curbs and main utility branch trenches
4. 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas to limit compaction in the constructed area.
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.
2. Water Service: Water from existing water system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from the existing system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
a. Toilets: Contractor provided for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.
c. Reference Specifications Section 01 74 19 – Construction Waste Management and Disposal
E. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental
Page | 12 regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: N/A.
4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
5. Temporary Enclosures: Provide temporary enclosures such as snow fence as required for protection of construction in progress and completed, from access by visitors or staff, other construction operations, and similar activities.
3.4 Storage - Staging Areas:
A. Contractor to identify and submit storage means and methods for each location. Exterior locations available and designated for staging are noted on the plans/aerials and may be used as needed. Contractor to determine appropriate secure storage methods for each site and must identify fencing, locking mechanism, signage, and cones as needed. Storage methods will be subject to CO and COR approval. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
3.5 Preservation of Natural Features: N/A.
3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
Page | 13
1. Full Government Occupancy: Park will occupy buildings that will be under construction during the entire contract period. Cooperate with Park during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Park's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
B. New /Existing Buildings Unoccupied:
1. Contractor shall be responsible for and protect the entire facility and construction site from notice to proceed through final acceptance.
2. Government Occupancy of Completed Areas of Construction: Government reserves the right to occupy and to place and install equipment in completed areas of building, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the entire project.
a. Before partial Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed.
On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of building.
b. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of building.
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
Page | 14
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management
A. Noise Control: Perform operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or COR.
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.
https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926
Page | 15
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the
Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS
Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National
Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample
JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
https://www.nps.gov/orgs/1671/do-business-with-us.htm
Page | 16
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA
29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain four sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 The Contracting Officer will conduct a preconstruction conference. The successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification
Sections. Types of submittals are indicated in individual specific sections.
Page | 17
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting
Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to
Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the
Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor
i. standard clauses (SF1413).
7. Quality Control Plan.
8. Waste Management Plan.
9. Historic Preservation Treatment Plan Submitted to CO/COR for PMIS 334528 Chellberg
Farm
9.2 Project Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
Page | 18
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selections.
Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the
Contractor. If submittals are not approved, Contracting Officer will return all copies to
Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the
Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
Page | 19
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.
Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of
Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this
Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At the time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting
Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final
Page | 20 inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of
Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one (1) year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
D. Onsite Work During Warranty Period: See Specification 28 13 00. This work shall be included in the Contractor's bid and performed during regular working hours, Monday through Friday.
1. Inspections: The Contractor shall perform two minor/major inspections at six-month intervals (or more often if required by the manufacturer), and two major inspections offset equally between the minor inspections to effect quarterly inspection of alternating magnitude.
2. Minor Inspections: These inspections shall include:
a. Visual checks and operational tests of all equipment, field hardware, and electrical and mechanical controls.
b. Mechanical adjustments if required on any mechanical or electromechanical devices.
3. Major Inspections: These inspections shall include all work described under paragraph
Minor Inspections and the following work:
a. Clean all equipment, including exterior surfaces and accessible and serviceable interior surfaces.
b. Perform diagnostics on all equipment.
c. Check, test, and calibrate (if required) all sensors.
d. Run all system software diagnostics and correct all diagnosed problems.
Page | 21
ITEM 12 - DEFINITION OF CONTRACT LINE ITEMS
12.1 Summary
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
12.2 List of Contract Line Items
A. Contract Line Item No. 1: Group A – Portage Lakefront Pavilion and Dunes Learning Center –
PMIS 325487
1. This item consists of fire alarm coverage at Portage Lakefront Pavilion, Cowles Lodge and TEN (10) DLC Student Cabins.
2. This item consists of intrusion coverage at Portage Lakefront Pavilion and Cowles
Lodge.
3. Payment will be made per the contract and percentage of completion level.
B. Contract Line Item No. 2: Bid Option #1: Group B - Douglas Center and Dunewood
Campground Building – PMIS 325489
1. This item consists of fire alarm coverage at Douglas Center, Campground Registration
Building, Mather Loop Restroom, and Douglas Loop Restroom.
2. This item consists of intrusion coverage at Douglas Center.
3. Payment will be made per the contract and percentage of completion level.
C. Contract Line Item No. 3: Bid Option #2: Group C – Chellberg Farm - PMIS 334528C
1. This item consists of fire alarm coverage at Chellberg Farm Main House, Barn, Sugar
Shack, Chicken Coop and Storage Shed.
2. This item consists of intrusion alarm coverage at Chellberg Farm Main House.
3. Payment will be made per the contract and percentage of completion level.
D. Contract Line Item No. 4: Bid Option #3: Group A – Portage Lakefront Pavilion Access Control–
PMIS 325487
1. This item consists of access control at the Portage Lakefront Pavilion.
2. Payment will be made per the contract and percentage of completion level.
E. Contract Line Item No. 5: Bid Option #4: Group A – DLC Cabin Intrusion– PMIS 325487
1. This item consists of exterior door contacts (intrusion coverage) at TEN (10) DLC
Student Cabins.
F. Contract Line Item No. 6: Bid Option #5: Group A – Cowles Lodge Access Control– PMIS
325487
1. This item consists of access control at
G. Contract Line Item No. 7: Bid Option #6: Campground Registration Intrusion – PMIS 325489
Page | 22
1. This item consists of exterior door and window contacts and motion detector (intrusion coverage) at the Campground Registration Building.
2. Payment will be made per the contract and percentage of completion level.
H. Contract Line Item No.8: Bid Option #7: Douglas Center Access Control - PMIS 325494
1. This item consists of access control at the Douglas Center.
2. Payment will be made per the contract and percentage of completion level.
I. Contract Line Item No.9: Bid Option #8: Group D – Park Restroom Facilities - PMIS 325494
1. This item consists of fire alarm coverage at West Beach Contact Sation, West Beach Picnic
Restrooms, West Beach Fee Collection Facility, Calumet Dune Restroom and Pumphouse, Bailly Chellberg Contact Station, and Glenwood Dunes Restroom.
2. This item consists of intrusion coverage at the West Beach Fee Collection Facility.
3. Payment will be made per the contract and percentage of completion level.
J. Contract Line Item No.10: Bid Option #9: Group E – Beach Restroom Facilities - PMIS 325495
1. This item consists of fire alarm coverage at Central Restroom, Tremont Restroom, Mount
Baldy Restroom, Kemil Restroom, Porter Beach Restroom, Dunbar Restroom, Lakeview Restroom.
2. Payment will be made per the contract and percentage of completion level.
K. Contract Line Item No.11: Bid Option #10: Group D – West Beach Fee Collection Access Control-
PMIS 325494
1. This item consists of access control at the West Beach Fee Collection Facility.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
REPLACE FIRE AND INTRUSION ALARMS AT INDIANA DUNES NATIONAL PARK
INDU – 325487, 325489, 325494, 325495, 334528 01 35 91 - 1
HISTORIC PRESERVATION TREATMENT PROCEDURES
SECTION 01 35 91 - HISTORIC PRESERVATION TREATMENT PROCEDURES (Chellberg Farm Main House)
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes special procedures for historic treatment on Project at Chellberg Farm Main House only, including, but not limited to:
1. Definitions
2. Submittals
3. Quality Assurance
4. Storage and protection of existing historic materials
5. Project site conditions
6. Historic Preservation Treatment Plan
7. Protection, General
8. Protection during application of chemicals
9. Protection during use of heat-generating equipment
10. Historic preservation treatment procedures
1.2 DEFINITIONS
A. "Preservation" - To apply measures necessary to sustain existing form, integrity, and materials of historic property. Work may include preliminary measures to protect and stabilize the property.
B. "Rehabilitation" - To make possible a compatible use for property through repair, alterations, and additions while preserving those portions or features that convey its historical, cultural, or architectural values.
C. "Restoration" - To accurately return form, features, and character of a property to its appearance at a particular period of time by means of removal of features from other periods in its history and repair and reconstruction of missing and deteriorated features from the restoration period.
D. "Reconstruction" - To reproduce in exact form and detail, a building, structure, or artifact as it appeared at a specific period in time. Reconstructed elements do not possess historic integrity in their own right since they are not original fabric.
E. "Stabilize" - To apply measures designed to reestablish a weather-resistant enclosure and structural reinforcement of an item or portion of the building while maintaining essential form as it exists at present. This level of intervention is aimed at retarding or arresting adverse impacts to structures.
F. "Protect and Maintain" - To remove deteriorating corrosion, reapply protective coatings, and install protective measures such as temporary guards; to provide the least degree of intervention.
INDU – 325487, 325489, 325494, 325495, 334528 01 35 91 - 2
HISTORIC PRESERVATION TREATMENT PROCEDURES
G. "Repair" - To stabilize, consolidate, or conserve; to retain existing materials and features while employing as little new material as possible. Repair includes patching, piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading materials. Within restoration, repair also includes limited replacement in kind, rehabilitation, and reconstruction, with compatible substitute materials for deteriorated or missing parts of features when there are surviving prototypes.
H. "Replace" - To duplicate in its entirety, a historic element or feature by matching its historic pattern, detail and appearance. Replacement is justified when original or historic elements are damaged beyond repair or are missing. Replacement conditions and methods include:
1. Replacement with Original or Historic Fabric: Includes fabric salvaged from other locations or projects having identical architectural qualities. Duplication of appearance using identical material possessing historical significance.
2. Replacement with New Materials: Includes replacement with new material of like kind (custom fabricated of manufactured). Duplication of appearance using like material.
3.…