B08_Section_J_Attachment_4_YELL_311631_Price_Schedule_April_2025_BLANK.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 140P2025B0001
About this file
This document is a Price Schedule Template for a National Park Service (NPS) Denver Service Center project at Mammoth Hot Springs in Yellowstone National Park. The solicitation (PARK - PMIS: YELL - 3116313) involves replacing the Mammoth Wastewater Collection System, with a pricing structure that includes base line items and optional line items. The contract line items (CLINs) cover mobilization, open cut excavation, point repairs, pipe bursting, and manhole repair/lining, with quantities specified in linear feet (LF) and each (EA). Bid options include additional open cut excavation, manhole replacement, and CIPP (Cured-In-Place Pipe) lining, allowing contractors to provide comprehensive pricing for the entire project scope. Offerors are required to submit pricing for both base and optional line items, with the potential for rejection if the full requirements are not met.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | |||||
| PARK - PMIS: | YELL - 3116313 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Mammoth Hot Springs | ||||
| Project Title: | Replace Mammoth Wastewater Collection System | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Mobilization | 1 | LS | ||
| 2 | Open Cut Excavation & Point Repairs | 3,646 | LF | ||
| 3 | Pipe Bursting | 3,888 | LF | ||
| 4 | Manhole Repair/Lining | 5 | EA | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | |||||
| 5 | BID OPTION A, Open Cut Excavation | 527 | LF | ||
| 6 | BID OPTION B, Open Cut Excavation | 1,734 | LF | ||
| 7 | BID OPTION C, Manhole Replacement | 24 | EA | ||
| 8 | BID OPTION D, CIPP Lining and Sectional Lining | 4,052 | LF | ||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 5-8) ----------------------------------------------------------- | |||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 8) -------------------------- | |||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .