B09_P2025B0001_Amendment_01_Site_Visit_7_17_25_0001.pdf
PDF 509 KB Posted
- Solicitation number
- 140P2025B0001
About this file
This document is an Amendment (No. 0001) to a federal solicitation for the Yellowstone National Park Mammoth Wastewater Collection System replacement project. The amendment, issued by the National Park Service Denver Service Center, provides three key updates: (1) scheduling a pre-bid site meeting on July 31, 2025, at 1 PM at the Mammoth Community Center, with detailed driving directions for attendees from different park entrances; (2) establishing the bid opening date as August 12, 2025, at 1:00 PM at the Mammoth Hotel's Minerva Room; and (3) including a questions and answers section. The pre-bid meeting agenda includes a project overview, site tour of pipe and manhole rehabilitation/replacement locations, and a note that all questions must be submitted in writing to ensure equal information access for all potential bidders. Contract award is anticipated in late August 2025, with a notice to proceed expected approximately one month later, with work planned to start immediately to avoid peak tourist season.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x) x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
07/17/2025
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION
NO. 140P2025B0001
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE
2. AMENDMENT/MODIFICATION
NO.
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return ________1__________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jason Longshore
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
a)Schedule a pre-bid site meeting. The on site meeting shall occur on July 31, 2025 at 1 PM at the Yellowstone Mammoth Community Center. Please refer to Attachment 1 for further details and a map of the meeting location. Please RSVP by July 28,2025 via email to Jason_longshore@nps.gov with the name of your firm and number of personnel attending;
b)Establish/confirm a bid opening date, time and location as follows:
Date - August 12, 2025 Time - 1:00 PM Location - Mammoth Hotel, Minerva Room, 2 Mammoth Hotel Ave, Mammoth WY, 82190 (North Entrance, Gardner.
c)Provide questions to answers received to date.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X jlongshore Cross-Out
Attachment 1
YELL 311631 – Replace Mammoth Wastewater Collection System
Pre-Bid Project Overview and Site Visit
Date and time: July 31, 2025, at 1 p.m.
Meet at: Mammoth Community Center
Directions
From Gardiner: Follow the Old Gardiner Road (the only road beyond the park entrance gate) to the intersection immediately north of the Mammoth administration area. Follow yellow line on map below. Allow 15 minutes once through the park gate.
From West Yellowstone: Drive through the park entrance gate. Turn left at Madison Junction. Go straight at Norris Junction. Follow red line to intersection immediately north of the Mammoth administration area once you’ve reached Mammoth. Allow 2 hours once through the park gate.
From either entrance: Follow the blue line downhill to the Mammoth Community Center (just a few minutes from the Mammoth administration area). You will pass signs restricting the general public from accessing certain areas in Mammoth. Temp access will be allowed for those attending the site vist.
Attachment 1
Agenda
1:00 p.m. Meet at Mammoth Community Center.
Sign in.
Briefly discuss overall project goals.
Note: Interested bidders will be asked to submit all questions in writing, so that interested bidders not present at this pre-bid meeting will have access to the same information. No binding answers will be given at the pre-bid meeting, although the project team will engage interested bidders in conversation about the project.
1:15 p.m. Tour the project site. Project team members will lead a caravan of vehicles to the locations of pipe and manhole rehabilitation or replacement. Most of the tour will be on or near paved roads. Some of the tour will involve walking across mostly undeveloped terrain.
3 p.m. Adjourn (dependent upon duration of project site tour).
# question response Amendment # 1 When will the anticipated notice to proceed be issued? Is it planned for a spring of 26' start?
Contract award is anticipated in late August 2025, with NTP to follow approximately one month later, depending on the quality of the Division 1 submittals. Work is expected to start immediately, as some of the work needs to be done outside of the peak of tourist season.
2 The invitation for bid states a Pre Bid conference and site visit date will be determined and notified via addenda. Is this correct, and if so do you have an estimated date for this to occur?
A pre-bid conference is scheduled for July 31, 2025. Details are provided in Amendment 1, Attachment 1. DSC and park staff will show interested bidders the project area, but questions asked at the pre-bid will not be answered on-site. Bidders will be asked to submit their questions in writing; questions will be answered in a solicitation amendment.
3 If portions of the project were deemed candidates for other rehabilitation/repair methods such as pipe bursting vs open cut within the wetland areas would this be a consideration?
Pipe segments called out for open-cut replacement will have to be replaced. DSC will consider use of pipe-bursting in lieu of CIPP on a case-by-case basis (the major consideration would be whether there is sufficient space for an access pit). DSC would likely not be in favor or CIPP lining pipes called out for pipe-bursting, because we believe pipe-bursting will result in a more robust, durable product.
YELL 311631 - Replace Mammoth Wastewater Collection System Solicitation Questions and Answers
Solicitation No. 140P2025B0001 Amendment No. 1 - 7/17/2025
| YELL 311631 - bid questions and answers.pdf |
| Sheet1 |
| 2025-07-17T14:35:13-0600 | |
| JASON LONGSHORE |