The file's text, extracted by GovTribe without its formatting.
Location Legend
| CLIN Location Legend |
| CLIN 0X010 |
| Central Yukon Field Office |
| Anchorage Field Office (Kobuk-Seward) |
| Wrangell St. Elias National Park |
| CLIN 0X020 |
| Eastern Interior Field Office |
| CLIN 0X030 |
| Yukon Charley Rivers National Preserve |
| CLIN 0X040 |
| Denali National Park |
| CLIN 0X050 |
| Arctic Coastal Plain (ACP) |
| CLIN 0X060 |
| Anchorage Field Office (Bay) |
AFO, CYFO, WRST CLIN 1 Base12
| CLIN 00010 Lotic AIM Data Collection | | | | |
| AFO KSP, CYFO and WRST plus Field Training and Calibration | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| *it is assumed that if multiple CLIN/Options are exercised that equipment would be reused | |
| Total Other Direct Costs | $0 |
$0
EIFO CLIN 2 Base
| CLIN 00020 Lotic AIM Data Collection | | | | |
| EIFO Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
YUCH CLIN 3 Base
| CLIN 00030 Lotic AIM Data Collection | | | | |
| YUCH Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
DENA CLIN 4 Base
| CLIN 00040 Lotic AIM Data Collection | | | | |
| DENA Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
ACP CLIN 5 Base
| CLIN 00050 Lotic AIM Data Collection | | | | |
| ACP Lotic Data Collection | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
AFO Bay CLIN 6 Base
| CLIN 00060 Lotic AIM Data Collection | | | | |
| AFO Bay | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
CLIN 7 Travel Base Field Training - Travel
| Field Training (Anchorage) and Calibration (Fairbanks) |
| Commercial Airfare |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
Total Travel Costs $0
Total $0
Travel Kobuk-Seward Peninsula No. of Units Unit Cost Sub Total Total
| Tisuk River or Quartz Creek Airstrip spike camp |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A (gallons) |
Total Travel Costs $0.00
| Kotzebue |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A (gallons) |
| Total Travel Costs | $0.00 |
| Dahl Creek/Bear Creek | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A* transport to field camps (delivery and containment) | |
| Jet A* (gallons) | |
| *Jet A provided by BLM at Dahl Creek (NPS fuel tank) | |
Total Travel Costs $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
CYFO Travel No. of Units Unit Cost Sub Total Total
| CYFO - Marion Creek CG or 7-Mile Admin Site |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Bettles w/ cabin rental |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Galena |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Manley |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
WRST Travel No. of Units Unit Cost Sub Total Total
| WRST - Glennallen | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
| WRST - Chisana |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| WRST - Slana or Nebesna | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
EIFO Travel No. of Units Unit Cost Sub Total Total
| EIFO - Chicken (BLM Field Station isn't an option, BLM doesn't provide aviation fuel) | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
| EIFO - Chicken (BLM Field Station is an option, BLM provides aviation fuel) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A * BLM Provided See Note |
Total $0.00
| EIFO - Nome Creek or Central (or other locations with BLM/agency field camp) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| EIFO - Circle w/ house rental (Draanjik area) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camp (delivery and containment) |
| Jet A |
Total $0.00
| EIFO - remote camp (Draanjik area) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| If Draanjik remote camp is used, BLM will provide fuel. |
Total $0.00
| note: will let contractor know 45 days in advance if fuel is not available at Chicken Field station and Nome Creek. |
| note: travel costs (transportation/meals/fuel) are reimbursable |
| note: if Draanjik remote camp is used, BLM will provide fuel. |
YUCH Travel No. of Units Unit Cost Sub Total Total
| YUCH - Eagle w/ house rental |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| YUCH - remote camp (Coal Cr Strip) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A * see Note below |
Total $0.00
| note: travel costs (transportaion/meals/fuel) are reimbursable |
| note: if remote camp is used, NPS will provide fuel. |
DENA Travel No. of Units Unit Cost Sub Total Total
| DENA - NPS housing | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs (NPS provided) | |
| Meals and Incidental Expenses | |
| NPS Aviation* | |
| Jet A transport to field camps (delivery and containment)* | |
| Jet A* | |
| Total | $0.00 |
| note: travel costs (transportation/meals/fuel) are reimbursable |
| note: NPS provided aviation, fuel and fuel delivery for project from NPS base camp |
Government Estimate
Travel ACP sampling (use one of the following estimates) No. of Units Unit Cost Sub Total Total
| Wainwright |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total Travel Costs $0.00
| Inigok (lodging at BLM camp) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs (BLM provided) |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment)* |
| Jet A* |
| Total Travel Costs | $0.00 |
| note: travel costs (transportaion/meals/fuel) are reimbursable | |
| note: BLM provided aviation, fuel and fuel delivery for project from BLM base camp | |
Travel Bay Project Area (use one of the following estimates) No. of Units Unit Cost Sub Total Total
| Dillingham |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total Travel Costs $0.00
| King Salmon |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
| Total Travel Costs | $0.00 |
| Platinum | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
Total Travel Costs $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
AFO, CYFO, WRST CLIN 1 OP 1
| CLIN 00010 Lotic AIM Data Collection | | | | |
| AFO KSP, CYFO and WRST plus Field Training and Calibration | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
$0
EIFO CLIN 2 OP 1
| CLIN 00020 Lotic AIM Data Collection | | | | |
| EIFO Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
YUCH CLIN 3 OP 1
| CLIN 00030 Lotic AIM Data Collection | | | | |
| YUCH Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
DENA CLIN 4 OP 1
| CLIN 00040 Lotic AIM Data Collection | | | | |
| DENA Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
ACP CLIN 5 OP 1
| CLIN 00050 Lotic AIM Data Collection | | | | |
| ACP Lotic Data Collection | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
AFO Bay CLIN 6 OP 1
| CLIN 00060 Lotic AIM Data Collection | | | | |
| AFO Bay | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
CLIN 7 Travel OP 1 Field Training - Travel
| Field Training (Anchorage) and Calibration (Fairbanks) |
| Commercial Airfare |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
Total Travel Costs $0
Total $0
Travel Kobuk-Seward Peninsula No. of Units Unit Cost Sub Total Total
| Tisuk River or Quartz Creek Airstrip spike camp |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A (gallons) |
Total Travel Costs $0.00
| Kotzebue |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A (gallons) |
| Total Travel Costs | $0.00 |
| Dahl Creek/Bear Creek | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A* transport to field camps (delivery and containment) | |
| Jet A* (gallons) | |
| *Jet A provided by BLM at Dahl Creek (NPS fuel tank) | |
Total Travel Costs $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
CYFO Travel No. of Units Unit Cost Sub Total Total
| CYFO - Marion Creek CG or 7-Mile Admin Site |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Bettles w/ cabin rental |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Galena |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Manley |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
WRST Travel No. of Units Unit Cost Sub Total Total
| WRST - Glennallen | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
| WRST - Chisana |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| WRST - Slana or Nebesna | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
EIFO Travel No. of Units Unit Cost Sub Total Total
| EIFO - Chicken (BLM Field Station isn't an option, BLM doesn't provide aviation fuel) | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
| EIFO - Chicken (BLM Field Station is an option, BLM provides aviation fuel) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A * BLM Provided See Note |
Total $0.00
| EIFO - Nome Creek or Central (or other locations with BLM/agency field camp) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| EIFO - Circle w/ house rental (Draanjik area) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camp (delivery and containment) |
| Jet A |
Total $0.00
| EIFO - remote camp (Draanjik area) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| If Draanjik remote camp is used, BLM will provide fuel. |
Total $0.00
| note: will let contractor know 45 days in advance if fuel is not available at Chicken Field station and Nome Creek. |
| note: travel costs (transportation/meals/fuel) are reimbursable |
| note: if Draanjik remote camp is used, BLM will provide fuel. |
YUCH Travel No. of Units Unit Cost Sub Total Total
| YUCH - Eagle w/ house rental |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| YUCH - remote camp (Coal Cr Strip) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A * see Note below |
Total $0.00
| note: travel costs (transportaion/meals/fuel) are reimbursable |
| note: if remote camp is used, NPS will provide fuel. |
DENA Travel No. of Units Unit Cost Sub Total Total
| DENA - NPS housing | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs (NPS provided) | |
| Meals and Incidental Expenses | |
| NPS Aviation* | |
| Jet A transport to field camps (delivery and containment)* | |
| Jet A* | |
| Total | $0.00 |
| note: travel costs (transportation/meals/fuel) are reimbursable |
| note: NPS provided aviation, fuel and fuel delivery for project from NPS base camp |
Government Estimate
Travel ACP sampling (use one of the following estimates) No. of Units Unit Cost Sub Total Total
| Wainwright |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total Travel Costs $0.00
| Inigok (lodging at BLM camp) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs (BLM provided) |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment)* |
| Jet A* |
| Total Travel Costs | $0.00 |
| note: travel costs (transportaion/meals/fuel) are reimbursable | |
| note: BLM provided aviation, fuel and fuel delivery for project from BLM base camp | |
Travel Bay Project Area (use one of the following estimates) No. of Units Unit Cost Sub Total Total
| Dillingham |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total Travel Costs $0.00
| King Salmon |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
| Total Travel Costs | $0.00 |
| Platinum | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
Total Travel Costs $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
AFO, CYFO, WRST CLIN 1 OP 2
| CLIN 00010 Lotic AIM Data Collection | | | | |
| AFO KSP, CYFO and WRST plus Field Training and Calibration | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
$0
EIFO CLIN 2 OP 2
| CLIN 00020 Lotic AIM Data Collection | | | | |
| EIFO Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
YUCH CLIN 3 OP 2
| CLIN 00030 Lotic AIM Data Collection | | | | |
| YUCH Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
DENA CLIN 4 OP 2
| CLIN 00040 Lotic AIM Data Collection | | | | |
| DENA Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
ACP CLIN 5 OP 2
| CLIN 00050 Lotic AIM Data Collection | | | | |
| ACP Lotic Data Collection | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
AFO Bay CLIN 6 OP 2
| CLIN 00060 Lotic AIM Data Collection | | | | |
| AFO Bay | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
CLIN 7 Travel OP 2 Field Training - Travel
| Field Training (Anchorage) and Calibration (Fairbanks) |
| Commercial Airfare |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
Total Travel Costs $0
Total $0
Travel Kobuk-Seward Peninsula No. of Units Unit Cost Sub Total Total
| Tisuk River or Quartz Creek Airstrip spike camp |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A (gallons) |
Total Travel Costs $0.00
| Kotzebue |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A (gallons) |
| Total Travel Costs | $0.00 |
| Dahl Creek/Bear Creek | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A* transport to field camps (delivery and containment) | |
| Jet A* (gallons) | |
| *Jet A provided by BLM at Dahl Creek (NPS fuel tank) | |
Total Travel Costs $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
CYFO Travel No. of Units Unit Cost Sub Total Total
| CYFO - Marion Creek CG or 7-Mile Admin Site |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Bettles w/ cabin rental |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Galena |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| CYFO - Manley |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
WRST Travel No. of Units Unit Cost Sub Total Total
| WRST - Glennallen | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
| WRST - Chisana |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| WRST - Slana or Nebesna | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
EIFO Travel No. of Units Unit Cost Sub Total Total
| EIFO - Chicken (BLM Field Station isn't an option, BLM doesn't provide aviation fuel) | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
| Total | $0.00 |
| EIFO - Chicken (BLM Field Station is an option, BLM provides aviation fuel) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A * BLM Provided See Note |
Total $0.00
| EIFO - Nome Creek or Central (or other locations with BLM/agency field camp) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| EIFO - Circle w/ house rental (Draanjik area) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camp (delivery and containment) |
| Jet A |
Total $0.00
| EIFO - remote camp (Draanjik area) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| If Draanjik remote camp is used, BLM will provide fuel. |
Total $0.00
| note: will let contractor know 45 days in advance if fuel is not available at Chicken Field station and Nome Creek. |
| note: travel costs (transportation/meals/fuel) are reimbursable |
| note: if Draanjik remote camp is used, BLM will provide fuel. |
YUCH Travel No. of Units Unit Cost Sub Total Total
| YUCH - Eagle w/ house rental |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total $0.00
| YUCH - remote camp (Coal Cr Strip) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A * see Note below |
Total $0.00
| note: travel costs (transportaion/meals/fuel) are reimbursable |
| note: if remote camp is used, NPS will provide fuel. |
DENA Travel No. of Units Unit Cost Sub Total Total
| DENA - NPS housing | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs (NPS provided) | |
| Meals and Incidental Expenses | |
| NPS Aviation* | |
| Jet A transport to field camps (delivery and containment)* | |
| Jet A* | |
| Total | $0.00 |
| note: travel costs (transportation/meals/fuel) are reimbursable |
| note: NPS provided aviation, fuel and fuel delivery for project from NPS base camp |
Government Estimate
Travel ACP sampling (use one of the following estimates) No. of Units Unit Cost Sub Total Total
| Wainwright |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total Travel Costs $0.00
| Inigok (lodging at BLM camp) |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs (BLM provided) |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment)* |
| Jet A* |
| Total Travel Costs | $0.00 |
| note: travel costs (transportaion/meals/fuel) are reimbursable | |
| note: BLM provided aviation, fuel and fuel delivery for project from BLM base camp | |
Travel Bay Project Area (use one of the following estimates) No. of Units Unit Cost Sub Total Total
| Dillingham |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
Total Travel Costs $0.00
| King Salmon |
| Commercial Airfare and Freight |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) |
| Lodging Costs |
| Meals and Incidental Expenses |
| Chartered Aviation |
| Jet A transport to field camps (delivery and containment) |
| Jet A |
| Total Travel Costs | $0.00 |
| Platinum | |
| Commercial Airfare and Freight | |
| Ground Transportation Costs (rental, mileage, fuel costs, etc.) | |
| Lodging Costs | |
| Meals and Incidental Expenses | |
| Chartered Aviation | |
| Jet A transport to field camps (delivery and containment) | |
| Jet A | |
Total Travel Costs $0.00 note: travel costs (transportaion/meals/fuel) are reimbursable
AFO, CYFO, WRST CLIN 1 OP 3
| CLIN 00010 Lotic AIM Data Collection | | | | |
| AFO KSP, CYFO and WRST plus Field Training and Calibration | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
$0
EIFO CLIN 2 OP 3
| CLIN 00020 Lotic AIM Data Collection | | | | |
| EIFO Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
YUCH CLIN 3 OP 3
| CLIN 00030 Lotic AIM Data Collection | | | | |
| YUCH Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
DENA CLIN 4 OP 3
| CLIN 00040 Lotic AIM Data Collection | | | | |
| DENA Labor (per each 12 day sampling hitch (10 field days)) | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
| Total Labor Costs | | | | $0 |
Other Direct Costs:
| Field Equipment | No. of Units | Unit Cost | Sub Total | Total |
| Water Quality Sampling Kit Complete (pH,EC,Temp,Redox, DO, Turbidity) | | | | |
| Survival Kit (shelter, heat, food) | | | | |
| Shot Gun | | | | |
| Macroinvertebrate Sampling Net, Surber (363 micron mesh) | | | | |
| inReach Explorer (with prorated service plan) | | | | |
| Tablet Computer - High-end | | | | |
| Shotgun/ammo (bear safety) | | | | |
| Flight helmet (3) | | | | |
| Nomex Suit (3) | | | | |
| Remote camp (tents, survival, bear fence, generator, etc.) | | | | |
| AIM physical habitat sampling gear | | | | |
| Other Expenses |
| Satellite phone rental |
| Satellite phone minutes |
| Photocopying/ Printing (color) |
| Misc Gear and Supplies (waders, etc) |
| firearm & bear safety training |
| Previous Field Equipment should be used for this CLIN | |
| Total Other Direct Costs | $0 |
ACP CLIN 5 OP 3
| CLIN 00050 Lotic AIM Data Collection | | | | |
| ACP Lotic Data Collection | | | | |
| Labor Costs (List Labor Categories) | Staff Hours | Unit Cost | Sub Total | Total |
| Program Manager | | | | |
| Project Manager - field lead (person is either an aquatic ecologist or fish biologist; estimate is for fish biologist) | | | | |
| Field Crew Lead | | | | |
| Field Technician | | | | |
| Data Specialist | | | | |
| GIS Technician | | | | |
| Adminstrative Assistant | | | | |
This is the start of the file's text. The full file is on GovTribe.