PWS_Lotic_Data_Collection_PWS__-_Amend_0002_0002.docx

DOCX document 3 MB Posted

Attached to
Solicit a Vendor to Perform LOTIC AIM services for
Solicitation number
140L0625Q0006
Issued by

About this file

This is a Performance Work Statement (PWS) for solicitation 140L0625Q0006 issued by the Bureau of Land Management (BLM) Alaska for Lotic Assessment, Inventory and Monitoring (AIM) data collection services from 2025-2029. The contractor will collect stream monitoring data at randomly distributed points across BLM-administered lands in Alaska, including the Central Yukon Field Office (40-60 sites), Kobuk-Seward Peninsula (40-60 sites), and Wrangell St. Elias National Park (30-40 sites), with optional additional sites in other areas like Eastern Interior Field Office, Yukon Charley Rivers, Denali National Park, Arctic Coastal Plain, and Bay region.

The work requires 3-person crews to collect data on water quality, physical habitat, riparian vegetation, and other stream characteristics using BLM's AIM protocols between June-September each year. Crews must be able to work in remote locations, often accessing sites via aircraft and camping in primitive conditions. Key personnel requirements include an Aquatic Ecologist/Fish Biologist, two Field Technicians, Project Manager, and Program Manager. All field staff must complete BLM's Lotic AIM training. The contractor is responsible for providing all necessary equipment and coordinating with BLM field offices. Data collection for the initial year must be completed by October 31, 2025, with a contract end date of January 31, 2030. Proposal evaluation will be based on technical approach (hitch schedule, number of crews, project plan), past performance, and price factors.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 140L0625Q0006 – Amendment 0002

BUREAU OF LAND MANAGEMENT

LOTIC AIM

ALASKA CONTRACT

Solicitation 140L0625Q0006 BLM Alaska Issued 2024

This page intentionally left blank.

Contents

1INTRODUCTION5
1.1Project Timeline and Deadlines15
2BACKGROUND16
3SCOPE16
3.1TASK 1 – COORDINATION16
3.1.1Project Lead Requirements18
3.2TASK 2 – DATA COLLECTION18
3.3TASK 3 – QUALITY CONTROL AND DATA TRACKING21
3.4TASK 4 – PROVIDE DATA TO THE FIELD OFFICE(S)22
4EQUIPMENT22
5SCHEDULE23
6KEY PERSONNEL23
7GOVERNMENT FURNISHED PROPERTY24
8CONTRACTOR FURNISHED PROPERTY24
9CONTRACTOR PERFORMANCE ASSESSMENT24
10QUALITY:25
11IDENTIFICATION OF CONTRACT EMPLOYEES26
12BLM CONTACTS26
13ATTACHMENTS27
14INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS28
14.1EVALUATION COMMERCIAL ITEMS28
14.2EVALUATION FACTORS28
14.2.1Technical Factor - Criterion 1: Hitch Schedule28
14.2.2Technical Factor – Criterion 2: Number of Crews28
14.2.3Technical Factor - Criterion 3: Project Plan28
14.2.4Past Performance Factor29
14.2.5Price Factor29
14.3Proposal Submission29

List of Tables

Table 1. CLIN 00010 Sites per project and methods requested5
Table 2. CLIN 00020 Sites per project and methods requested8
Table 3. CLIN 00030 Sites per project and methods requested9
Table 4. CLIN 00040 Sites per project and methods requested11
Table 5. CLIN 00050 Sites per project and methods requested12
Table 6. CLIN 00060 Sites per project and methods requested13
Table 7. Proposed 5-year sampling schedule14
Table 8. Project timeline and deadlines for initial year.15
Table 9. Lotic AIM Roles and Responsibilities17

List of Figures

Figure 1. Map showing the Central Yukon Field Office project area extent6
Figure 2. Map showing the Kobuk-Seward Peninsula project area extent.7
Figure 3. Map showing the Wrangell St Elias project area extent.8
Figure 4. Map showing the Eastern Interior Field Office project area extent.9
Figure 5. Map showing the Yukon Charley project area extent.10
Figure 6. Map showing the Denali National Park and Preserve project area extent.12
Figure 7. Map showing the Arctic Coastal Plain (northern portion of the National Petroleum Reserve) project area extent.13
Figure 8. Map showing the Bay project area extent14

INTRODUCTION

The Bureau of Land Management (BLM) manages over 178 thousand miles of stream within the state of Alaska. The BLM is mandated to conduct land health monitoring to document effectiveness of decisions established in Resource Management Plans, to determine treatment effectiveness, or for habitat evaluation, among other applications. The Assessment, Inventory and Monitoring (AIM) strategy is one of the approved monitoring strategies for land health monitoring. This task order is for data collection and support for the 2025-29 field seasons.

The contractor will be responsible for collecting data at randomly distributed points on BLM administered lands throughout field offices and project areas described in Table 1 (CLIN 00010) and Table 5-X (if additional Option CLINs are exercised). Table 7 outlines a proposed sampling schedule. Typically, 1-2 sites are completed per data during a 12 day sampling hitch (10 field days). Data collection will occur in accordance with the BLM Technical Reference 1735-2 found on the www.blm.gov/aim/resources website. Sample site coordinates will be provided to the selected contractor as specified in Project Timelines and Deadlines (Table 8), at least two months prior to the start of data collection (in Alaska, data collection generally starts in June, but exceptions can be made for specific climatic and hydrologic regimes). The contractor shall provide support in terms of coordination, pre-season support, data collection, data quality assurance and quality control (QA/QC), and data submission as explicitly specified in the roles and responsibilities table (See Scope section below). All processes shall occur in accordance with the most recent versions of information posted on the www.blm.gov/aim/resources website.

Table 1. CLIN 00010 Sites per project and methods requested

CLIN 00010

Project Name
Collection Dates
Total Random and/or Targeted Sites
Methods Requested
Central Yukon Field Office
June 1 – September 31
40-60 stream sites
Core methods

Contingent: Total nitrogen and phosphorus, turbidity Supplemental: surveyed channel cross sections, continuous thalweg profile

Anchorage Field Office (Kobuk-Seward)
June 1 – September 31
40-60 stream sites
Core methods

Contingent: Total nitrogen and phosphorus, turbidity Supplemental: surveyed channel cross sections, continuous thalweg profile

Wrangell St. Elias National Park
June 1 – September 31
30-40 stream sites
Core methods

Contingent: Total nitrogen and phosphorus, turbidity Supplemental: surveyed channel cross sections, continuous thalweg profile

Within the Central Yukon Field Office project area, sites will be randomly located within the project boundary shown in Figure 1. The project boundary is based upon the Central Yukon and Kobuk-Seward planning areas. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Expect that points will fall in BLM-managed land across this entire project area. Sample locations were identified in 2016 and is expected to be in the final season of data collection during this contract period. Viable locations for base camp operations include, but are not limited to, Coldfoot (BLM Marion Creek Administrative site), BLM 7-Mile Administrative Site (just north of the Yukon River, 65.938622, -149.854531), Galena, Manley, and Bettles. No points are located north of the Brooks Mountain Range.

Figure 1. Map showing the Central Yukon Field Office project area extent Within the Anchorage Field Office/Arctic District project area, sites will be randomly located within the Kobuk-Seward Peninsula Planning Area shown in Figure 2. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Sample sites were identified in 2022 and sampling has continued annually since that time. Spike camps along the road system at Tisuk River (64.97149, -166.200221) and Quartz Creek (65.4059331, -164.6557247) have been used for past AIM projects within the Kobuk-Seward West and East project areas. Kotzebue is a viable base location for accessing the Kobuk-Seward North project area. Dahl Creek (66.9425614, -156.8913686) and Bear Creek airstrips (65.4059331, -164.6557247) are viable locations for accessing the Kobuk-Seward Northeast project area.

Figure 2. Map showing the Kobuk-Seward Peninsula project area extent.

Within the Wrangell St. Elias National Park project area, sites will be located on NPS managed lands shown in Figure 3. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Sampling of Wrangell St. Elias is expected to begin in 2025. Viable locations for base camp operations include, but are not limited to Glennallen, Chisana, Slana, and Nebesna.

Wrangell St.Elias

Figure 3. Map showing the Wrangell St Elias project area extent.

Table 2. CLIN 00020 Sites per project and methods requested

CLIN 00020

Project Name
Collection Dates
Total Random and/or Targeted Sites
Methods Requested
Eastern Interior Field Office
June 1 – September 31
40-50 stream sites
Core methods

The Eastern Interior Field Office project area, is described as separate Options (CLIN 00020). If exercised, sites will be randomly located on BLM managed lands within the White Mountains, Steese, 40-Mile, and Draanjik planning areas as shown in Figure 4. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Expect that sites will fall across this entire project area. Initial sampling of BLM lands in this region was completed in 2016 with the exception of the Draanjik planning area. Most sampling on BLM managed lands would include resampling of established sites with a proportion of new randomly selected sites. Viable locations for base camp operations include, but are not limited to, Central, Nome Creek, and Chicken. The Draanjik planning area will likely require basing out of Circle, however, BLM does not have any facilities in this location. The NPS maintains a remote camp at Coal Creek (44 miles east of Circle), which may be available as a base camp location for northern portions of the Eastern Interior Field Office.

Figure 4. Map showing the Eastern Interior Field Office project area extent.

Table 3. CLIN 00030 Sites per project and methods requested

CLIN 00030

Project Name
Collection Dates
Total Random and/or Targeted Sites
Methods Requested
Yukon Charley Rivers National Preserve
June 1 – September 31
30-40 stream sites
Core methods

The Yukon Charley Rivers National Preserve project area, is described as separate Options (CLIN 00030). If exercised, sites will be randomly located on NPS managed lands within the Yukon Charley Rivers National Preserve as shown in Figure 5. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Expect that sites will fall across this entire project area. Sampling in this area was initiated in 2022 and is ongoing. The National Park Service maintains a remote camp at Coal Creek (44 miles east of Circle), which may be available as a base camp location for this project area. Sampling from Eagle may also be a viable option.

Yukon Charley

Figure 5. Map showing the Yukon Charley project area extent.

Table 4. CLIN 00040 Sites per project and methods requested

CLIN 00040

Project Name
Collection Dates
Total Random and/or Targeted Sites
Methods Requested
Denali National Park
June 1 – September 31
30-40 stream sites
Core methods

The Denali National Park and Preserve project area, is described as separate Options (CLIN 00040). If exercised, sites will be randomly located on NPS managed lands as shown in Figure 5. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Expect that sites will fall within 100 nautical miles of Kantishna. Sampling of NPS lands in this region was initiated in 2018 and is ongoing. The National Park Service maintains a remote camp at Kantishna/Moose Creek which will be available as a base camp location for sampling this area. Aviation resources will be provided by the NPS for lotic AIM data collection in this area.

Figure 6. Map showing the Denali National Park and Preserve project area extent.

Table 5. CLIN 00050 Sites per project and methods requested

CLIN 00050

Project Name
Collection Dates
Total Random and/or Targeted Sites
Methods Requested

Arctic Coastal Plain

July 1 – September 15
40-50 stream sites
Core methods

The Arctic Coastal Plain project area is described as separate Options (CLIN 00050). If exercised, plots will be randomly located within the sampling area shown in Figure 6. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Expect that sites will fall across this entire project area. Initial sampling of BLM lands in this region was completed in 2018. Most sampling on BLM managed lands would include resampling of established sites with a proportion of new randomly selected sites. Viable locations for base camp operations include, but are not limited to: Wainwright and Inigok (BLM camp) based on past sampling.

Figure 7. Map showing the Arctic Coastal Plain (northern portion of the National Petroleum Reserve) project area extent.

Table 6. CLIN 00060 Sites per project and methods requested

CLIN 00060

Project Name
Collection Dates
Total Random and/or Targeted Sites
Methods Requested

Anchorage Field Office (Bay)

June 1 – September 31
40-50 stream sites
Core methods

The Bay Project Area is described as separate Options (CLIN 00060). If exercised, plots will be randomly located within the sampling area shown in Figure 7. Geospatial data and web map services showing project boundaries can also be found at https://www.blm.gov/services/geospatial/GISData/alaska. Expect that sites will fall across this entire project area. Viable locations for base camp operations given the proximity of BLM managed lands include, but are not limited to, Dillingham, King Salmon, and Platinum.

Figure 8. Map showing the Bay project area extent

Across all project areas, accommodations at BLM administrative sites may be available but cannot be guaranteed.

A proposed 5-year schedule is outlined in the Table 7. Locations where sampling has previously taken place can be viewed online at the AIM data portal.

Table 7. Proposed 5-year sampling schedule

Proposed Schedule 2025-2029
2025
2026
2027
2028
2029
project area
base camp
project area
base camp
project area
base camp
project area
base camp
project area
base camp
Central Yukon Field Office (CYFO)
CYFO
Galena
CYFO
Yukon Crossing/ Manley Hot Springs
Anchorage Field Office (Kobuk-Seward)
Kobuk-Seward
Nome
Kobuk-Seward
Quartz Creek

Anchorage Field Office (Bay)

Bay
Dillingham/Platinum/King Salmon
Bay
Dillingham/Platinum/King Salmon
Bay
Dillingham/Platinum/King Salmon
Yukon Charley Rivers
Yukon Charley Rivers
Coal Creek
Yukon Charley Rivers
Coal Creek
Yukon Charley Rivers
Coal Creek

Eastern Interior Field Office (EIFO)

40-Mile/ Steese/ White Mts
Chicken Field Station/ Central
40-Mile/ Steese/ White Mts
Chicken Field Station/ Central
Draanjik
Circle

Denali NPP

Denali
Kantishna
Denali
Kantishna
Wrangell St. Elias
Wrangell St. Elias
Nebesna/Chisana
Wrangell St. Elias
Nebesna/Chisana

Arctic Coastal Plain (ACP)

ACP
Inigok
ACP
Wainwright
ACP
Inigok

Project Timeline and Deadlines The following table describes the relative timeline of project tasks and deadlines.

Table 8. Project timeline and deadlines for initial year.

Date
Year
Task
Fall/Winter
2024
Project kick-off calls
Spring
2025
Sample site coordinates provided to contractor
May
2025
Attend Lotic AIM field core methods training in Anchorage with post training calibration 2-3 weeks later in Anchorage/Mat-Su or Fairbanks
June
2025
Data collection begins
October 31
2025
All data provided to the BLM-NOC, including macroinvertebrate samples provided to the Utah State University National Aquatic Monitoring Center
October 1 – December 31
2025
BLM will provide office support to Field Data Specialist to complete data QC
December 31
2025
End of Award Period

BACKGROUND

The contractor shall be responsible for collecting data at the number and types of wadeable points indicated in Table 1. Sample reach coordinates will be provided to the selected contractor as specified in Project Timelines and Deadlines above, at least one month prior to the start of data collection (data collection generally starts in June, but exceptions can be made for specific climatic and hydrologic regimes such as those influenced by summer monsoons). The contractor shall provide support in terms of coordination, pre-season support, data collection, data quality assurance (QA), data submission, and macroinvertebrate and water quality submission as explicitly specified in the roles and responsibilities table (See Scope section below). All processes shall occur in accordance with the most recent versions of Technical Reference 1735-2 posted at: https://www.blm.gov/learn/blm-library/agency-publications/technical-references.

Data collection often occurs in remote locations, where cellular connection is unavailable or inconsistent. The BLM recommends that field crews be prepared to camp in primitive conditions over several days and to collect data in multi-day “hitches” to minimize travel time. In some instances, lodging will be provided at BLM field stations at no cost to the contractor. In other instances, lodging may be available from commercial vendors. Lodging and per diem are reimbursable expenses and should be equal to or less than approved federal lodging and per diem rates for the location. The contractor is responsible for all meals and incidentals for the crew. Field crews will be responsible for safety and for appropriate coordination with local field offices regarding access across private lands, rejection of sample points, and/or protection of local resources. Contractor personnel will need to attend general orientation at the local field offices to be informed of local issues, safety measures, and resource concerns. Contractors will be required to include an example hitch schedule and safety plan as part of their submission.

SCOPE

TASK 1 – COORDINATION

After the Contract is awarded, the contractor shall meet with the BLM project leads and state lead and/or monitoring coordinator (via phone or in person at the respective field offices) to discuss the survey design, field methodologies, training, and to answer any questions related to the monitoring effort. At least one month prior to data collection, a second meeting shall be scheduled to acquire reach coordinates (base, oversample, and targeted), discuss sample order strategy, and site/reach evaluation criteria.

Upon request the contractor shall allow BLM employees (including and beyond project leads) or public lands stakeholders such as permittees or members of the public to attend and observe monitoring efforts to ensure data is being collected in compliance with the methodologies as described. (The contractor would not be responsible for providing transportation to the site locations.)

The contractor shall provide the BLM field office project lead or other designated points of contact and the state monitoring coordinator with a hitch schedule including dates of field work, planned sample reaches, and planned access routes prior to each hitch. In order to ensure that the BLM project leads have time to review and comment on the hitch plan, hitch plans shall be provided at least a week in advance. Those hitch plans not submitted sufficiently in advance may not be reviewed by BLM project leads.

Standard:

The contractor shall meet with the BLM project leads and BLM state lead and/or monitoring coordinator at least once prior to the start of data collection. The contractor must also be present for field orientation and calibration exercises[footnoteRef:2] at the start of the field season (see below), for one month of data collection checks (phone-based), and for an end of the field season closeout (phone-based) - these are minimum requirements. The contractor provides a hitch schedule including dates of field work, planned sample reaches, and planned access routes at least five business days prior to each hitch. Given the interdependence of sample reach progress among hitches, and unforeseen circumstances or access challenges, a need for flexibility in specific hitch plans is acknowledged. Contractor shall allow BLM employees (beyond BLM project lead(s)) or BLM Public Land Stakeholders, such as permittees or members of the public to attend and observe field collection days upon request. [2: Calibration exercises typically include at least 2-3 days in the field within 2-3 weeks of field methods training. Calibration locations are weather dependent and could be located in the Anchorage/Mat-Su or Fairbanks, AK areas.]

Table 9. Lotic AIM Roles and Responsibilities

Responsible parties

Project phase
Task
AIM Team
State Lead
Project Lead
Contractor
Contractor Crew
Field season preparation
Hire/onboard field crews

Lead

Equipment purchase, calibration, set-up
Assist
Assist
Lead

Safety training

Lead
Participate
Pre-training materials
Lead
Participate
Participate
Participate
Field training
Lead
Participate*
Participate*
Participate*
Understand the design
Assist
Assist
Lead
Participate
Participate
Identify targeted sample points and points for merging (if applicable)
Assist
Assist
Lead
Assist
Identify reaches for measurement of contingent/supplemental indicators
Assist
Assist
Lead

Office point evaluation

Assist
Lead
Assist
Assist

Provide landowner contacts

Lead
Participate
Crew management & assistance
Trip planning (e.g., timing, access)
Lead
Assist
Assist

Crew check-in and safety

Assist
Lead
Participate
Protocol assistance
Assist
Assist
Lead
Participate
Data collection app assistance
Lead
Assist
Participate
Design & data management
Weekly update of web map
Assist
Lead

Verification of reach sample status

Lead
Assist
Data backup
Assist
Assist
Lead
Data submission
Assist
Assist
Lead

BMI and WQ sample submission

Lead
Participate
QA/QC
Field orientation
Assist
Lead
Lead
Participate

Post-training calibration

Assist
Lead
Lead
Participate

Field QA of data

Lead

Critical concepts QC

Lead
Assist
Participate

QC of field data

Lead
Assist
Participate
Early-season checks
Participate
Lead
Participate
Assist
Participate
End of season checks
Participate
Lead
Participate
Assist
Participate
QC of computed field indicators
Assist

Lead

*See Lotic Data Management and QAQC Protocol for guidelines on who should attend training and how often.

Note: This table should be reviewed at the pre-season meeting and any edits or clarifications made at that point. This table is subject to change.

Project Lead Requirements Project leads are required to lead, assist, and participate in the roles and responsibilities as outlined above (See Table 9), including field trainings, pre-season preparation, office point evaluations, field orientation and calibration with contracting crews, and critical concept/field data QC review.

Project leads will review/approve sample point statuses, following crew manager review of points, using the office evaluation and rejection protocol as outlined in the BLM Field Protocol for Wadeable Lotic Systems. Sample points will be available at least two months prior to field data collection. If a sample point must be rejected in the office or in the field, the contractor will utilize the provided points from the appropriate oversample panel to select an appropriate replacement point. Sample points designated as revisits should be identified with appropriate changes in method collection and with guidance on office plot monument preferences (See monumenting section 3.2.5.1 below).

TASK 2 – DATA COLLECTION

Data collection will begin as specified in Project Timelines and Deadlines. Data collection must occur between June 1st and Sept 30th with a few exceptions for unique climatic and hydrologic conditions. This time generally corresponds to when streams and rivers are at base flow conditions - specifics provided in TR 1735-2 Version 2. Data collection must be completed, and the data submitted to the National AIM Team as specified in Project Timelines and Deadlines. The BLM will be allowed 45 days to ensure the quality of the data prior to final payment being made.

The contractor shall collect data at the number and reaches specified in Table 1. Sample points are typically not accessible by road so aviation resources will be utilized to access most sites, except on rare occasions. In rare instances, sample reaches may be >3 miles from a road (includes 4-wheel drive roads or “jeep trails”) so off trail navigation and moderate hiking often occurs. All reaches will be on wadeable systems. See roles and responsibilities table for specifics regarding BLM versus contractor roles for office and field evaluations, trip planning, data collection, protocol assistance and other data collection related tasks. The AIM-NAMF Field Protocol for Wadeable Lotic Systems (TR 1735-2 Version 2), Evaluation and Design Management Protocol, Data Management and QA/QC Protocol, and Technology and Applications Manual for more information on field methods, reach evaluation, data management, and technology. These protocols are available at https://www.blm.gov/documents/national-office/blm-library/technical-reference/aim-national-aquatic-monitoring-0.

At each reach the contractor shall collect data in accordance with the AIM National Aquatic Monitoring Framework: Field Protocol for Wadeable Lotic Systems (TR 1735-2 Version 2).

All Core Methodologies will be utilized including:

4.0Reach Evaluation
5.0Water Quality
5.1pH, Specific Conductance, Temperature
6.0Benthic macroinvertebrates. The contractor does not need to budget for the processing of these samples.
7.0Physical Habitat and Canopy Cover
7.1Channel Widths
7.2Floodplain Connectivity
7.2.1Bankfull Height
7.2.2Bench Height
7.3Bank Stability and Cover
7.4Canopy Cover
7.5Streambed Particle Sizes
7.6Large Wood
7.7Pool Dimensions
8.0Riparian Vegetation
8.1Priority Noxious Riparian Vegetation

Covariates

7.9Flood-prone width
7.10Slope
9.0Human influences
10.Photos

In addition to the Core AIM Methodologies, the following contingent and supplemental data may also be collected at each reach based on field office designs. See Tables 1-3 for specific indicators requested for this Task Order:

Possible contingent or supplemental indicators include:

Water quality

•Water sample collection (NOTE: contractor does not need to budget for the processing of samples or supplies to collect the sample)
•Turbidity

Instream physical habitat

•Pool tail fines
•Surveyed bankfull channel cross sections
•Continuous thalweg profile

Biodiversity and riparian habitat

•Alaska Supplemental Protocol - Riparian Vegetation Cover and Complexity and Priority Noxious Vegetation
•eDNA (NOTE: contractor does not need to budget for sampling equipment or supplies.)

Data collection shall occur using cross-sectional transects (typically 11 main transects and 10 intermediate transects) arranged throughout the reach. Most measurements are taken at transects, but a few are taken between transects, at a single transect only or at the reachwide scale. All questions regarding monitoring methodology that are not answered by the AIM National Aquatic Monitoring Framework: Field Protocol for Wadeable Lotic Systems (TR 1735-2 Version 2) shall first be fielded by the contractor and then the BLM point of contact if further guidance is needed. Please note specific instructions on keeping water quality samples at appropriate temperatures. Arrangements need to be made up front for the storage of water quality samples at the local field office, as well as macroinvertebrate samples in some instances.

The contractor shall record data in electronic format using BLM applications for data capture and geotagging photographs in the field. Only electronic data shall be submitted to the BLM-NOC after review and all final data must be received as specified in Project Timelines and Deadlines.

Contractor is responsible for providing and setting up the electronic capture device (iPads preferred - see AIM website for specific guidance on Lotic AIM gear) with all specified applications as outlined in the Lotic Technology Manual. The iPad needs to have a cellular data plan with a provider that is appropriate for the project area. The BLM has established databases to ingest and manage all data; therefore, unless otherwise noted, no data management services are requested beyond data collection and QA/QC by field personnel.

If a reach must be rejected in the field, in accordance with the standards outlined in the Lotic Evaluation and Design Management Protocol the contractor shall move on to one of the oversample points provided, as directed. The “fate” of sample points will be tracked and provided with the monitoring data.

The contractor shall coordinate with BLM regarding private land access issues. If private land will be crossed in the process of collecting the data, the contractor shall contact the private landowner to acquire permission to cross their land after obtaining permission and contact info from the BLM. Contact information will be provided by the BLM field office project lead, if available. This will occur before the contractor crosses private land to comply with State law.

The contractor shall be responsible for reach monumenting, which includes a minimum of photos, distinct geographic features, and GPS coordinates. If required, more involved monument types will be specified by the associated BLM Project Lead, and materials will be furnished by the BLM if desired. For example, reach markers such as engraved or stamped aluminum survey caps and fence posts may be utilized.

Standard:

All data to be provided as specified in Project Timelines and deadlines as specified above. Additionally, raw data files shall be uploaded for review at the end of each hitch. All points are sampled within the specified timeframes. Data must be approved by the appropriate BLM field office prior to final data submission. The data shall be collected using the required methodologies and will be 99% complete and accurate.

TASK 3 – QUALITY CONTROL AND DATA TRACKING

The contractor shall follow all data management and Quality Assurance/Quality Control steps as outlined within the Lotic Data Management and QA/QC Protocol. The contractor will also follow the Lotic Evaluation and Design Management Protocol for reach tracking as described in the data management protocol noted above.

During or before the first hitch, the contractor shall work with the BLM project lead(s) to complete a field orientation and calibration (See Table 9). Field orientation and calibration is described in detail in the Lotic Data Management and QA/QC Protocol and involves spending 2-3 days in the field with the crew to review processes for identifying critical concepts of TR 1735-2 Version 2 (e.g., bankfull, scourline, and thalweg), as well as riparian vegetation, across a diversity of stream and river types. A calibration exercise is also conducted with BLM and contractor staff leading the effort to assess the precision and accuracy of the crew’s data at a test reach. At the end of each hitch, the contractor shall meet with BLM field office project lead(s) to review critical concepts and photos within the data collection application as a final step in the QC process prior to submitting the data (See Roles and Responsibilities table). If the project lead(s) cannot meet in person to view the reach summary on the iPad, a file can be exported and provided to the project lead for review. Final data shall be submitted via Survey 123.

The BLM will furnish the contractor with shapefiles of the sample points and associated GPS locations, BLM landownership and other shapefiles necessary to evaluate and implement the sample design. All this information is being provided online using ESRI web maps. Upon request the BLM will provide the contractor with any other GIS data needed to complete the project. The contractor shall track the fate of sample reaches using web maps and other online tools following guidance in the Lotic Reach Evaluation and Design Management Protocol. All data shall be managed in accordance with the Lotic Data Management and QA/QC Protocol.

Standard:

Quality of data submitted to the BLM demonstrates that QA/QC has occurred after each hitch including the submission of results from post-training calibration exercises. The fate of all sampled and evaluated reaches is documented in the web map. The BLM will be allowed 45 days to ensure data quality prior to acceptance.

TASK 4 – PROVIDE DATA TO THE FIELD OFFICE(S)

All data shall be provided to the BLM in an electronic format by the date specified in Project Timelines and Deadlines above, and as described in Section 3.3. Final field data shall be submitted within the Field Maps and Survey 123 applications, while the fate of sampled and evaluated reaches shall be tracked in the webmap. A complete project implementation report shall be submitted at the end of the field season as specified above in Project Timelines and Deadlines.

Standard:

BLM receives the data in Survey 123 as described in Tasks 2 and 3. All final data and a completed implementation report is received as specified in Project Timelines and Deadlines.

EQUIPMENT

The contractor shall need the following equipment to conduct this monitoring:

· All Lotic AIM gear listed in the equipment checklist provided at: https://www.blm.gov/documents/national-office/blm-library/technical-reference/aim-national-aquatic-monitoring-0.

· Electronic device for AIM data capture; Lotic AIM gear list specifications provided at: https://www.blm.gov/documents/national-office/blm-library/technical-reference/aim-national-aquatic-monitoring-0

· Equipment required to collect AIM supplemental indicators (e.g., surveyed cross section, continuous thalweg profile).

SCHEDULE

Date of award through January 31, 2030.

KEY PERSONNEL

Historically, a minimum of 3-person crews have been required at each monitoring reach. Collectively, the individuals who participate in collecting monitoring data will need to have the following qualifications or experience:

· Aquatic Ecologist or Fish Biologist: Must be proficient in the identification of stream habitat features, and basic habitat assessments methodologies of geomorphic features. Qualifications may be met through education, experience, or a combination.

· Education: Bachelor’s Degree in Fisheries, Hydrology, Biology, Ecology, or other Natural Resources with at least 9 semester hours in fisheries or hydrology focused courses. Courses in such areas as fluvial geomorphology, fisheries assessment or techniques, fisheries management, freshwater ecology, hydrologic principles, and watershed management are acceptable subjects.

· Experience: minimum of 1 year field data collection assessing stream or river habitat conditions

· Field Technician I (two): Background in natural resources, with experience conducting field data collection. Qualifications may be met through education, experience, or a combination. Conducts field-based monitoring.

· Education: At least halfway towards a bachelor’s degree in any biology, ecology or natural resources field.

· Experience: minimum of 1 year field data collection.

· Project Manager: Demonstrated specialized experience in all service areas requested. Provides leadership to coordinate and oversee efforts of multiple crews or personnel associated with projects. Develops project plans, budgets, and ensures completion of project deliverables and objectives. Provides technical advice on project goals and associated disciplines, techniques, and services. Project Manager shall: (1) provide overall management of the Contracts issued; (2) ensure compliance with all applicable Federal, State, Local, and Department of the Interior regulations and policy, as well as the Contract terms and conditions; (3) monitor and control quality of the Contracts; (4) assign personnel consistent with Contract requirements. (Aquatic ecologist may also function as the project manager)

· Education: Bachelor’s Degree.

· Experience: minimum of 5 years.

· Program Manager: Specialized experience in support services. Provides leadership in program execution and development, project management, and personnel management. Coordinates resources needed to achieve program objectives and provides technical advice regarding terrestrial and lentic monitoring. Program Manager shall: (1) provide overall management of this contract; (2) ensure compliance with all applicable Federal, State, Local, and Department of the Interior regulations and policy, as well as the contract terms and conditions; (3) monitor and control quality of the contract; (4) assign personnel consistent with Contract requirements.

· Education: Bachelor’s Degree

· Experience: minimum of 5 years.

· All individuals present for data collection must have successfully completed Lotic AIM core methods training during the year in which data collection is to occur (information about these trainings is available at https://www.blm.gov/aim/strategy).

· Training will be provided by the BLM’s National Operations Center with support by BLM State Leads and Aquatic Resources Program staff in Alaska.

· Contractor staff must complete online training materials before attending field methods training.

· If a technician needs to be replaced within a field season by a technician who has not attended training in last two years, then a project manager, who is trained in AIM within the last two years, must accompany the new technician in the field for the first three reaches. Furthermore, all pre-training materials must also be completed prior to collecting data.

GOVERNMENT FURNISHED PROPERTY

Any information including GIS data needed to complete the project will be furnished upon request. The government will not supply any other property for completion of the data collection projects. (Note: At the indicated based camps the government may provide aviation fuel: please see the quote schedule for specific locations and the applicable conditions.)

CONTRACTOR FURNISHED PROPERTY

Contractor is responsible for all transportation, equipment, and incidentals necessary to complete the monitoring studies in accordance with the following specifications/directions.

CONTRACTOR PERFORMANCE ASSESSMENT

After completion of a task order, a task order evaluation will be completed in the Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov/ . A CPARS shall be done for awards over $250,000.00.

QUALITY:

All work shall be checked and technically reviewed and approved in accordance with BLM AIM policies, directives, and guidelines.

Quality shall be measured based on the following:

PERFORMANCE

OBJECTIVE

PERFORMANCE STANDARD
Acceptable Quality Level (AQL)
METHOD OF SURVEILLANCE
For all submittals per the PWS
Timeliness – All task order documentation and task order requirements submitted within required milestone timeframe(s).

Accuracy – all documents conform to formatting requirements, agency directives, department directives and the Federal Acquisition Regulations.

Professional – All Documents are well organized, grammatically correct and demonstrate sound professional evaluation and analysis.

95%
Reviewed by BLM Project Lead

PWS Task 3.1

The contractor shall meet with the BLM project leads and BLM state monitoring coordinator on at least one occasion and shall allow other BLM employees or BLM Public Land Stakeholders, such as permittees or members of the public to attend and observe field collection days upon request.
99%
Reviewed by BLM Project Lead
PWS Task 3.2
By October 31, 2024, all data will be submitted to the BLM-NOC and water quality and macroinvertebrate samples to the Utah State University National Aquatic Monitoring Center. Data must be approved by the appropriate BLM field office prior to submittal. The data will be collected using the required methodologies and will be 99% complete and accurate.
99%
Reviewed by BLM Project Lead
PWS Task 3.3
Quality of data submitted to the BLM demonstrates that QA/QC has occurred. A fully completed Design Management Spreadsheet will be submitted to the BLM upon completion. Raw Data Entry and edited Data Analyses files will be submitted to the BLM upon completion. The BLM will be allowed 45 days to ensure data quality prior to acceptance.
100%
Reviewed by BLM Project Lead
PWS Task 3.4
BLM receives the data in Survey 123 and web maps as described in Task 2 and 3. Data is received by October 31, 2024. Data is accessible and usable for analysis purposes. A complete project implementation report is submitted at the end of the field season (October 31, 2024).
100%
Reviewed by BLM Project Lead

IDENTIFICATION OF CONTRACT EMPLOYEES

All contract personnel are required to identify themselves as contractors. Whether attending meetings, answering Government telephones, or working in other situations where their contractor status is not obvious to third parties, they must make their status known to avoid creating an impression that they are Government employees.

BLM CONTACTS

Bureau of Land Management Alaska State Office 222 West 7th Avenue, #13 Anchorage, AK 99513

Contracting Officer’s Representative Tina Boucher E-mail: tvboucher@blm.gov Bureau of Land Management Alaska State Office 222 W 7th Avenue #13 Anchorage, AK 99513

Nicole Hayes E-mail: mnhayes@blm.gov Bureau of Land Management Alaska State Office 222 W 7th Avenue #13 Anchorage, AK 99513

Contracting Officer:

Laura Egli National Operations Center Acquisitions Department of Interior / Bureau of Land Management Email: legli@blm.gov

Contract Specialist:

Casey Carlson National Operations Center Acquisitions Department of Interior / Bureau of Land Management Email: clcarlson@blm.gov

ATTACHMENTS

Attachment 1 – Quote Schedule Appendix 1 – Appendix 2 – Appendix 3 –

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

EVALUATION COMMERCIAL ITEMS

BLM will conduct this procurement using FAR 13.5 Simplified Procedures for Certain Commercial Products and Commercial Services and evaluate the proposals using Per FAR Part 13.106-2(b) conducting by comparative evaluation of offerors. This solicitation is not stating nor required to state the relative importance assigned to each evaluation factor and/or sub factor (FAR 13.106-1(a)(2)).

1.Technical:
2.Past Performance
3.Price:

EVALUATION FACTORS

The following factors shall be used to evaluate the offers to determine if an offeror provides a sound, compliant approach that meets the requirements of the specifications and demonstrates a thorough knowledge and understanding of those requirements.:

Technical Factor - Criterion 1: Hitch Schedule HITCH SCHEDULE: The offeror shall submit a sample hitch schedule (day by day activities per hitch) for this requirement and will be evaluated on how well the schedule aligns with the work needed in the PWS.

Technical Factor – Criterion 2: Number of Crews NUMBER OF CREWS: Offeror shall submit the number of crews and crew schedule for this requirement (proposed schedule for multiple crews). The offeror shall be evaluated on whether the number of crews and schedule proposed per the PWS requirement seems reasonable given the work requested.

Technical Factor - Criterion 3: Project Plan PROJECT PLAN: The offeror shall submit a project plan (10-font with ¾” margins). The project plan shall include the overall project approach, project assumptions, equipment requirements, personnel resumes, and certifications/qualifications, and or project risks. The project plan shall not exceed six pages. Any pages (other than the personnel pages, and equipment requirements) in excess of this length will not be evaluated. The project plan shall be evaluated on how well the offeror addresses the items above. Please note that the vendors shall include the pricing of the specialized equipment in the quote schedule with the labor quotes. Moreover, Vendors are also reminded that charging the government rental for (an) item(s) they own is a disallowable expense.

Past Performance Factor The government shall review the offeror’s past performance, if applicable and present in CPARS that shall be recent, (within the last 3-years) and relevant to the requirements. (Note: If the contractor has no CPARS on record, they shall receive a neutral rating).

Price Factor The price shall be determined fair and reasonable based on Two-criteria:

Criterion 1: Labor Costs Criterion 2: Travel/Lodging Proposal Submission Technical Proposal: Shall include the project plan, hitch schedule, the number of crews and crew schedule needed to complete the work in the PWS.

Price Proposal: The offeror shall submit a price proposal. The price proposal shall be submitted utilizing the attached excel price spreadsheet (Attachment 2).

Proposal Due Date: To Be Determined. Proposals shall be submitted electronically by e-mail to legli@blm.gov and clcarlson@blm.gov.

image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image1.png

File details come from the government source that posted it. Updated .