B08. Attachment 0004 - Preventive Maintenance List by Date.pdf
PDF 321 KB Posted
- Attached to
- PBA Industrial Equipment Maintenance FY26
- Solicitation number
- W519TC26QA124
About this file
This document is a Preventive Maintenance Contractor Schedule for an Incinerator Complex covering the full calendar year, divided into bi-weekly periods for each month.
The schedule specifies preventive maintenance tasks for 19 major equipment items at the facility, including multiple air compressors (Atlas Copco stationary, Ingersoll-Rand T-20, T-30, and standard models), shredders (Saturn, SSI Rotary Shear, PII Paper, Komar, and Shred Pax systems), balers (DeHart), crushers (Marathon Drum), compactors (Komar Auger), heat pumps and air conditioning units (Bard and Liebert Minimate 2), and electrical infrastructure (dry type transformers, motor control centers, and switchboards). Maintenance frequencies range from bi-weekly lubrication and inspection tasks to monthly fluid and filter checks, quarterly bolt torque verification and alignment checks, semi-annual electrical inspections, and annual component replacements and fluid changes. Specific tasks include bearing lubrication via alemite fittings, gearbox oil level checks, hydraulic reservoir monitoring, belt and conveyor inspection, cutter blade sharpening, hose deterioration assessment, and electrical connection verification. Tasks requiring certified electricians are segregated and performed semi-annually on transformers and motor control centers. The schedule indicates LOTO (Lockout/Tagout) requirements for certain maintenance activities and references manufacturer operation and maintenance manuals for specific torque values and procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preventive Maintenance Contractor Schedule for Incinerator Complex Jan. 1-15
Item 3: ATLAS COPCO STATIONARY AIR COMPRESSOR B. During operation: Check readings on display. Monthly C. Check oil level (G1). Monthly D. Check air filter service indicator (VI). Monthly E. Drain condensate (Dua). Monthly
Item 4: BARD HEAT PUMP AND AIR CONDITIONERS
A. Replace the filter. Every month.
Item 9: SSI Rotary Shear Shredder
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly H. Clean any material from shredder area and around the cleaning fingers. Monthly I. With the machine running (check with operations) and the oil temperature above 50 F, check the hydraulic filters for red indicator, if the indicator is red, change the filters. Monthly J. Remove the endplate bearing covers. Torque eight Allen Hex head bolts on locknut to 60 foot/pounds.
Torque in a cross pattern as shown in the manual. Every 3 Months K. Torque all bolts on the power pack, the shredder and all conveyors. Make sure that all retaining bolts on the machine are torque to the proper specifications per bolt size and grade. Every 3 Months L. Check all bolts and splices on conveyors; also check the belting for cuts, frays or tears. Every 3 Months M. Check all wipers for on the belts for wear. Every 3 Months N. Check conveyor belts for alignment. Adjust if necessary. Every 3 Months O. Check all set screws and retaining bolts on the equipment. Every 3 Months
Item 15: PII (Paper) Shredder
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly
Item 16: Marathon Drum Crusher
A. Lubricate ram guidance system at zerks on side of unit with general purpose grease. Every month B. Check external hoses for chafing, rubbing, or other deterioration and damage. Every month C. Check for any obvious unsafe conditions, such as electrical lines or operator obstructions, in compactor area. Every month D. Check oil level in hydraulic reservoir. Maintain ¾ full level in sight glass. Every month E. SC Units-hose behind ram-wash unit out. Every month F. Check functional operation of standard controls and options (stop button, timers, lights, etc.). Every 3 months G. Adjust ram bottom wiper strip. Every 3 months H. Check hydraulic cylinder and internal hoses for leakage; hoses for chafing and wear. Every 3 months
Preventive Maintenance Contractor Schedule for Incinerator Complex Jan. 1-15
I. Lubricate ram rear guidance system by applying general purpose grease at wear points. (General Purpose Grease) Every 3 months
J. Lubricate pivots at zerk on each end of cylinder. Every 3 months
Item 17: DeHart Baler
A. Remove excess dirt; oil from power unit using a broom or forced air. Bi-weekly B. Check cylinder pins and bolts. Bi-weekly C. Check platen cylinder rod for damage, nicks, and abrasions. Bi-weekly D. Inspect baler floor for gouging or heavy abrasion. Bi-weekly
Item 18: LIEBERT MINIMATE 2, Control Room A/C
B. Check filters and replace as necessary. Every month.
Item 19: Komar Shredder A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and maintain grease pack in pump/motor steel flex coupling. Bi-weekly
Preventive Maintenance Contractor Schedule for Incinerator Complex Jan. 16-31
Item 5: Ingersoll-Rand Air Compressor, T-20 A. Check oil level. Every Month B. Drain condensate. Every Month C. Clean air filter. Every Month
Item 6: Ingersoll-Rand Air Compressor, T-30
A. Check oil level. Every Month
Item 7: Ingersoll-Rand Air Compressor
Item 9: SSI Rotary Shear Shredder
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly D. Cycle shredder system, always leaving ram cylinder fully retracted after cycling the system. Every 3
Months
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly
Item 13: Shred Pax Shredder System
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Monthly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Monthly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. Monthly D. Check shredder gearbox lubricant 85w-140. Every 3 Months
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Check shredder gearbox lubricant. Bi-weekly E. Check hydraulic reservoir and refill as necessary. Monthly F. Check belts for wear and tear, replace as necessary (LOTO). Monthly G. Check bolts to ensure none have worked loose, the most important being the motor bolts, side-finger bolts and end plate bolts (LOTO). Monthly H. Check cutters sharpness. Rotate cutters if necessary to maintain shape edge or sharper if all edges are dull
(LOTO). Monthly
Item 16: Marathon Drum Crusher
A. Lubricate ram guidance system at zerks on side of unit with general purpose grease. Every month
Preventive Maintenance Contractor Schedule for Incinerator Complex Jan. 16-31
B. Check external hoses for chafing, rubbing, or other deterioration and damage. Every month C. Check for any obvious unsafe conditions, such as electrical lines or operator obstructions, in compactor area. Every month D. Check oil level in hydraulic reservoir. Maintain ¾ full level in sight glass. Every month E. SC Units-hose behind ram-wash unit out. Every month
Item 17: DeHart Baler A. Remove excess dirt; oil from power unit using a broom or forced air. Bi-weekly B. Check cylinder pins and bolts. Bi-weekly C. Check platen cylinder rod for damage, nicks, and abrasions. Bi-weekly D. Inspect baler floor for gouging or heavy abrasion. Bi-weekly E. Check platen guide bar clearance. Monthly F. Check knife clearance. Monthly
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and
H. Clean any material from shredder area and around the cleaning fingers. Monthly
Preventive Maintenance Contractor Schedule for Incinerator Complex Feb. 1-15
Item 3: ATLAS COPCO STATIONARY AIR COMPRESSOR B. During operation: Check readings on display. Monthly C. Check oil level (G1). Monthly
Item 9: SSI Rotary Shear Shredder
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly
G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly
Item 17: DeHart Baler
A. Remove excess dirt; oil from power unit using a broom or forced air. Bi-weekly B. Check cylinder pins and bolts. Bi-weekly
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly
Preventive Maintenance Contractor Schedule for Incinerator Complex Feb. 1-15
G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and
NOTE: This section is to be performed by a certified electrician.
Item 1: DRY TYPE TRANSFORMERS
A. Inspect transformer (de-energized) for dirt on insulating surfaces, and at areas which tend to restrict air flow; for loose connection, for the condition of tap changers or terminal boards; and for general condition of the transformer. Every 6 months
B. Remove any excessive accumulation of dirt on transformer windings or Insulators. Every 6 months
Item 2: SPECTRA SERIES / 8000 LINE, MOTOR CONTROL CENTERS (MCC)
MCC6, MCC1, MCC5, MCC960, MCC3, MCC2
A. (De-energize Equipment) — Remove accumulated dust and dirt.
Use brush, soft cloth, or vacuum cleaner. Every 6 months
B. Wipe all main bus insulators and vertical bus barriers. Every 6 months C. Inspect main and vertical bus joints and main bus supports and tighten if necessary. Every 6 months D. Inspect all wiring from units for deterioration of insulation. Every 6 months E. Remove draw-out units and check stabs and all unit wiring.
Remove accumulated dust from horizontal shelves and in area of stabs. Every 6 months F. Check all starter contacts. Every 6 months
They need only be replaced when nearly all the silver tip is gone and the contact tip support is exposed.
Do not fill the contacts.
Filling or otherwise dressing the contacts only results in lost tip material and reduces starter life.
G. Check all unit wiring for deterioration of insulation and tighten all connections. Every 6 months H. Visually check meters and instruments. Every 6 months I. Check unit door interlocks for proper operation. Every 6 months J. Check all indicating lights and replace as required. Every 6 months Note: If fuse replacement is necessary, always install the same type and rating fuses furnished with the motor control center. Every 3 months or as needed
Item 10: SWITCHBOARD
A. Inspect switchboard, under load to determine if any overheating is occurring. Every 6 months.
B. Re-tighten lugs and joints. Every 6 months
DO NOT open sealed breaker or trip units.
Plated parts may become dark over a period of time due to oxidation. DO NOT Remove discoloration, as it will reduce the thickness of the plating.
Preventive Maintenance Contractor Schedule for Incinerator Complex Feb. 16-29
A. Check oil level. Every Month
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly H. Clean any material from shredder area and around the cleaning fingers. Monthly I. With the machine running (check with operations) and the oil temperature above 50 F, check the hydraulic filters for red indicator, if the indicator is red, change the filters. Monthly
Item 13: Shred Pax Shredder System
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Monthly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Monthly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. Monthly
Item 15: PII (Paper) Shredder
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Check shredder gearbox lubricant. Bi-weekly E. Check hydraulic reservoir and refill as necessary. Monthly F. Check belts for wear and tear, replace as necessary (LOTO). Monthly G. Check bolts to ensure none have worked loose, the most important being the motor bolts, side-finger bolts and end plate bolts (LOTO). Monthly H. Check cutters sharpness. Rotate cutters if necessary to maintain shape edge or sharper if all edges are dull
(LOTO). Monthly
Preventive Maintenance Contractor Schedule for Incinerator Complex Feb. 16-29
B. Check cylinder pins and bolts. Bi-weekly C. Check platen cylinder rod for damage, nicks, and abrasions. Bi-weekly D. Inspect baler floor for gouging or heavy abrasion. Bi-weekly
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and
Preventive Maintenance Contractor Schedule for Incinerator Complex Mar. 1-15
Item 3: ATLAS COPCO STATIONARY AIR COMPRESSOR B. During operation: Check readings on display. Monthly C. Check oil level (G1). Monthly D. Check air filter service indicator (VI). Monthly E. Drain condensate (Dua). Monthly F. Check coolers (Co/Ca) and condenser of dryer; clean if necessary. Every 3 months G. Remove air filter element (AF). Clean by air jets and inspect. Every 3 months H. Remove, dismantle and clean float valve of condensate trap (Mta). Every 3 months I. Check for possible leakages. Every 3 months
Item 8: Komar Auger Compactor
A. (De-energize equipment) Check grinding chamber material build-up. Every 3 Months.
B. Check gear reducer oil levels. Every 3 Months.
C. Check the hopper and hopper walls (both front and rear) to ensure there are no stress cracks or pressure damage. Every 3 Months.
D. Check chain lubrication system/chain lube condition (should not be dry). Refill oil as needed. Every 3
Months.
E. Check the seal/bearing lubricator. Refill grease canister as needed. Every 3 Months.
F. Check all bolts for the correct torque values (Refer to Komar Auger Compactor Operations & Maintenance
Manual, Appendix D). Every 6 Months.
G. Check the main power and motor wiring connections. Every 6 Months.
H. Check and re-torque the stack tightener. Every 6 Months.
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly H. Clean any material from shredder area and around the cleaning fingers. Monthly I. With the machine running (check with operations) and the oil temperature above 50 F, check the hydraulic filters for red indicator, if the indicator is red, change the filters. Monthly
Item 15: PII (Paper) Shredder
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly
B. Check external hoses for chafing, rubbing, or other deterioration and damage. Every month C. Check for any obvious unsafe conditions, such as electrical lines or operator obstructions, in compactor area. Every month
B. Check cylinder pins and bolts. Bi-weekly
Item 19: Komar Shredder
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and maintain grease pack in pump/motor steel flex coupling. Bi-weekly H.
I. Torque all bolts on the power pack, the housing, the shredder and all conveyors. Make sure that all retaining bolts on the machine are torque to the proper specifications per bolt size and grade. Every 3 Months
J. Check all bolts and splices on conveyors; also check the belting for cuts, frays or tears. Every 3 Months K. Check all flow/breaker bars, hard surface or replace as required. Every 3 Months L. Check conveyor belts for alignment. Adjust if necessary. Every 3 Months M. Check access panels and ensure mounting hardware is tight. Check push buttons, indicator lights, and connections. Check control system including conduit and wiring. Perform diagnostic check. Every 3 Months
N. Check all set screws and retaining bolts on the equipment. Every 3 Months
Preventive Maintenance Contractor Schedule for Incinerator Complex Mar. 16-31
A. Check oil level. Every Month
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 11: Komar Auger Compactor A. (De-energize equipment) Check grinding chamber material build-up. Every 3 Months.
B. Check gear reducer oil levels. Every 3 Months.
C. Check the hopper and hopper walls (both front and rear) to ensure there are no stress cracks or pressure damage. Every 3 Months.
D. Check chain lubrication system/chain lube condition (should not be dry). Refill oil as needed. Every 3
Months.
E. Check the seal/bearing lubricator. Refill grease canister as needed. Every 3 Months.
F. Check all bolts for the correct torque values (Refer to Komar Auger Compactor Operations & Maintenance
Manual, Appendix D). Every 6 Months.
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly
G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Monthly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Monthly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. Monthly
Item 15: PII (Paper) Shredder
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors
Preventive Maintenance Contractor Schedule for Incinerator Complex Mar. 16-31
D. Check shredder gearbox lubricant. Bi-weekly E. Check hydraulic reservoir and refill as necessary. Monthly F. Check belts for wear and tear, replace as necessary (LOTO). Monthly G. Check bolts to ensure none have worked loose, the most important being the motor bolts, side-finger bolts and end plate bolts (LOTO). Monthly H. Check cutters sharpness. Rotate cutters if necessary to maintain shape edge or sharper if all edges are dull
(LOTO). Monthly
Item 17: DeHart Baler
A. Remove excess dirt; oil from power unit using a broom or forced air. Bi-weekly B. Check cylinder pins and bolts. Bi-weekly C. Check platen cylinder rod for damage, nicks, and abrasions. Bi-weekly D. Inspect baler floor for gouging or heavy abrasion. Bi-weekly
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and
Preventive Maintenance Contractor Schedule for Incinerator Complex April 1-15
Item 3: ATLAS COPCO STATIONARY AIR COMPRESSOR B. During operation: Check readings on display. Monthly C. Check oil level (G1). Monthly
Item 9: SSI Rotary Shear Shredder
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly H. Clean any material from shredder area and around the cleaning fingers. Monthly I. With the machine running (check with operations) and the oil temperature above 50 F, check the hydraulic filters for red indicator, if the indicator is red, change the filters. Monthly
Item 13: Shred Pax Shredder System
D. Check shredder gearbox lubricant 85W-140. Every 3 months E. Check knife/spacer tightness (LOTO). Every 6 months F. Check bolts to ensure none have worked loose, the most important being the motor bolts, side-finger bolts and end plate bolts (LOTO). Every 6 months
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly
Item 16: Marathon Drum Crusher
A. Lubricate ram guidance system at zerks on side of unit with general purpose grease. Every month B. Check external hoses for chafing, rubbing, or other deterioration and damage. Every month C. Check for any obvious unsafe conditions, such as electrical lines or operator obstructions, in compactor area. Every month D. Check oil level in hydraulic reservoir. Maintain ¾ full level in sight glass. Every month E. SC Units-hose behind ram-wash unit out. Every month F. Check functional operation of standard controls and options (stop button, timers, lights, etc.) Every 3 months G. Adjust ram bottom wiper strip. Every 3 months H. Check hydraulic cylinder and internal hoses for leakage; hose for chafing and wear. Every 3 months I. Lubricate ram rear guidance system by applying general purpose grease at wear points. (General Purpose
Grease) Every 3 months
Preventive Maintenance Contractor Schedule for Incinerator Complex April 1-15
J. Lubricate pivots at zerk on each end of cylinder. Every 3 months K. Inspect seal for abrasions. Every 6 months L. Clean hydraulic filter. Every 6 months
a. Filter may be removed from unit by disconnecting union on suction side of pump, removing four bolts retaining cover plate, and lifting filter from reservoir.
b. Care should be exercised in cleaning filter to insure the element is not torn. Clean with soft brush and standard industrial solvent.
c. Replace filter after cleaning; tighten union securely. Pump noise and “crackle” sound is most often caused by air entering pump suction line. Tightening suction fittings will usually eliminate such problems.
B. Check cylinder pins and bolts. Bi-weekly
B. Check filters and replace as necessary. Every month
Item 19: Komar Shredder
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and
Preventive Maintenance Contractor Schedule for Incinerator Complex April 16-30
A. Check oil level. Every Month
Item 6: Ingersoll-Rand Air Compressor
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly D. Cycle shredder system, always leaving ram cylinder fully retracted after cycling the system. Every 3
Months
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly
G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Monthly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Monthly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. Monthly
Item 15: PII (Paper) Shredder
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Check shredder gearbox lubricant. Bi-weekly E. Check hydraulic reservoir and refill as necessary. Monthly F. Check belts for wear and tear, replace as necessary (LOTO). Monthly G. Check bolts to ensure none have worked loose, the most important being the motor bolts, side-finger bolts and end plate bolts (LOTO). Monthly H. Check cutters sharpness. Rotate cutters if necessary to maintain shape edge or sharper if all edges are dull
(LOTO). Monthly I. Check bolts to ensure none have worked loose, the most important being the motor bolts, side-finger bolts and endplate bolts (LOTO). Every 6 Months J. Check cutters sharpness. Sharpen cutters as necessary to maintain sharp edges (LOTO). Annually
Preventive Maintenance Contractor Schedule for Incinerator Complex April 16-30
B. Check cylinder pins and bolts. Bi-weekly C. Check platen cylinder rod for damage, nicks, and abrasions. Bi-weekly D. Inspect baler floor for gouging or heavy abrasion. Bi-weekly
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and maintain grease pack in pump/motor steel flex coupling. Bi-weekly H. Clean any material from shredder area and around the cleaning fingers. Monthly O. Change main system hydraulic filters and fluid as required. Annually P. Change shredder head gearbox oil. When changing the gearbox oil, be sure to remove the gearbox cover and inspect all the gears. Also, check for loose set screws at shaft. Clean the gearbox with a light oil or mineral spirits. With the oil drained, remove both bearing covers at the gearbox and torque the bolts on each locknut according to the grade and size of the bolts. Annually
Preventive Maintenance Contractor Schedule for Incinerator Complex May 1-15
Item 3: ATLAS COPCO STATIONARY AIR COMPRESSOR B. During operation: Check readings on display. Monthly C. Check oil level (G1). Monthly
Item 9: SSI Rotary Shear Shredder
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly H. Clean any material from shredder area and around the cleaning fingers. Monthly I. With the machine running (check with operations) and the oil temperature above 50 F, check the hydraulic filters for red indicator, if the indicator is red, change the filters. Monthly
Item 15: PII (Paper) Shredder
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly
Item 16: Marathon Drum Crusher
A. Lubricate ram guidance system at zerks on side of unit with general purpose grease. Every month B. Check external hoses for chafing, rubbing, or other deterioration and damage. Every month C. Check for any obvious unsafe conditions, such as electrical lines or operator obstructions, in compactor area. Every month
B. Check cylinder pins and bolts. Bi-weekly C. Check platen cylinder rod for damage, nicks, and abrasions. Bi-weekly D. Inspect baler floor for gouging or heavy abrasion. Bi-weekly G. Replace oil filter. Every 6 months H. Replace breather cap. Every 6 months I. Take oil sample and replace if necessary. Every 6 months
B. Check filters and replace as necessary. Every month
Preventive Maintenance Contractor Schedule for Incinerator Complex May 1-15
Item 19: Komar Shredder A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and maintain grease pack in pump/motor steel flex coupling. Bi-weekly H.
I. Torque all bolts on the power pack, the housing, the shredder and all conveyors. Make sure that all retaining bolts on the machine are torque to the proper specifications per bolt size and grade. Every 3 Months
J. Check all bolts and splices on conveyors; also check the belting for cuts, frays or tears. Every 3 Months K. Check all flow/breaker bars, hard surface or replace as required. Every 3 Months L. Check conveyor belts for alignment. Adjust if necessary. Every 3 Months M. Check access panels and ensure mounting hardware is tight. Check push buttons, indicator lights, and connections. Check control system including conduit and wiring. Perform diagnostic check. Every 3
Preventive Maintenance Contractor Schedule for Incinerator Complex May 16-31
A. Check oil level. Every Month B. Drain condensate. Every Month
D. Change oil. Every 6 Months
B. Drain condensate. Every Month
B. Drain condensate. Every Month
A. Lubricate the endplate bearings and outboard side of shredder head via the two (2) alemite fittings located on each end of the bearing housing (EP1). Bi-weekly
B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal conveyor as necessary. (Refer to SSI Rotary Shear Shredder book) Bi-weekly
Item 12: Saturn Shredder
A. Lubricate the endplate bearings on the shredder head and the shredder gearbox at the right end of the motor mount; 6-8 shots (EP1). Bi-weekly
B. Check gearbox oil; it should be three-quarters full in the sight glass. Bi-weekly C. Grease the rollers and the drive couplers on all conveyors and any additional equipment. Bi-weekly D. Grease the fittings beside and in back of the coupling for the input shaft front beings; 6-8 shots. Bi-weekly E. Grease electric motors; 2-4 shots. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Bi-weekly H. Clean any material from shredder area and around the cleaning fingers. Monthly I. With the machine running (check with operations) and the oil temperature above 50 F, check the hydraulic filters for red indicator, if the indicator is red, change the filters. Monthly J. Remove the endplate bearing covers. Torque eight Allen Hex head bolts on locknut to 60 foot/pounds.
Torque in a cross pattern as shown in the manual. Every 3 Months K. Torque all bolts on the power pack, the shredder and all conveyors. Make sure that all retaining bolts on the machine are torque to the proper specifications per bolt size and grade. Every 3 Months L. Check all bolts and splices on conveyors; also check the belting for cuts, frays or tears. Every 3 Months M. Check all wipers for on the belts for wear. Every 3 Months N. Check conveyor belts for alignment. Adjust if necessary. Every 3 Months O. Check all set screws and retaining bolts on the equipment. Every 3 Months P. Change shredder head gearbox oil. When changing the gearbox oil, be sure to remove the gearbox cover and inspect all the gears. Also, check for loose set screws at shaft. Clean the gearbox with a light oil or mineral spirits. With the oil drained, remove both bearing covers at the gearbox and torque the bolts on each locknut according to the grade and size of the bolts. Annually
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Monthly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Monthly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate metal
Preventive Maintenance Contractor Schedule for Incinerator Complex May 16-31
A. Lubricate the endplate bearings via fittings located on each end of the bearing cover (EP1?). Bi-weekly B. Inspect the underside of the cutting chamber and remove build-up of shredder material. Bi-weekly C. Make sure associated conveyors are tracking properly and free of excessive buildup. Lubricate conveyors as necessary. Bi-weekly D. Check shredder gearbox lubricant. Bi-weekly E. Check hydraulic reservoir and refill as necessary. Monthly F. Check belts for wear and tear, replace as necessary (LOTO). Monthly G. Check bolts to ensure none have worked loose, the most important being the motor bolts, side-finger bolts and end plate bolts (LOTO). Monthly H. Check cutters sharpness. Rotate cutters if necessary to maintain shape edge or sharper if all edges are dull
(LOTO). Monthly
Item 17: DeHart Baler
A. Remove excess dirt; oil from power unit using a broom or forced air. Bi-weekly B. Check cylinder pins and bolts. Bi-weekly C. Check platen cylinder rod for damage, nicks, and abrasions. Bi-weekly D. Inspect baler floor for gouging or heavy abrasion. Bi-weekly
A. Inspect the machine frame, general structural integrity. Check hopper and ram for wear or damage. Check all hoses and fluid fittings for leaks (retighten as required). Check cutter blades, spacers, and cutting chamber for wear or damage. Check all bearings, shafts, and cutter stacks for tightness. Bi-weekly
B. Check and lubricate the bearings and endplate bearings on the shredder head and the shredder gearbox at the end of the motor mount. Bi-weekly
C. Grease the rollers and the drive couplers and drive chain on all conveyors and any additional equipment.
Bi-weekly
D. Check bearing housing mount bolts. Check drive stack tensioner for proper preload. Check system operation, adjust running parameters as required. Bi-weekly
E. Grease electric motors; as required. Bi-weekly F. Check the hydraulic tank on the power pack for full-mark on the sight gauge. Bi-weekly G. Inspect the power pack and the shredder head for hydraulic leaks; repair any leaks immediately. Check and
Preventive Maintenance Contractor Schedule for Incinerator Complex Jun 1-15
Item 3: ATLAS COPCO STATIONARY AIR COMPRESSOR B. During operation: Check readings on display. Monthly C. Check oil level (G1). Monthly D. Check air filter service indicator (VI). Monthly E. Drain condensate (Dua). Monthly F. Check coolers (Co/Ca) and condenser of dryer; clean if necessary. Every 3 months G. Remove air filter element (AF). Clean by air jets and inspect. Every 3 months H. Remove, dismantle and clean float valve of condensate trap (Mta). Every 3 months I. Check for possible leakages. Every 3 months J. Carry out a LED/display test. Every 6 months N. Replace air filter element (AF). Every year O. If Atlas Copco Roto-injected fluid is used, change oil and oil filters. Every year (GA 125 psi, 1000 hrs) P. Inspect all flexibles/ flexible joints. Every year Q. Replace oil separator (OS) (if necessary). Every year
H. Rub high grade automobile polish on cabinet. Every year
Item 8: Komar Auger Compactor
A. (De-energize equipment) Check grinding chamber material build-up. Every 3 Months.
B. Check gear reducer oil levels. Every 3 Months.
C. Check the hopper and hopper walls (both front and rear) to ensure there are no stress cracks or pressure damage. Every 3 Months.
D. Check chain lubrication system/chain lube condition (should not be dry). Refill oil as needed. Every 3
Months.
E. Check the seal/bearing lubricator. Refill grease canister as needed. Every 3 Months.