B08_Attachment_X_Key_Personnel_Form.pdf

PDF 38 KB Posted

Attached to
TUIN 231534, Rehabilitate George Washington Carver
Solicitation number
140P2023R0029
Issued by

View the file

Other files

File Type Posted
TUIN_231534_140P2023R0029_AMEND_05_0005.pdf PDF
Sol_140P2023R0029_Amd_0005.pdf PDF
Sol_140P2023R0029_Amd_0004.pdf PDF
140P2023R0029_Amend_0004_and_Attach_0004.pdf PDF
140P2023R0029_Amend_0003_and_Attach_0003.pdf PDF
Sol_140P2023R0029_Amd_0003.pdf PDF
Sol_140P2023R0029_Amd_0002.pdf PDF
B09_140P2023R0029-02_0002.pdf PDF
B09_PreBid_Presentation_0001.pdf PDF
B08_Attachment_J-10_PreProposal_Site_Visit__-_MEETING_MAP_1_DRAFT_0001.pdf PDF
Sol_140P2023R0029_Amd_0001.pdf PDF
B11_PreProposal_Site_Visit_TUIN_231534_0001.pdf PDF
B08_Attachment_J-10_Site_Map_0001.pdf PDF
013591_L2_CR_GWC_List_of_Objects_0001.pdf PDF
013591_L1_NH_GWC_List_of_Objects_0001.pdf PDF
140P2023R0029-0001_Amendment_0001.pdf PDF
B08_Attachment_J-10_PreProposal_Site_Visit__-_MEETING_MAP_2_DRAFT_0001.pdf PDF
B08_SubcontractLimitationsWorksheet.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
TUIN_231534_FINAL_CD_PLANS_1_OF_4_BASE_BID.pdf PDF
01_Solicitation_140P2023R0029_12-27-22.pdf PDF
B08_Hazardous_Materials_Form.pdf PDF
TUIN_231534_FINAL_CD_PLANS_4_OF_4_BID_OPTION.pdf PDF
TUIN_FINALCD_SPECS_COMBINED_Add1_7-29-2022.pdf PDF
B08_Att__J-06_TUIN_231534_Reg_Matr_Survey.pdf PDF
B08_Attachment_J-3_DOL_Wage_Decision_AL20220078.pdf PDF
TUIN_231534_FINAL_CD_PLANS_3_OF_4_BASE_BID.pdf PDF
B08_Att__J-04_TUIN_Carver_Museum_HSR_Final.pdf PDF
B08_Att_J-05_JOFOC_Brand_Name_Sealant_REDACTED.pdf PDF
B08_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
Sol_140P2023R0029.pdf PDF
B08_Attachment_X_Key_Trades_Form.pdf PDF
TUIN_231534_FINAL_CD_PLANS_2_OF_4_BASE_BID.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFEROR ___________________________________

RFQ 140P2023R0029

TUIN 213534 Preserve Carver Museum

VOLUME 1 TECHNICAL PROPOSAL

ATTACHMENT X

KEY PERSONNEL

(a) The Contractor shall assign to this contract the following key personnel:

Project Manager:

Job Site Superintendent:

Quality Control Manager*:

Safety Manager:

*Each position may be filled by a separate individual; however, the On-Site Quality Control Manager and the On-Site Safety Manager may be filled by the same qualified individual.

Therefore, at least three (3) individuals are required for Key Personnel. The Job Site Superintendent, On-Site Quality Control Manager, and the On-Site Safety Manager are required to be on-site during all work activities under the Contract.

***ATTACH RESUMES

File details come from the government source that posted it. Updated .