140P2023R0029_Amend_0003_and_Attach_0003.pdf
PDF 1 MB Posted
- Solicitation number
- 140P2023R0029
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2023R0029 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
23153412/27/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/27/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Anne Laporta
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TUIN 231534 - Preserve Carver Museum
PROJECT TEAM:
NPS PM/COR: Romorno Coney
NPS PS/COR: Rexford Canady
NPS CO: Anne LaPorta
NPS CS: Donna Prock
The purpose of this Amendment 003 is to post answers to most of the questions that were submitted prior to the January 26th deadline, post the adjustments to the Scope, and extend the proposal due date.
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 18CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2023R0029/0003
** See attached Q&A document.
** See the summary of changes to the Scope attached here.
** The due date for proposals has been extended to Tuesday, February 28, 2023, at 3:00 PM MT/
5:00 PM ET.
Period of Performance: 04/03/2023 to 04/02/2024
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
140P2023R0029 Amendment 0003 to Solicitation - CONTINUATION SHEET
A. The Solicitation is Amended as follows:
1. The Project title is amended from “PARK PMIS #231534 – Rehabilitate Carver Museum” to
“TUIN 231534 Preserve Carver Museum”. A conforming copy reflecting this correction throughout the Contract will be provided at award.
2. The Project Specifications for Preserve Carver Museum, TUIN 231534, dated July 12, 2022, Addendum 1 – 7/29/2022 (Specifications) lists qualifications of personnel and trades for certain work requirements. The only Key Trade / Subcontractor and Key Personnel required, are listed in SPECIAL REQUIREMENTS 2 – KEY PERSONNEL, and SPECIAL
REQUIREMENT 3 – KEY TRADES, in the Solicitation. The Evaluation Factors and proposal submission requirements are described in SECTION L to the Solicitation, as amended or may be amended (Solicitation), and are the only submission requirements for the proposal. To the extent that proposal submission requirements in the Specifications differ or conflict with the Solicitation, the proposal requirements stated in the Solicitation shall prevail.
3. Solicitation page 7 of 59: Removed “joists” from Option 8 Line on the Bid Schedule.
[The remainder of the Bid Schedule remains unchanged]
4. Solicitation page 15 of 59: Include additional Key Personnel position and clarify:
SPECIAL REQUIREMENT 2: KEY PERSONNEL
(a) Submit resumes for key personnel as identified in this solicitation at Section H and listed (see below). All personnel proposed are subject to substitution requirements contained in this solicitation. There is no preprinted form for this submittal. (if evaluating under experience, move this verbiage under Experience factor as bullet). Resumes should include education level, years of experience in each position, training, certificates, licenses, or other related credentials.
[The remainder of the Special Requirement 2: Key Personnel Clause remains unchanged]
5. Solicitation page 51 of 59, Evaluation Factors, is amended by clarifying that project experience of the general contractor may have been self-performed or in supervising subcontractors, or as a subcontractor, consistent with the “Project Experience Form” to be used for this evaluation Factor:
FACTOR 2 – PROJECT EXPERIENCE AND KEY PERSONNEL EXPERIENCE
SUBFACTOR 2.a – PROJECT EXPERIENCE: Submit the attached "Project Experience" Form addressing specific aspects below to demonstrate your project experience for a minimum of two
(2) and up to five (5) relevant projects successfully completed in the last 10 years or that are at least seventy-five (75%) successfully completed as of the date of your proposal. If you/offeror are
140P2023R0039 Amendment 0003 to Solicitation - CONTINUATION SHEET a joint venture or other legal teaming or partnering entity (e.g., mentor-protégé), clearly describe your role/experience with the project that demonstrates your capability for the project under this
Solicitation. Submit separate forms for each project. NOTE: Submit the same projects for Past
Performance (Factor #5) as submitted under this factor.
Your project experience as the prime contractor, in self-performing work or in supervising subcontractor work, or as a subcontractor, should demonstrate all the following characteristics in one or more of the projects:
▪ Repair and rehabilitation of existing building interiors (commercial use, classroom, office buildings, or similar); and
▪ Exterior brick masonry repair or restoration; and
▪ Repair and rehabilitation of one or more of the following major building systems: HVAC, mechanical, fire protection, or electrical systems.
▪ The magnitude of each project must be a minimum $1,000,000. Note the magnitude of this project as stated in Box 10 of the Form 1442 of the Solicitation is $1,000,000 - $5,000,000 in accordance with FAR 36.204; projects submitted to demonstrate your experience as a prime contractor should be of similar scope, magnitude, and complexity as the subject project.
Each project is not required to have all the scope elements; however, projects should demonstrate your capability as the prime contractor for projects of similar scope, magnitude, and complexity as the subject project.
6. Solicitation page 51 of 59 is amended by correction to the Section reference in this evaluation Factor and addition of Key Personnel experience for the Wood, Sash, Frame and Door Restoration Principal:
FACTOR 2 – PROJECT EXPERIENCE AND KEY PERSONNEL EXPERIENCE
SUBFACTOR 2.b – KEY PERSONNEL EXPERIENCE: Submit resumes for key personnel identified in this Solicitation at Section H SPECIAL REQUIREMENT 2: KEY PERSONNEL of the Solicitation and listed below.
[The remainder of the Special Requirement 3: Key Trades Clause remains unchanged]
B. The Specifications are Amended as follows:
1. Specifications Page 82 of 930: Removed “reinforcing steel joist structure”.
This package includes site work to correct drainage, brick pointing, window and door repairs, glazing and sealants, HVAC equipment and ductwork replacement, reinforcing steel joist structure, and energy/code upgrade to the electrical and lighting systems.
2. Specifications Page 846 of 930: Removed the inspection regarding “Open-Web steel Joists and Joist Girders” and removed reference from Section “Statement of Structural Tests and
Special Inspection”.
140P2023R0039 Amendment 0003 to Solicitation - CONTINUATION SHEET
3. Specifications Pages 324 – 334 are amended to remove affidavit requirements for Wood Sash Restoration Contractor, and other conforming amendments. See ATTACHED pages from SECTION 08 01 20 - WOOD SASH, FRAME AND DOOR RESTORATION.
4. Specifications Pages 84 - 94 are amended to:
a. Clarify the reference to “Collections List” are the lists provided in Amendment 0001 to the Solicitation.
b. Clarify that evaluation criteria for the artifacts handler subcontractor are as stated in the Solicitation.
c. Clarify background check procedures.
d. Clarify process for questions during the solicitation phase.
See ATTACHED excerpted pages from SECTION 01 35 92 - HISTORIC PRESERVATION
TREATMENT PROCEDURES.
TUIN 231534 Preserve Carver Museum Question and Answer Version 1 Amendment 0003
To properly digest the details of this project and information gained from the Site Visit, we request a minimum 3-week extension to the bid due date.
See Amendment 0002 posted to SAM.gov on 1/23/2023. The Due Date for proposals is extended to 2/17/2023 per Amendment 0002. Amendment 0003 extends the Due Date for proposals to 2/28/2023; see Amendment for details.
Spec section 08-01-20-2 states to submit a Contractor prequalification’s no more than 5 days prior to bid date. Please confirm this requirement. If an affidavit is required, please provide the date of original construction as requested on affidavit.
The following Specification Sections are deleted: 08 01 20 - 2 WOOD, SASH, FRAME AND DOOR RESTORATION, E. SUBMITTALS, "4. Contractor Pre-qualifications: The format for this affidavit is included at the end of this section. Submit completed form at any time during bid period, but no later than five days prior to bid date."; F. QUALITY ASSURANCE "1. Contractor: a.
Maintain throughout duration of the work a crew of restorers who are fully qualified to satisfy requirements of the specifications. b. Maintain throughout the duration of the work a qualified superintendent who has served in this role for the Trade Contractor on the projects submitted in the Contractor Pre-Qualification Affidavit. c. Contractor approved by the Architect, upon review of Contractor Pre-Qualification Affidavit."; 3.12 AFFIDAVIT - Entire subsection 3.12 deleted. See attachment to Amendment 0003.
There is a spec section 09-65-00 for resilient flooring. No resilient flooring requirements are shown on sheet A7.0 and A7.1 Lower/Upper-Level Finishes Plans. Please confirm that there is no resilient flooring work that is to be included in the scope of the work.
Refer to Bid Option 4, sheet A41.1
There is a spec section 09-68-13 for Tile Carpeting. No resilient flooring requirements are shown on sheet A7.0 and A7.1 Lower/Upper-Level Finishes Plans. Please confirm that there is no carpet tile work that is to be included.
Refer to Bid Option 4, sheet A41.1
What jurisdiction will inspect and accept the fire sprinkler/Fire Alarm shop drawings and final testing and approval of the new work?
The Contractor shall coodinate with local fire safety agencies and NPS Authority Having Jurisdiction (AHJ), and NPS Project Manager and COR.
Supplemental information may be available prior to the proposal due date and will be issued as another amendment.
Please confirm that the contractor shall base their sprinkler proposal based on the flow test results conducted on 12-29-20.
Then prior to design the contractor must conduct a hydrant flow test IAW NFPA 13. Any differing results from the Contractor test that might require a different design and construction approach will be handled through a modification.
Proposals should be based on the current available information in the Contract documents. Supplemental information may be available prior to the proposal due date and will be issued as another amendment.
Please confirm that the Contractor is required to have on site a Job Superintendent, On Site Safety Manager and On-Site Quality Control and that none of these key personnel can handle multiple roles.
Solicitation, Page 14: SPECIAL REQUIREMENTS 2: KEY PERSONNEL states:
"The Contractor shall assign to this contract the following Key Personnel*:
Project Manager, Job-site Superintendent, On-Site Quality Control Manager, On-site Safety Manager.
*Each position may (emphasis added) be filled by a separate individual;
however, the On-Site Quality Control Manager and the On-Site Safety Manager may be filled by the same qualified individual. Therefore, at least three (3) individuals are required for Key Personnel. (emphasis added). The Job Site Superintendent, On-Site Quality Control Manager, and the On-Site Safety Manager are required to be on-site during all work activities under the Contract." If contractor chooses to have dual roles, the REQUIRED ON-SITE PERSONNEL for work activities may be filled as follows:
1) Individual #1 -Job Site Superintendent; 2) Individual #2 - On-Site Quality Control Manager/On-Site Safety Manager. See also attachment to Amendment adding additional Key Personnel role.
Please confirm whether the Contractors Environmental Managers role must be a dedicated role with no other duties. Can the superintendent serve as the environmental manager?
See - Specifications SECTION - 1.7 ENVIRONMENTAL COORDINATION "A.
Contractor’s Environmental Manager: Designate on-site party responsible for overseeing Contractor’s conformance to environmental goals for project and implementing procedures for environmental protection. CEM can also serve other Contracting functions." (emphasis added). This last sentence is clarified to mean that the CEM may also serve in other roles for the Contractor, such as projecct management, supervisory,quality control, or contracting functions.
Spec section 01-22-00 covers unit prices. We are unable to find any requirement in the solicitation to provide specific unit prices as identified in this specification. Please clarify what unit prices other than the unit prices required by Section B of the solicitation.
Page 7 of the solicitation contains the bid schedule. The unit prices are not applicable to this particular requirement. Specifications SECTION 01 22 00 - UNIT PRICES is deleted in its entirety. Unit pricing data is not required to be submitted with the Proposal. However, Contractors may request unit pricing from subcontractors which may assist in Contractor's internal data for: 1) price analysis supporting information that may be requested by the Contracting Officer, and 2) establishing benchmark unit prices in the event of any change orders.
Specification 04-01-20 Para 1.5D states- “every mason shall construct a mock-up for each activity that they will perform. Only masons who have demonstrated proficiency in a task per the approval of the Architect shall be permitted to perform that particular task” Does that mean that each and every mason must prepare a mock up for each of the multiple masonry tasks and receive approval from the Architect prior to beginning the work?
What will be the Architect’s review period to review and approve the individual task mock-up for each and every mason. In theory this could exceed 20 mock-ups that would need Architect approval assuming only 5-6 masons being on the project. Please confirm that each mason must prepare an individual mockup for each of the masonry tasks to be performed while restoring the masonry.
The mock-up process in 04 01 20 Masonry Cleaning will be approved through the submittal process. Submittal List in Specifications Section 04 09 20, Pages 55 -56. Specification Section 04 09 20 - Masonry Repair and Re- Pointing, Par 1.5D - This requirement is clarifed to state that the masonry trade or subcontractor will be required to complete the mockups. There will be only one mock-up for each required mock-up submittal.
Please confirm who is responsible for paying for the utilities used on the project.
Please see Solicitation Page 32, FAR 52.236-14 Availability and Use of Utility Services (APR 1984)
Is a Statement of Work (SOW); Statement of Objective (SOO) or Performance Work statement (PWS) available for this solicitation?
If so, where do we find it?
See Solicitataion, Page 8: SECTION C – SPECIFICATIONS / DRAWINGS. After the summary of the project location and description, the Solicitation states:
"Specifications and drawings are attached and incorporated herein by reference. Refer to SECTION J.
Contractor to provide all materials, equipment, supervisions, labor, tools and all construction services necessary to complete the work in accordance with the terms and conditions under this Contract." The Contract documents provide the complete scope of work.
Please clarify the Government’s expectations for anticipated coordination drawings as outlined in specification 01-31-00.
See Specification SECTION 1.4 SUBMITTALS, A. Coordination Drawings.
Please confirm that the overhead and profit rates identified in the specification are the maximum allowable for any contract modifications as outlined in specification 01-26-01.
Overhead and profit rates are required for Modifications, as stated in:
Specification SECTION 01 26 01 - 3, 1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS, E. Overhead - 10% and Profit -7.80% - for contractor self-performed work. For markup for contractor and subcontrators, the aggregate limit is 25%.
Given the new proposal due date of 2/17/2023, we request an additional extension to the RFI deadline to at least 2/3/2023 to allow time to generate questions.
The question deadline has already been adjusted to 1/26/2023. This will allow for thorough answers to the questions. Questions can still be submitted after the deadline, however, those answers may not be posted.
Please provide a comprehensive list of historic items that are to remain inside of the building.
Amendment Non 02 to the Solicitation provided the following list of exhibits documents: 013591_L1_NH GWC List of Objects, and 013591_L2_CR GWC List of Objects.
Can said solicitation be divided into two separate solicitations/contracts/awards: One contract specifically for the removal, transportation and storage of the artifacts contained in the Carver Museum and another contract for the actual restoration and rehabilitation of the Carver Museum Building?
To separate this into two requirements would require coordination efforts between two contractors and increases the risk to the Park Service. To mitigate this risk, the requirement is solicited as one contract thereby allowing the Prime contractor to control the entire project.
Confirm that Specifications Pg. 01 35 91 (appended) - 4, from Section "EVALUATION QUALIFICATIONS - The successful bidder must have the following"(all 5 bullet points) is deleted. Confirm that Specifications Pg. 01 35 91 (appended) - 4, from Section "EVALUATION QUALIFICATIONS - The successful bidder will" (bullet points 3 and 4) are deleted.
Confirmed. See attachment to Amendment 0003, showing deletions to this Section of the Specifications.
What is reference to "designated representative" or "designated NPS representative" in Section 01 35 91?
These terms, or similar, mean the Contracting Officer, unless otherwise specified in writing by the Contracting Officer.
What is reference to Contractor/Vendor in Section 01 35 91?
References to Contractor/Vendor throughout this Section refer to the selected subcontractor for artifacts handling.
Confirm amendment to: Specifications Pg. 01 35 91 (appended) - 8, to clarify administration of access to museum and identification requirements.
Section "SCHEDULE OF SERVICES RESPONSIBILITIES of the SELECTED CONTRACTOR/VENDOR," is amended as follows: Subsection "4.b.
Contractor/Vendor staff: b. All Contractor/Vendor personnel working on-site shall wear photo identification badges and sign-in and out at the beginning and end of each workday with the Museum Specialist or designated personnel (Contractor and CMR at a minimum). Homeland Security provides federal badging, coordinate with CO." No Federal security clearance or badging is required for individuals. The On-Site Job Superintendent and CMR are required to be on-site during all phases of artifacts handling work.
Section "SCHEDULE OF SERVICES RESPONSIBILITIES of the SELECTED CONTRACTOR/VENDOR," Subsection 4.d regarding responsibilities of CO.
Section "SCHEDULE OF SERVICES RESPONSIBILITIES of the SELECTED CONTRACTOR/VENDOR," Subsection 4.d d. "The selected subcontractor for artifacts handling will appoint a supervisor to manage all labor at both origin and destination. All work shall be conducted in accordance with the Contract. The supervisor will work with the NPS CO and Curatorial staff or designated representative during all phases of the move and will support all decisions made by the NPS representative concerning stop-work orders that impact the safety and protection of the staff, the objects or the historic structures. References to Contractor/Vendor throughout this Section refer to the selected subcontractor for artifacts handling.
TUIN 231534 08 01 20 - 2
WOOD SASH, FRAME AND DOOR RESTORATION
EXCERPT FROM: 08 01 20 – 2 -WOOD SASH, FRAME AND DOOR RESTORATION
E. SUBMITTALS
1. Product Data:
a. Glazing.
b. Glazing compounds, and accessories.
c. Restoration products such as consolidants, fillers, etc.
d. Hardware.
e. Proposed Weatherstrip: A mock-up will be done to determine feasibility of installation.
f. Coatings.
g. UV Filter Film
2. Manufacturer's Instructions.
3. Shop Drawings:
a. For wood replacement at restored sash:
b. For each individual profile required (sash bottom rail, muntins, etc.).
c. For each individual joint required.
d. For window sash replication:
e. Provide complete fabrication drawings showing all members, dimensions, profiles, and methods of joinery.
f. Provide window sash unit elevations.
4. Contractor Pre-qualifications: The format for this affidavit is included at the end of this section. Submit completed form at any time during bid period, but no later than five days prior to bid date.
5. Samples:
a. Glazing Replacement glass
b. Provide manufacturer’s full range of restoration glass for selection by Contracting
Officer.
c. Wood replacement: For each individual profile required:
1) Samples shall exhibit at least 12 inches of bare wood milled and sanded and ready for finishing.
2) Hardware.
3) Drawdowns for paint color matching the historic colors.
6. Mock Ups: Schedule mock up review to coincide with regularly scheduled OAC meeting.
a. Record for mock-up shall be submitted, reviewed and approved prior to commencement of mock-up. Record for all other sash to be submitted following approval of mock-up.
7. Documentation: Contractor to submit Sash Repair Record for all windows prior to commencement of work. A template is provided at the end of this section. Sash Repair
Record shall indicate all repairs that the Contractor proposes. The Contracting Officer shall review and approve Sash Repair Record prior to commencement of work.
a. Submit Sash Repair Record along with photo documentation noted below. As work proceeds, if Contractor determines a need for deviation to repairs documented in approved Sash Repair Record, Contractor to notify Contracting Officer accordingly and Contracting Officer to review and approve deviation prior to commencement of work on affected items.
b. Record for mock-up shall be submitted, reviewed and approved prior to commencement of mock-up. Record for all other sash to be submitted following approval of mock-up.
TUIN 231534 08 01 20 - 9
C. Apply paint to dry, clean, properly prepared surfaces at ambient temperatures above 60 degrees
F and below 90 degrees F.
3.6 INSTALLATION AND HARDWARE
A. Clean historic hardware and reinstall in original location at completion of restoration. Reuse existing modern hardware where operable. Furnish new where absent or inoperable.
B. Replace all counterweight cords.
C. Connect sash weights.
D. Completed sash installation shall be fully operational.
3.7 PROTECTION
A. Protect and maintain window units without damage until final acceptance.
3.8 CLEANING
A. Clean and polish glass.
3.9 CLEANING OF INTERIOR SASH
A. Clean the interior sash. Use the cleaning solution in this specification. Keep the windows as dry as possible throughout the cleaning and use clean rags to take of the dirt.
3.10 PRIMING OF INTERIOR SASH
A. After the interior side of the sash has been cleaned, primecleaned, prime the new wood dutchman repairs, wood component replacements, areas on the interior face of the sash where bare wood has been worn away by parting stop and jamb tracks as demonstrated by John
Kraus on site on August 19, 2009. Keep the primer application as thin as possible. Avoid painting over the existing paint as much as possible.
3.11 PAINTING OF JAMB TRACKS
A. Fill any nail holes in jamb tracks prior to priming.
B. Apply primer and paint to the same boundaries as exhibited in the mock up.
3.12 AFFIDAVIT
A. Contractor to complete the following affidavit:
1. Supplementing the requirements of the General Conditions, this is to certify that
, Wood Sash Restoration
Contractor of the undersigned, has demonstrated proficiency in the restoration of historic properties by the successful performance of work of the nature specified on at least three historic properties in the last ten years, the foregoing installations having been the complete and undivided responsibility of the bidder and having been assigned to the superintendent proposed for this project.
2. List at least three properties, completely providing all information indicated below. Use attachment sheets if necessary.
3. Name of property:
4. Date originally constructed:
a. Address:
b. Name of Owner:
TUIN 231534 08 01 20 - 10
c. Telephone number:
d. Name of superintendent:
e. Date of work performed:
f. Name of Architect:
g. Telephone number:
h. Name of Contractor:
i. Telephone number:
j. Description of work performed:
k. Name of property:
l. Date originally constructed:
m. Address:
n. Name of Owner:
o. Telephone number:
p. Name of superintendent:
q. Date of work performed:
r. Name of Architect:
s. Telephone number:
t. Name of Contractor:
u. Telephone number:
TUIN 231534 08 01 20 - 11
v. Description of work performed:
w. Name of property:
x. Date originally constructed:
y. Address:
z. Name of Owner:
aa. Telephone number:
ab. Name of superintendent:
ac. Date of work performed:
ad. Name of Architect:
ae. Telephone number:
af. Name of Contractor:
ag. Telephone number:
ah. Description of work performed:
Excerpt From:
SECTION 01 35 91 - HISTORIC PRESERVATION TREATMENT PROCEDURES
C. Photographs or Videotape: In accordance with Section 01 32 33 "Photographic Documentation," show existing conditions of adjoining construction and site improvements including finish surfaces that might be misconstrued as damage caused by historic treatment operations. Submit before work begins.
D. Packing, Transport, Storage, and Re-installation of Museum Collections Plan
1. After contract award and before Pre-Construction conference, submit for approval a written
Packing, Transport, Storage, and Re-installation of Museum Collections plan.
2. If the plan requires revisions or corrections, Contractor shall resubmit plan within 10 days.
3. No Change in approved plan may be made without written concurrence by Contracting
Officer.
4. Artifacts Subcontractor, no substitutions will be accepted.
a. CV Fine Art Services
4194 Northeast Expressway
Atlanta, GA 30340
1.4 QUALITY ASSURANCE
A. Historic Preservation Treatment Specialist Qualifications: Experienced firm with required certifications and training able to demonstrate through past performance they are qualified to perform this work.
1.5 STORAGE AND PROTECTION OF HISTORIC MATERIALS NOT REMOVED AS PART
OF THE PACKING, TRANSPORT, STORAGE, AND RE-INSTALLATION OF MUSEUM
COLLECTIONS
A. Removed and Salvaged Historic Materials:
1. Clean salvaged historic items.
2. Pack or crate items after dust removal. Identify contents of containers.
3. Store items in secure area until delivery to Contracting Officer.
4. Transport items to storage area in Curatorial Storage Building. Coordinate with Park.
5. Protect items from damage during transport and storage.
6. Do not dispose of items removed from existing construction without prior written consent of Contracting Officer.
B. Removed and Reinstalled Historic Materials:
1. Historic items to be returned to reinstallation site in same condition as when removed.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use as designed.
C. Existing Historic Materials to Remain: Protect construction indicated to remain against damage and soiling during historic treatment. When permitted by Contracting Officer, items may be removed to suitable, protected storage location during historic treatment and reinstalled in their original locations after historic treatment operations are complete.
TUIN 231534 01 35 91 - 3
012721 HISTORIC PRESERVATION TREATMENT PROCEDURES
TUIN 231534
012721
01 35 91 (appended) - 4
HISTORIC PRESERVATION TREATMENT PROCEDURES
See attached COLLECTIONS LIST (013591_L1_NH GWC List of Objects and 013591_L2_CR
GWC List of Objects) and Project CD demo sheets for specific information on areas of work and the artifacts applicable to this scope of work.
EVALUATION QUALIFICATIONS
The successful bidder must have the followingQualifications of Artifacts Handler: :
• All vendor staff involved in the move, including sub-contractors must have documented experience moving major museum collections including fine art and furniture. Vendor’s on-site supervisor shall have 3-5 years of experience in moving museum collections and all other team member must at least one year of experience doing comparable work.
• All vendor staff involved in the move, including sub-contractors must have hands-on experience in all phases of loading and transporting museum collections including objects handling, packing objects or pallets onto a truck, transporting and unloading at a storage facility.
• Ability to crate large, framed artwork, fragile and oversized objects natural history wet specimens
• Completed similar projects for the National Park Service and /or other public or private museums.
• Provide a current list of three (3) project reference for similar projects (involving packing, loading, transporting, and unloading museum collections) completed within the past five (5) years. The list must include institution, contact name, phone number, and email address.
The successful bidder will:
• Be supervised by a NPS designee in all situations, and the NPS designee will direct
Contractor/Vendor staff to stop work when the NPS designee feels any situation may impair or threaten to impair the safety and integrity of any object or the historic structure.
• The majority of artifacts are located in the main floor of the museum. Work is completed one-floor at a time to maximize NPS ability to provide this oversight.
TUIN 231534
012721
01 35 91 (appended) - 5
HISTORIC PRESERVATION TREATMENT PROCEDURES
• Notify the Tuskegee Institute National Historic Site CO of any change of staff during the project and provide all the required background checks and proof of staff experience handling history objects for the new personnel.
• Background checks shall be completed for all the mover’s staff involved in this project at
Tuskegee Institute NHS, on-site at the museum quality storage facility, or during the transport of the collection material. An independent company shall be provided by the Contractor/
Vendor for processing the security and background checks for all employees. Please notify the
CO upon the completion of the background checks and clearing of all personnel through the submittal process, and ensure that personally identifiable information (PII) is not included in any transmission of information. Provide the CO with copies of the background checks before work may begin. Personnel who have not successfully passed background checks shall not be provided access. Vendor will be responsible for the cost of the background checks.
PURPOSE
The purpose of this Scope of Work is to solicit bids for packing, transport, storage, and re-installation of historic artifacts from the George Washington Carver Museum. As a part of the project, the artifacts will be packed and transported to the contractor’s climate-controlled facility.
These objects are to be placed in a secured, monitored, museum quality storage facility with temperature and humidity control. After the renovations to the Museum are completed, the objects will be transported back to the Museum, unpacked and re-installed.
This project requires use of a moving staff skilled in the knowledge and use of museum quality packing and crating techniques using a selection of archival quality materials and equipment that are essential to the long-term preservation of these significant historic objects. Museum quality packing and crating techniques are acquired through extensive experience in the specialized handling, protective packing and careful moving of a wide range of irreplaceable museum collections using specialized materials and knowledge.
Questions resulting from the pre-bid walkthrough or pre-bid solicitation phase must be submitted in writing to the CO on or before the due date for questions. Please advise the
CO/Museum Specialist at time of the pre-bid walkthrough of any questions or concerns in order that questions may be answered, and the plan adjusted if necessary.
4. Contractor/Vendor staff:
a. All work must be performed in a safe and professional manner. Work areas must be kept neat and tidy.
b. All Contractor/Vendor personnel working on-site shall wear photo identification badges and sign-in and out at the beginning and end of each workday with the Museum
Specialist or designated personnel. Homeland Security provides federal badging, coordinate with CO.
c. No smoking, food or beverage consumption is allowed inside the Facility the Contractor /
Vendor provided museum quality storage facility.
d. The selected Contractor/Vendor will appoint a supervisor to manage all labor at both origin and destination. The supervisor will work with the NPS CO and Curatorial staff or designated representative during all phases of the move and will support all decisions made by the NPS representative concerning stop-work orders that impact the safety and protection of the staff, the objects or the historic structures.
e.
The Contractor/Vendor will adhere to any health safety requirements, then in effect, related to the Covid 19 virus or variants. The information provided below is not intended as a complete analysis of requirements for the Contractor and is provided as courtesy.
1. Coronavirus.gov
2. Occupational Safety and Health Administration (United States Department of Labor) -
COVID-19
3. Center for Disease Control (CDC)
a. Get the Facts About Coronavirus
b. What Construction Workers Need to Know about COVID-19
4. Federal Emergency Management Agency (FEMA) - Coronavirus (COVID-19) Response
5. National Park Service (NPS) - NPS Public Health Update
5. The selected Contractor/Vendor’s vehicles:
a. The selected Contractor / Vendor will provide trucks with air-ride suspension, rear lift gate, dual drivers, and constant communication ability with their main office through
TUIN 231534 01 35 91 (appended) - 9
012721 HISTORIC PRESERVATION TREATMENT PROCEDURES
Excerpt From:
| Amendment 0003 |
| Binder7 |
| 140P2023R0029 - PRISM document |
| Amendment 0003 |
| RFIs 0003 |
| Artifacts Specs Excerpt for Amend 0003 |