This is a civil site plan document for the Susanville/Doyle Fire Station construction project located at the south-east corner of US-395 and Doyle Grade Road in Doyle, California 96109. The project is a Bureau of Land Management (BLM) initiative (Project #208-21-003-TO08-$NV-PMNV) issued on November 11, 2022, at the 100% design phase with a scale of 1"=30'.

The construction scope includes building a new fire facility with associated site improvements. Key construction deliverables include: a new reinforced concrete pad (20' x 94') at the entrance with bay doors; a new 7-foot perimeter fence with barbed wire and extension arms; 6-foot interior chain-link fencing with privacy slats; a lockable pedestrian gate and powered sliding gate with electronic card reader; new utilities including a 2" Schedule 80 PVC water line, new electrical and communications connections with transformer, and a 4" sanitary sewer line connecting to a 2,000-gallon septic tank; new leach field; ABA-compliant parking bay and standard gravel parking with bumper blocks; electric vehicle charging station; HVAC units; and a trash enclosure. Additional site work includes constructing a retaining wall, concrete sidewalks, a hazardous material container pad (21'-6" x 8'-6"), landscape diversion area, and relocation of the existing flag pole with solar-powered downlights. The contractor is responsible for obtaining all permits, verifying existing utility locations and elevations, and ensuring compliance with the Storm Water Pollution Prevention Plan (SWPPP).

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(WTR)

(WTR)

(WTR)

(WTR)

(WTR)

(E

LE

C)

(E

LE

C)

(E

LE

C)

(ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC) (ELEC)

(E

LE

C)

(E

LE

C)

(ELEC)

(ELEC)

(ELEC)

(ELEC)

(ELEC)

(ELEC)

(ELEC)

(E

LE

C)

S

S

CO

CO

IRR

(S S)

(S S)

WV

ELEC

ELEC

ELEC

WV

(ELEC)

(ELEC)

HAZ T

GAS GAS GAS GAS

G A

S

GAS

W

TR

WTR WTR

W

TR

WTR

GEN

EV

CO

W V

J

E

E

E

EV

SSSS

CO

W V

CO

CO

J

EV

ELEC ELEC ELECCOM COM COM

ELEC ELECELEC ELEC ELEC

ELEC ELEC

EL

ECEL

EC

ELEC

EL

EC

EL

EC

EL

EC

WVCV

C V

EX ENGINE BAY

DOYLE GRADE RD

N

EW

F

IR

E

FA

C

IL

IT

Y

4T H

S

TR

EE

T

LASSEN CO

UNTY 361

EX CREW

QUARTERS

EX WELL PUMP STATION

(PROTECT IN PLACE)

EX WATER TANKS

(PROTECT IN PLACE)

EX SEPTIC

EX PEDESTRIAN GATE

(PROTECT IN PLACE)

EN

G

IN

E

BA

Y

D O

O R

S

EX FENCE

(PROTECT IN PLACE)

R35'

R35

R20'

EX LEACH FIELD

EX FENCE

(PROTECT IN PLACE) EX FENCE

(PROTECT IN PLACE)

EX FENCE

(PROTECT IN PLACE)EX GATE

(PROTECT IN PLACE)

15'

32'

24'

20'

25'

53' 5'

SW

35'

29'

ELECTRICAL EQUIPMENT

AND GENERATOR (FUTURE)

SEE ELECTRICAL SHEETS

ELECTRICAL POINT OF

CONNECTION, SEE

ELECTRICAL SHEETS

NEW LOWBOY HEAVY

TRAILER PARKING AREA

20'

NEW HOSE TABLE

(BY BLM)

POTENTIAL FUTURE WELL

LOCATION (NOT IN CONTRACT)

EX WELL

(PROTECT IN PLACE)

EX FLAG POLE TO BE

RELOCATED TO NEW

FIRE FACILITY

5'

EX MEMORIAL GARDEN

EX SHED

38'

R37'

111'

20'

OVERHEAD

T

GAS

WTR

ELEC

(SS)

(ELEC)

(WTR)

EV

T

BL

M

Pr oj ec t #

Ch ec ke d

By

Re vis io n

Iss ue

Re v.

De sc rip tio n

Da te

Pr oj ec t S ta tu s Iss ue D at e

D

EP

A

RT

M

EN

T O

F

TH

E

IN

TE

RI

O R

BU

RE

A U

O F

LA

N

D M

A N

A G

EM

EN

T

NOT FOR

CONSTRUCTION

Dr aw n By

SU

SA

N

VI

LL

E/

DO

YL

E

FI

RE

S

TA

TIO

N

SO

UT

H-

EA

ST

C

O

RN

ER

O

F

US

-3

A N

D D

O

YL

E G

RA

D

E

RO

A D

D O

YL

E, C A

N ov em be r, 8-

-0

-T

O0 8-

$N V-

PM

NV

0%

D

ES

IG

N

1"=30'

CONSTRUCTION NOTES

CONSTRUCT NEW FIRE FACILITY. SEE ARCHITECTURAL

SHEETS FOR DETAILS.

CONSTRUCT NEW REINFORCED CONCRETE PAD 20' X 94' AT

ENTRANCE OF NEW BAY DOOR PER DETAIL 1, SHEET C-200.

SEE LANDSCAPE PLANS FOR JOINT PATTERN.

INSTALL NEW BOLLARD PER DETAIL 4, SHEET C-200.

INSTALL NEW 7 FOOT TALL FENCE PER DETAIL 1, SHEET

C-202. ADD EXTENSION ARM AND BARBWIRE PER DETAIL 3,

SHEET C-202, ON ALL PERIMETER FENCING AND ALONG

PORTIONS OF RETAINING WALL THAT ARE ADJACENT TO THE

PERIMETER OF THE PARCEL. ALL INTERIOR FENCING SHALL

BE 6 FOOT TALL CHAIN LINK WITH PRIVACY SLATS PER

DETAIL 5, SHEET C-202 INSTALLED.

CONSTRUCT 5' WIDE CONCRETE SIDEWALK PER DETAIL 3,

SHEET C-200.

INSTALL NEW LOCKABLE PEDESTRIAN GATE PER DETAIL 4,

SHEET C-202.

INSTALL NEW 2" SCHEDULE 80 PVC WATER LINE PER DETAIL

1, SHEET C-201.

NEW ELECTRICAL AND COMMUNICATIONS CONNECTION, SEE

ELECTRICAL SHEETS FOR DETAILS.

INSTALL NEW TRANSFORMER, SEE ELECTRICAL SHEETS FOR

DETAILS.

NEW 4" SANITARY SEWER LINE PER DETAIL 1, SHEET C-201.

CONNECT NEW SANITARY SEWER PIPE TO 2,000 GAL SEPTIC

TANK PER DETAIL 4, SHEET C-201.

CONSTRUCT NEW 20'X10' GRAVEL PARKING BAY WITH

BUMPER BLOCK, PER DETAIL 6, C-200. (TYP)

CONSTRUCT NEW ABA PARKING BAY PER DETAIL 8, SHEET

C-200. SEE DETAIL 3 ON L-101 FOR SURFACE.

INSTALL NEW ELECTRIC VEHICLE CHARGING STATION

BETWEEN PARKING BAYS. SEE ELECTRICAL SHEETS FOR

DETAILS.

CONSTRUCT NEW TRASH ENCLOSURE. SEE LANDSCAPE

SHEETS FOR DETAILS.

INSTALL NEW LOCKABLE MANUAL SLIDING GATE PER DETAIL

6, SHEET C-202.

INSTALL NEW POWERED SLIDING GATE WITH INDICATOR

LIGHT PER DETAIL 2, SHEET C-202.

INSTALL NEW ELECTRONIC GATE CARD READER. SEE

ELECTRICAL SHEETS FOR DETAILS.

RELOCATE FLAG POLE AND INSTALL SOLAR-POWERED DOWN

LIGHTS FOR NIGHT TIME USE.

INSTALL NEW HVAC UNITS. SEE MECHANICAL SHEETS FOR

DETAILS.

RELOCATE PROPANE TANK. GAS CONNECTION DONE BY

OTHERS. (COORDINATE WITH OWNER)

INSTALL NEW GRAVEL DRIVING SURFACE PER DETAIL 7,

SHEET C-200.

REMOVE EXISTING FILL STAND. CAP AND ABANDON EXISTING

WATER LINE UNDERGROUND.

CONSTRUCT RETAINING WALL PER DETAIL 9, SHEET C-200.

INSTALL NEW SANITARY SEWER CLEANOUT PER DETAIL 3,

SHEET C-201.

INSTALL NEW WATER VALVE PER DETAIL 2, SHEET C-201.

CONSTRUCT 21'-6" X 8'-6" CONCRETE PAD TO SUPPORT

HAZARDOUS MATERIAL CONTAINER PER STRUCTURAL

SHEETS. RELOCATE EXISTING HAZARDOUS MATERIAL

CONTAINER TO THIS LOCATION.

CONSTRUCT LANDSCAPE DIVERSION AREA. SEE LANDSCAPE

PLANS FOR DETAILS.

CONSTRUCT NEW LEACH FIELD PER DETAIL 5, SHEET C-201.

FOR FILL STAND, PUMP, WATER TANKS, AND PUMP HOUSE

IMPROVEMENTS SEE SHEET C-104. (ADD ALT 2)

AREA OF DISTURBANCE SHALL CONFORM TO THE SWPPP

PROVIDED BY GOVERNMENT.

CONSTRUCT 3' X 5' DOOR LANDING 6" ABOVE FINISHED

GRADE AND 1/2" BELOW FINISHED FLOOR OF THE BUILDING.

INSTALL ELECTRIC GATE OPENER WITH REMOTE CONTROL

ACCESS PER MANUFACTURER'S SPECIFICATIONS.

INSTALL 42" CHAIN LINK FENCE TO ACT AS A GUARDRAIL

ALONG PORTIONS OF RETAINING WALL THAT ARE WITHIN THE

PERIMETER OF THE PARCEL PER DETAIL 2 SHEET C-203.

GENERAL NOTES:

1. ENGINEER ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY

LOCATIONS AND ELEVATIONS. EXISTING UTILITIES SHOWN ARE

FROM THE BEST AVAILABLE INFORMATION. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY LOCATIONS

AND ELEVATIONS OF ALL UTILITIES, INCLUDING BUT NOT LIMITED

TO, THE WATER, FIRE, SANITARY SEWER, STORM SEWER,

COMMUNICATIONS, POWER, GAS, AND IRRIGATION PRIOR TO

THE COMMENCEMENT OF CONSTRUCTION. IF CONFLICTS ARE

ENCOUNTERED IN THE FIELD, THE CONTRACTOR IS TO NOTIFY

THE COR, AND THE PROJECT ENGINEER IMMEDIATELY.

2. CONTRACTOR WILL APPLY, OBTAIN, AND PROVIDE PAYMENT

FOR ALL REQUIRED PERMITS.

3. THIS PROJECT MUST FOLLOW STORM WATER POLLUTION

PREVENTION PLAN (SWPPP) PREPARED BY S&B CHRIST

CONSULTING, LLC.

4.

5. ALL PRESSURIZED PIPE TO BE THRUST BLOCKED OR SOLVENT

WELD PER DETAIL 2, SHEET. C-200

C-101

CIVIL

SITE PLAN

PROJECT BENCHMARK:

THE PROJECT BENCHMARK IS A FOUND 3-INCH BLM BRASS

CAP AT THE SOUTHWEST CORNER OF SAID LOT 1, MARKED

"AP4", DERIVED FROM GPS OBSERVATIONS AND DEPICTED IN

U.S. SURVEY FEET, NAVD 88 DATUM.

ELEVATION= 4297.40 SFT

PROJECT BASIS OF BEARINGS:

THE BASIS OF BEARING IS THE SOUTH LINE OF LOT 1, SECTION

17, TOWNSHIP 25 NORTH, RANGE 17 EAST, MT. DIABLO

MERIDIAN, BEING NORTH 88° 50' 18" EAST, 646.27 FEET BETWEEN

A FOUND 3-INCH BLM BRASS CAP AT THE SOUTHWEST CORNER

OF SAID LOT 1, MARKED "AP4", AND A FOUND BLM BRASS CAP

AT THE SOUTHEAST CORNER OF SAID LOT 1, MARKED "AP5".

THESE POSITIONS WERE DERIVED FROM GPS OBSERVATIONS

AND DEPICTED IN U.S. SURVEY FEET, NAD83(2011)EPOCH

2010.0000, BASED ON THE CALIFORNIA STATE PLANE

COORDINATE SYSTEM, ZONE 1, AS MEASURED AT GRID.

TRUE

NORTH

M.

RO

CH

A

J.C

HR

IS

T

SHEET

ONLY THE EXISTING FENCE LINES

AND EAST PERIMETER GATE

CLOUDED BELOW SHALL BE

REMOVED AND REPLACED.

REMOVE & REPLACE EXISTING FENCING, TYP.

EXISTING GATES ALONG THE SOUTH

PERIMETER TO BE REMOVED AND REPLACED

WITH FENCING. REPLACEMENT FENCING

SHALL BE PROVIDED PER SHEET C-202 ON THE

LATEST CONSTRUCTION DRAWINGS AND

MATCH THE NEWER EXISTING PERIMETER

FENCING THAT IS TO REMAIN IN PLACE.

EXISTING GATE AT EAST PERIMETER TO BE

REPLACED WITH NEW 24 FT. LONG MANUAL

ROLLING VEHICULAR GATE PER DETAIL

6/C-202 IN PROVIDED 2022 CONSTRUCTION

DRAWINGS. GATE SHALL FEATURE

3-STRAND BARBED WIRE AT THE TOP

SIMILAR TO THE OTHER GATE AT THE

NORTH PERIMETER.

TRIM OR REMOVE TREES AS

NEEDED TO PREVENT

INTERFERENCE/DAMAGE TO

NEW FENCING AND TO REMOVE

THE POTENTIAL FOR

TRESPASSERS TO CLIMB THE

TREES AND BYPASS THE FENCE.

NEWER FENCES AND

GATES SHALL BE

PROTECTED AND

REMAIN IN PLACE.

File details come from the government source that posted it. Updated .