B08_Attachment_8_Limitations_on_Subcontracting_Breakout.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- CLDQ QUARRY BUILDING REPLACEMENT Federal contract opportunity
- Solicitation number
- 140L0625R0014
About this file
This document is an Attachment 8 Limitations on Subcontracting Breakout spreadsheet for Solicitation Number 140L0625R0014, a Small Business set-aside contract issued by the Department of the Interior Bureau of Land Management National Office. The spreadsheet details compliance requirements for subcontracting, specifically mandating that the prime contractor must self-perform at least 15% of the total contract labor costs, with additional tracking provisions for small business and large business subcontractor labor expenses.
The solicitation is for the CLDQ Quarry Building Replacement project, with a performance period of 180 days after Notice to Proceed. The spreadsheet includes detailed tracking mechanisms for total proposed amount, material costs, labor costs, and subcontractor payments, designed to ensure compliance with federal subcontracting limitations and promote small business participation in the contract opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_12_Decision_Record_Appendix_B_and_C_from_NEPA_08_2024_0002.pdf | ||
| Sol_140L0625R0014_Amd_0002.pdf | ||
| Sol_140L0625R0014_Amd_0001.pdf | ||
| Attachment_11_Quarry_Bldg_Pre-bid_Attendance_0001.pdf | ||
| Attachment_10_Q_A_1_0001.pdf | ||
| Sol_140L0625R0014.pdf | ||
| B08_Attachment_4_Geotech_Report.pdf | ||
| B08_Attachment_5_Wage_Determination_UT20250080.pdf | ||
| B08_Attachment_6_Price_Schedule.pdf | ||
| B08_Attachment_7_SF1442_Completion_Instructions.pdf | ||
| B08_Attachment_2_Specifications.pdf | ||
| B08_Attachment_9_Past_Perf_Questionnaire.docx | DOCX document | |
| B08_Attachment_1a_Drawings.pdf | ||
| B08_Attachment_1b_Drawings_Revised_C102.pdf | ||
| B08_Attachment_3_Statement_of_Work.pdf | ||
| B08_Attachment_1c_Drawings_Revised_C103.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0625R0014 |
| Type of Set-Aside | Small Business |
| Performance Period | 180 Days after Notice to Proceed |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost2
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor3 | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost4 $0.00
| (G) Limitation on Subcontracting Percentage5 | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost |
| *Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1. |
| *Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 4: Total labor costs consist of all contractual costs other than material. |
| *Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .