About this file
This document is a Price Schedule for the Bureau of Land Management's CLDQ Quarry Building project, dated 1/22/2025. The schedule outlines five line items for construction work, each with an estimated quantity of 1 and measured in Lump Sum (LS): 1) Mobilization and Construction Management, 2) Site Excavation and Structural Fill, 3) Site Work, 4) Building Enclosure, and 5) Exterior Site Work. The current total cost is listed as $0.00, indicating this is likely a template or preliminary pricing document awaiting contractor input for specific unit costs. The document includes the Bureau of Land Management logo and appears to be a standard pricing schedule template for a construction project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_12_Decision_Record_Appendix_B_and_C_from_NEPA_08_2024_0002.pdf | ||
| Sol_140L0625R0014_Amd_0002.pdf | ||
| Attachment_11_Quarry_Bldg_Pre-bid_Attendance_0001.pdf | ||
| Sol_140L0625R0014_Amd_0001.pdf | ||
| Attachment_10_Q_A_1_0001.pdf | ||
| Sol_140L0625R0014.pdf | ||
| B08_Attachment_9_Past_Perf_Questionnaire.docx | DOCX document | |
| B08_Attachment_1a_Drawings.pdf | ||
| B08_Attachment_1b_Drawings_Revised_C102.pdf | ||
| B08_Attachment_3_Statement_of_Work.pdf | ||
| B08_Attachment_4_Geotech_Report.pdf | ||
| B08_Attachment_5_Wage_Determination_UT20250080.pdf | ||
| B08_Attachment_7_SF1442_Completion_Instructions.pdf | ||
| B08_Attachment_8_Limitations_on_Subcontracting_Breakout.xlsx | XLSX spreadsheet | |
| B08_Attachment_2_Specifications.pdf | ||
| B08_Attachment_1c_Drawings_Revised_C103.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No, Description
Estimated Quantity Unit Unit Cost Total
1 Mobilization and Construction Management 1 LS
2 Site Excavation and Structural Fill 1 LS
3 Site Work 1 LS
4 Building Enclosure 1 LS
5 Exterior Site Work 1 LS
Total $0.00
Bureau of Land Management
CLDQ Quarry Building
PRICE SCHEDULE
1/22/2025