This document is the Site Plans for the Rehabilitation of the Lincoln Memorial Bridge - Design Build Program of Requirements at the George Roger Clark National Historical Park.

The key details are:

This is a solicitation (Solicitation Number: 140P2024R0125) issued by the Department of the Interior National Park Service National Office for a Design Build program to rehabilitate the Lincoln Memorial Bridge at the George Roger Clark National Historical Park. The solicitation includes site plans and a Program of Requirements detailing the scope of work. No specific award date or pricing terms are provided. This appears to be a standalone set of site plans and program requirements, not a full solicitation document.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

100% FINAL POR PLANS - NOT FOR CONSTRUCTION

STATE

NATIONAL PARK SERVICE

DENVER SERVICE CENTER REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF DRAWING

COVER SHEET

LINCOLN MEMORIAL BRIDGE STABILIZATION

GERO 1

7KNOX INDIANA OF

PKG.

NO. SHEET

DRAWING NO.

GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

MIDWEST

100% FINAL POR DRAWINGS

GERO - 289951

TASK ORDER NO. 140P2023F0346

PRIME/ LA:

A/E FIRM - CONTRACT NO. 140P2021D0012

DHM DESIGN

DENVER, CO

STRUCTURAL:

SILMAN

LOS ANGELES, CA

CONSERVATION:

JBC

NEW YORK, NY

CIVIL:

CALIBRE

HIGHLANDS RANCH,

ESTIMATOR:

MBP ESTIMATING

COLUMBIA, MD

CO

SCALE OF MILES

0 .1

VINCENNES, INDIANA

.2

AREA OF WORK

REHABILITATE THE LINCOLN MEMORIAL BRIDGE

VIGO STREET

WABASH RIVER

EXISTING TREE, TYP.

EXPOSED AGGREGATE

CONCRETE WALKWAY

EXISTING TREE, TYP.

STEEL LANDSCAPE EDGER

GRANITE STEPS IN

EXPOSED AGGREGATE

CONCRETE WALKWAY

FLAGPOLE (EAST)

PLAZA

RAISED GRANITE

PLANTER

PLANTING BEDGRANITE WALL

BRIDGE SPAN (ABOVE)

GRAVEL PATH

PLANTING BED

WEST PLAZA

GRANITE STEPS

RAISED GRANITE

PLANTER

PLANTING BEDPLANTING BED

RAISED GRANITE

PLANTER

EXISTING TREE, TYP. GE

O

RG

E

RO

GE

RS

M

EM

O

RI

AL

EXPOSED AGGREGATE

CONCRETE SIDEWALK

WITH BROOM FINISH

CONCRETE BORDER

PAVEMENT STRIPING

STORM SEWER

ASPHALT

SANITARY SEWER MANHOLE

WATER VALVE

TREE

STORM SEWER MANHOLE

PLANTING BED

GRANITE

MANHOLE

STORM SEWER CURB INLET

AREA LIGHT ON CONCRETE BASE

SANITARY SEWER

TELEPHONE MANHOLE

FLAG POLE

ELECTRICAL BOX

LAWN

GRAVEL

GROUND LIGHT

12" DIAMETER AREA DRAIN

EXPOSED AGGREGATE

CONCRETE

BROOM FINISH

CONCRETE

LEGEND

INDEX CONTOUR

INT. CONTOUR

01.18.2024

GERO

7GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

REHABILITATE THE LINCOLN MEMORIAL BRIDGE

FINAL

POR PLANS

NOT FOR

CONSTRUCTION 289

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUB CONSULTANT:

EXISTING CONDITIONS

PLAN

BG

JS

EK

L1

P:

\D

EN

VE

R \N

PS

G

ER

O

-2

1\

6_

PO

R _F

IN

AL

\0 2_

PO

R

_P

LA

N S\

C

AD

\L A\

L1 _G

ER

O

_E X_

C O

N D

.D W

G

/1 4/

0:

A

M

BG

O

TT

H

EL

F

1. PLAN REFLECTS EXISTING

CONDITIONS PRIOR TO REMOVAL

OF STONE FROM BRIDGE

APPROACH

NOTES

WABASH RIVER

GE

O

RG

E

RO

GE

RS

M

EM

O

RI

AL

5.4%

5.5%

6.0%

5.7% 5.5%

5.0%

5.7% 4.6%

4.5%

7.3%

7.6%

4.6%

4.9%

5.0%

5.9% 6.5%

6.0% 6.4%

PAVEMENT STRIPING

STORM SEWER

ASPHALT

SANITARY SEWER MANHOLE

WATER VALVE

TREE

STORM SEWER MANHOLE

PLANTING BED

GRANITE

MANHOLE

STORM SEWER CURB INLET

AREA LIGHT ON CONCRETE BASE

SANITARY SEWER

TELEPHONE MANHOLE

FLAG POLE

ELECTRICAL BOX

LAWN

GRAVEL

GROUND LIGHT

12" DIAMETER AREA DRAIN

EXPOSED AGGREGATE

CONCRETE

BROOM FINISH

CONCRETE

LEGEND

INDEX CONTOUR

INT. CONTOUR

01.18.2024

GERO

7GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

REHABILITATE THE LINCOLN MEMORIAL BRIDGE

FINAL

POR PLANS

NOT FOR

CONSTRUCTION 289

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUB CONSULTANT:

TOPOGRAPHIC AND SLOPE

ANALYSIS PLAN

BG

JS

EK

L2

P:

\D

EN

VE

R \N

PS

G

ER

O

-2

1\

6_

PO

R _F

IN

AL

\0 2_

PO

R

_P

LA

N S\

C

AD

\L A\

L2 _G

ER

O

_T O

PO

.D

W G

/1

4/

0:

A M

BG

O

TT

H

EL

F

1. PLAN REFLECTS EXISTING

CONDITIONS PRIOR TO REMOVAL

OF STONE FROM BRIDGE

W

AB

AS

H

R

IV

ER

PROTECT EXISTING

TREE, TYP.

PROTECT EXISTING

TREE, TYP.

PROTECT EXISTING

TREE, TYP.

PROTECT EXISTING

TREE, TYP.

PROVIDE LAWN

RESTORATION TO

LIMITS OF

CONSTRUCTION

DISTURBANCE, TYP.

CONSTRUCTION

ACCESS ROUTE

(LOWER)

CONSTRUCTION

ACCESS ROUTE

(UPPER)

PROVIDE PROTECTION MATS

FOR CONSTRUCTION ACCESS

AND STAGING AREAS

PROVIDE CURB PROTECTION FOR

CONSTRUCTION ENTRANCE

SOUTH 1ST STREET

WATER VALVE

TREE

FLAG POLE

LEGEND

GRANITE RESTORATION

PLANTING REPLACEMENT

CONCRETE PAVEMENT

REPLACEMENT

PROJECT BOUNDARY

CONSTRUCTION ACCESS

ROUTE

01.18.2024

GERO

7GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

REHABILITATE THE LINCOLN MEMORIAL BRIDGE

FINAL

POR PLANS

NOT FOR

CONSTRUCTION 289

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUB CONSULTANT:

SITE CONSTRUCTION

ACCESS PLAN

BG

JS

EK

L3

P:

\D

EN

VE

R \N

PS

G

ER

O

-2

1\

6_

PO

R _F

IN

AL

\0 2_

PO

R

_P

LA

N S\

C

AD

\L A\

L3 _G

ER

O

_C O

N

ST

_A C

C

ES

S.

D

W G

/1

4/

0:

A M

BG

O

TT

H

EL

F

1. PLAN REFLECTS EXISTING

CONDITIONS PRIOR TO REMOVAL

OF STONE FROM BRIDGE

STONE STORAGE AREA:

APPROX. 1.2 ACRES

BRIDGE APPROACH

GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

VI

GO

S

TR

EE

T

W

IL

LO

W

S

TR

EE

T

SOUTH 2ND STREET

RIVER ROAD

PEARL DRIVE

SOUTH 3RD STREET

SOUTH 4TH STREET

WABASH RIVER

LI

N

CO

LN

M

EM

O

RI

AL

B

RI

D

GE

CH

U

RC

H

S

TR

EE

T

BA

YO

U S

TR

EE

T

N

IC

H O

LA

S

ST

RE

ET

D U

BO

IS

S

TR

EE

T

BA

RN

ET

T

ST

RE

ET

01.18.2024

GERO

7GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

REHABILITATE THE LINCOLN MEMORIAL BRIDGE

FINAL

POR PLANS

NOT FOR

CONSTRUCTION 289

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUB CONSULTANT:

TEMPORARY STONE

STORAGE LOCATION

BG

JS

EK

L4

P:

\D

EN

VE

R \N

PS

G

ER

O

-2

1\

6_

PO

R _F

IN

AL

\0 2_

PO

R

_P

LA

N S\

C

AD

\L A\

L4 _G

ER

O

_S

TO

N E_

ST

O

R

AG

E.

D

W G

/1

4/

0:

A M

BG

O

TT

H

EL

F

1. CONTRACTOR TO RESTORE STONE STORAGE AREA AFTER BRIDGE

REHABILITATION.

2. STONE STORAGE AREA SITE RESTORATION SHALL INCLUDE FINE

GRADING, SOIL PREPARATION, RESEEDING WITH THIN BLADE TURF

TYPE TALL FESCUE, AND TEMPORARY IRRIGATION FOR 30 DAYS

USING ON-SITE WATER.

01.18.2024

GERO

7GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

REHABILITATE THE LINCOLN MEMORIAL BRIDGE

FINAL

POR PLANS

NOT FOR

CONSTRUCTION 289

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUB CONSULTANT:

BASIS OF PLANTING

PLAN

BG

JS

EK

L5

P:

\D

EN

VE

R \N

PS

G

ER

O

-2

1\

6_

PO

R _F

IN

AL

\0 2_

PO

R

_P

LA

N S\

C

AD

\L A\

L5 _G

ER

O

_P

LA

N

TI

N G

.D W

G

/1 4/

0:

A

M

BG

O

TT

H

EL

F

NOTES

1. BASIS OF PLANTING PLAN: 2016 PLANTING PLAN BY JMA,

TO RE-CREATE HISTORIC PLANTING SCHEME UTILIZING

PLANT SELECTIONS CURRENTLY AVAILABLE

COMMERCIALLY

2. PLANT QUANTITIES AND SPACING HAVE BEEN ADJUSTED

TO ACCOMMODATE MATURE GROWTH

W

AB

AS

H

R

IV

ER

PLAZA PLANTERS ARE TO

REMAIN UNIRRIGATED, TYP.

REPAIR ANY AND ALL IRRIGATION

IMPACTS CAUSED BY

CONSTRUCTION ACTIVITIES, TYP.

REPAIR AND/OR REPLACE IRRIGATION

SYSTEM IN PLANTING BEDS IMPACTED

BY BRIDGE CONSTRUCTION, TYP.

SOUTH 1ST STREET

REPAIR AND/OR REPLACE IRRIGATION

SYSTEM IN PLANTING BEDS IMPACTED

BY BRIDGE CONSTRUCTION, TYP.

REPAIR AND/OR REPLACE IRRIGATION

SYSTEM IN PLANTING BEDS IMPACTED

BY BRIDGE CONSTRUCTION, TYP.

REPAIR AND/OR REPLACE IRRIGATION

SYSTEM IN PLANTING BEDS IMPACTED

BY BRIDGE CONSTRUCTION, TYP.

REPAIR ANY AND ALL IRRIGATION

IMPACTS CAUSED BY

CONSTRUCTION ACTIVITIES, TYP.

WATER VALVE

TREE

FLAG POLE

LEGEND

GRANITE RESTORATION

IRRIGATION REPAIR

AND/OR REPLACEMENT

PROJECT BOUNDARY

CONSTRUCTION ACCESS

01.18.2024

GERO

7GEORGE ROGERS CLARK NATIONAL HISTORICAL PARK

REHABILITATE THE LINCOLN MEMORIAL BRIDGE

FINAL

POR PLANS

NOT FOR

CONSTRUCTION 289

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO. DRAWING NO.

OF

TITLE OF SHEETA/E FIRM

PRIME:

DHM DESIGN

DENVER, CO

PKG.

NO. SHEET

SUB CONSULTANT:

IRRIGATION REPAIR

SCOPING PLAN

BG

JS

EK

L6

P:

\D

EN

VE

R \N

PS

G

ER

O

-2

1\

6_

PO

R _F

IN

AL

\0 2_

PO

R

_P

LA

N S\

C

AD

\L A\

L6 _G

ER

O

_I R

R

IG

AT

IO

N .D

W G

/1

4/

0:

A M

BG

O

TT

H

EL

F

1. PLAN REFLECTS EXISTING

CONDITIONS PRIOR TO REMOVAL

OF STONE FROM BRIDGE

APPROACH

2. SEE SHEET L4 FOR AREA OF

TEMPORARY IRRIGATION AT

TEMPORARY STONE STORAGE

LOCATION.

Sheets and Views
1 G0-1-GERO_COVER - COVER
2 L1_GERO_EX_COND - L1
3 L2_GERO_TOPO - L2
4 L3_GERO_CONST_ACCESS - L3
5 L4_GERO_STONE_STORAGE - L4
L5_GERO_PLANTING - L5
L6_GERO_IRRIGATION - L6

File details come from the government source that posted it. Updated .