This document is a Permitting Assessment for the Lincoln Memorial Bridge Stabilization project at George Rogers Clark National Historical Park (GERO), with PMIS# 289951. It outlines the jurisdictional review and permit requirements for the project.

The key details are:

  • The project is primarily on federal NPS land, with the bridge and road under the jurisdiction of the Indiana Department of Transportation (INDOT).
  • Federal permits may be required from agencies such as the U.S. Fish and Wildlife Service, U.S. Army Corps of Engineers, and EPA for activities like wetlands, water quality, and floodplain impacts. State-level permits from the Indiana Department of Environmental Management may also be needed.
  • Local permits from Vincennes, Indiana will be required for roadway/highway work and associated structures.
  • Temporary construction-related permits, such as for stormwater management and traffic control, will also be necessary.
  • The project does not appear to require permits related to drinking water, wastewater, waste management, communication towers, or other operational activities.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Permitting Assessment for:

GERO PMIS# 289951

PMIS #: 289951

PEPC ID#:

REGION:

Questions Examining Jurisdiction - Who needs to be involved?

No

No Questions regarding circumstances that might give an agency jurisdiction at a site.

No No Yes Yes Yes

PROJECT TITLE: Lincoln Memorial Bridge Stabilization

1st PARK CONTACT:

Is there standing water on site?

Midwest Region

PROGRAM:

Are there water channels on site?

Notes on Jurisdictional Assessment: The site falls on mostly federal land, with the exception being the bridge and road, which is INDOT jurisduction.

Is there any know local jurisdiction on the site?

List other existing permits, easements, agreements, etc. that are in the site boundaries site: None others besides the public roadway and levee.

Project Meta Data

Jurisdictional Assessment

DSC PM:

What is the classification of the jurisdiction for the Park at the site? See RM39-1, pg. 9. 1

Has the site's jurisdiction been DOCUMENTED?

Notes:

Concurrent (a blend) Source:

Is the site COMPLETELY on NPS land? Public ROW on top of the bridge

Assessor's Name:

PARK: George Rogers Clark National Historic Park

DSC PS:

Have the site's structures been reviewed? (levees, utilities, etc.)?

Other designations that may carry rights (special waters, critical habitat, easements etc.)?

A topo survey was completed

Public ROW on top of bridge, state DOT managed USACE will be contacted for permit on levee

Site borders the Wabash River

Permitting Lead: Calibre Engineering

A/E: Calibre Engineering A/E CONTACT: Jim Gusky Dates of Assessment - First: 12/14/22 Most recent: 01/10/2024

2nd PARK CONTACT:

NPS units: RD=Regional Director, WRD=Water Resources Division Permitting Assessment FORM, 12-2-16

National Park Service - Denver Service Center 1/17/2024 | page 1 of 16

Permit? Jurisdiction: Agency No Federal: NMFS and/or FWS No State:

No Local: ----

Permit? Jurisdiction: Agency No Federal: USFWS No State:

No Local: ----

Permit? Jurisdiction: Agency No Federal: USFWS No State:

No Local: ----

Permit? Jurisdiction: Agency No Federal: USFWS No State:

No Local: ----

Permit? Jurisdiction: Agency No Federal: USACE, USEPA No State:

No Local: ----

Not part of project Listed Species Incidental Take: Terrestrial (NPS typically avoids incidental take)

---- Local jurisdiction typically does not apply to NPS for this topic

Not part of project Protected/Critical Habitat (NPS typically avoids incidental take) Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: Project will not impact USFWS critical habitats, according to USFWS GIS:

https://www.arcgis.com/home/webmap/viewer.html?featurecollection=https%3A%2F%2Fmaps.fisheries.noaa.gov%2Fserver%2Frest%2Fservices%2FAll_NMFS_Critical_Habitat%2FMapServer%3Ff%3 Djson%26option%3Dfootprints&supportsProjection=true&supportsJSONP=true

Law, regulation, etc. Requirements, Actions, Etc.:

Section 404 D&F

CWA § 40410, EO 119909,

Not part of project Waters of the US and Wetlands (or other Special Aquatic Sites) Permit Type:

Law, regulation, etc.

ESA § 95,7

Requirements, Actions, Etc.:

Local jurisdiction typically does not apply to NPS for this topic

Law, regulation, etc. Requirements, Actions, Etc.:

Permit Type:

ESA § 95,7, MMPA6

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

ESA § 95,7, MBTA8

Permit Type:

---- Local jurisdiction typically does not apply to NPS for this topic Basis of Decision: Project will not impact USFWS accor

ESA § 95,7

---- Local jurisdiction typically does not apply to NPS for this topic

Permit Type:

Listed Species Incidental Take: Fish (NPS typically avoids incidental take)Not part of project

Listed Species Incidental Take: Marine Mammals (NPS typically avoids incidental take)Not part of project

Basis of Decision:

Basis of Decision:

Impacts to Resource Topics - Compliance Related

---- Local jurisdiction typically does not apply to NPS for this topic

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 2 of 16

Permit? Jurisdiction: Agency

No

Federal: FEMA

No State:

No Local:

Permit? Jurisdiction: Agency No Federal: NOAA No State:

No Local:

Permit? Jurisdiction: Agency No Federal: USACE, USCG No State:

No Local:

Permit? Jurisdiction: Agency Requirements, Actions, Etc.:

Part of project Water Quality Certification (required if project has federal permit)

R&HA 1899 §§9-1011

CZMA14,

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Requirements, Actions, Etc.:Law, regulation, etc.

Part of project Floodplain (Construction in)

Permit Type:Law, regulation, etc.

Basis of Decision: Wabashi River is not a navigable water

Basis of Decision: Project not in NOAA coastal lands

Basis of Decision: Fema website: https://www.fema.gov/sites/default/files/2020-07/fema_p213_08232018.pdf (page 11)

Basis of Decision: Project not in a wetland: https://fwsprimary.wim.usgs.gov/wetlands/apps/wetlands-mapper/

Not part of project Coastal Lands - Usually addressed in NEPA on NPS land. If project is NOT on NPS land review this topic.

Not part of project Navigable Waters

NFIP Permit Permit Type:

44 CFR12, EO 1198813, We are in a floodplain, however because we are repairing a historical structure, we should be exempt from the NFIP Permit.

NPS would need to provide documentation proving a historic structure and that the work will not change that status. Could also be exempt by proving the proposed work is less than 50% of the structure value.

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 3 of 16

No Federal: USACE

Yes

State: IDEM

No Local:

Vincennes Storwater Quality Manegement

Permit? Jurisdiction: Agency No Federal: DOI-OSM No State:

No Local: ----

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

CWA § 40410, EO 119909, We will not be releasing any fill materials into the Wabashi riverSection 404 D&F Online application

SWMPP

Permit Type:

SMCRA

Section 401 Water Quality Submit letter that no endangered species are harmed, complete a notification form 30 days before construction, submit online application

Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Local jurisdiction typically does not apply to NPS for this topic

Law, regulation, etc.

Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Not part of project Zoning - Not normally required on NPS land

Not part of project OTHER TOPIC:

Basis of Decision: Project is not changing any zoning, just repairs.

Basis of Decision: Project not located near and is not imapcting any mines https://amlis.osmre.gov/Map.aspx

Basis of Decision: No federal permits at this time, however based on proximity to local waterway, IDEM website, we could need a state level basic approval letter:

https://www.in.gov/idem/wetlands/information-about/section-401-water-quality-certification/terms-and-conditions-of-the-idem-regional-general-permit-notification-form/

Requirements, Actions, Etc.:

Not part of project Mine Land

Only applicable if greater than 1 acre disturbed area. Based on preliminary estimates we should fall well below that

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 4 of 16

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Law, regulation, etc.

Permit Type:

Law, regulation, etc. Requirements, Actions, Etc.:

Topics included in Design - Integrated into Plans Not part of project Septic System

Permit Type:

Requirements, Actions, Etc.:

Basis of Decision: Project not effecting wastewater collection system

Not part of project Wastewater Treatment Plant

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: No Wastewater treatement plant in prject

Not part of project Pretreatment, i.e. Oil/Water Separator

Basis of Decision: Project not impacting septic system

Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: Project not imapcting wastewater lift station

Law, regulation, etc. Requirements, Actions, Etc.:

Permit Type:

Permit Type:

Wastewater Collection System

Not part of project Wastewater Pump/Lift Station

Not part of project

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 5 of 16

Permit? Jurisdiction: Agency

No Federal:

No

State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Requirements, Actions, Etc.:

Basis of Decision: No pretreatment in project

Section 404 & CWA

CSGP

Not part of project Stormwater Management (permanent)

Permit Type:

Not part of project Aggregation Pt. or Transfer Facility Permit Type:

Basis of Decision: Aggregation Pt. or Transfer Facility are not a part of this project

Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: Permanent stormwater management is not being addressed in this project. Temporary management is addressed by UPPP

Permit Type:

Not part of project Landfill (NPS does not usually allow Landfills on NPS land)

Law, regulation, etc.

Law, regulation, etc. Requirements, Actions, Etc.:

RCRA, 36 CFR Part 6 §6.52, NPS Guidance3, NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 6 of 16

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Basis of Decision: No tanks being proposed

Not part of project Hazardous Material/Waste Storage

US Code, Title 42, Chap 82, Sub chap IX

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: No wells being proposed

Not part of project

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: Not impacting drinking water with this renovation

Not part of project Well Construction (includes geothermal)

Not part of project Drinking Water Treatment Plant Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: Not proposing any significant grade changes

Tank Construction (AST or UST) Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Not part of project

Underground Injection

Basis of Decision: No underground injection being proposed

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 7 of 16

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Permit? Jurisdiction: Agency No Federal: FCC4

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

Yes

State: INDOT (Indiana)

Yes

State: IDOT (Illinois)

Yes Local: Multiple

Permit? Jurisdiction: Agency No Federal: USCG No State:

No Local:

Basis of Decision: No navigable waters in project

Not part of project Work in Navigable Waters - Aids to Navigation Law, regulation, etc. Permit Type:

Basis of Decision: No hazardous waste expected for this project

Permit Type:

Permit

Law, regulation, etc. Requirements, Actions, Etc.:

RCRA , OSHA, and NESHAPS

Part of project Roadway/Highway and Associated structures

Police, local jursdiction approval required for INDOT Permit

605 ILCS 5/4 209 Highway permit. Project is located in District 7 in IL Description of proposed work, location map, detailed drawings, traffic studies, traffic control plan and other pertinent information

Basis of Decision: Bridge closure is required for project, https://www.in.gov/indot/doing-business-with-indot/files/INDOT-Permit-Guide.pdf (pg 120)

Requirements, Actions, Etc.:

Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Section 10.4 Road closed permit. Project is in the Vincennes District and Vincennes Sub- District

Basis of Decision: Project not impacting any communication towers

Map of alternate route, signed application from local jurisdiction, bond fee waiver, police agency letter, hold harmless form, traffic control plan

Not part of project Communication Tower Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Permit

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 8 of 16

Permit? Jurisdiction: Agency

Yes Federal: NPS

No State: IDEM

No Local:

Vicennes Stormwater Quality Management

Not part of project OTHER TOPIC: Temporary Stormwater management Law, regulation, etc. Permit Type:

Requirements, Actions, Etc.:

Basis of Decision: Project has under an acre of sisturbed area so UPPP is all that is needed

Construction Contractor will need to complete a UPPP, available on the NPS website

CSGP Construction Stormwater General Permit, online

Submit Construction plan and stormwater prevention plan. Our project is under 1 acre disturbed area so should be exempt

SWMPP Only applicable if over 1 acre disturbed area. Based on estimates we should fall below that threshhold

Spec approval

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 9 of 16

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: Project not near airport

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: Not near railroad

Basis of Decision: Referenece roadway/highway section above

Part of project Highway Encroachment Permit

Basis of Decision: We do not fall under the any of the criteria here: https://www.epa.gov/title-v-operating-permits/who-has-obtain-title-v-permit

Permit Type:

Permit Type:

Law, regulation, etc. Requirements, Actions, Etc.:

Construction Topics (Based on Means and Methods) Not part of project Construction Air Pollution - Usually handled via Division 1 Specifications

Not part of project Airport Hazard/Safety Clearances

Not part of project Railroad Crossing

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Clean Air Act-Title II

Part of project Traffic Control Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 10 of 16

No Local:

Needed? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State: INDOT No Local:

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Basis of Decision: INDOTAdvises construction sites to be conscious of noise, refers to construction noise handbook for best practices:

https://www.fhwa.dot.gov/environment/noise/construction_noise/handbook/

Law, regulation, etc. Requirements, Actions, Etc.:

CWA-Section 401

Law, regulation, etc. Requirements, Actions, Etc.:

None, just advice on best practice

Basis of Decision: No major excavation on this project

Basis of Decision: Contractor will be responsible for temporary utilities

Basis of Decision: The permit required to close the roadway also discusses traffic control measures, refer to above section

Temporary Utilities (Communication, Electrical, Water, Sanitary Sewer, etc.)Part of project

Basis of Decision: We are disturbing less than an acre

Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Permit Type:

Not part of project Digging / Excavation Permit - Usually handled via Division 1 Specifications

Part of project Noise Abatement - Usually handled via Division 1 Specifications

Not part of project NPDES over an acre Construction Permit

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Permit Type:

Not part of project Hazardous Waste Removal, Transportation, and disposal

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 11 of 16

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal: USCG No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Not part of project Work in Navigable Waters - Notice to Mariners Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Basis of Decision:

Not part of project OTHER TOPIC:

Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Basis of Decision: No hazardous waste in project

Basis of Decision: Project is not working near navigable waters

Permit Type: Requirements, Actions, Etc.:Law, regulation, etc.

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 12 of 16

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Requirements, Actions, Etc.:

Law, regulation, etc.

Law, regulation, etc.

Law, regulation, etc. Requirements, Actions, Etc.:

Clean Air Act Title V, NESHAP

Permit Type:Law, regulation, etc.

Requirements, Actions, Etc.:

Operational Permits - Owner

Permit Type: Requirements, Actions, Etc.:

Clean Air Act Title V Permit

Basis of Decision: This project does not fall under any of the requirements under the Clean air act title V

Permit Type:

Permit

Not part of project AST Operation

Not part of project UST Operating

Not part of project Stationary Source Air Quality

Not part of project Solid Waste Incineration Unit

Not part of project Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: No solid waste Incineration in project

Basis of Decision: Not applicable to project

Basis of Decision: This project does not fall under any of the requirements under the Clean air act title V

Permit Type:

Septic System

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 13 of 16

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Wastewater Pump Station

Not part of project

Basis of Decision: No septic system in project

Basis of Decision: No pump stations in project

Not part of project Law, regulation, etc. Requirements, Actions, Etc.:

Drinking Water Treatment Plant Permit Type:

PWS permit

Basis of Decision: No food services in project

Safe Drinking Water Act

Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: No pretreatment in project

Permit Type:

Wastewater Treatment Plant

Not part of project Pretreatment (e.g. Oil/Water Separator)

Not part of project

Not part of project Food Services (usually acquired by the Concessioner)

Basis of Decision: No wastewater treatement plant in project

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 14 of 16

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision: No landfill nearby

Permit Type:

Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Law, regulation, etc. Requirements, Actions, Etc.:

Permit Type:

Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Law, regulation, etc. Requirements, Actions, Etc.:

Not part of project Well Construction (includes geothermal)

Not part of project Underground Injection Well

Not part of project Waste Transfer - Aggregation Facility

Not part of project Landfill

Not part of project Small Quality Generator

Permit Type:

Basis of Decision: No wast transfer in project

Basis of Decision: No injection wells in project

Basis of Decision: No well construction in project

Basis of Decision: no drinking water treatement plant in project

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 15 of 16

Permit? Jurisdiction: Agency No Federal: USEPA No State:

No Local:

Permit? Jurisdiction: Agency No Federal: FCC4

No State:

No Local:

Permit? Jurisdiction: Agency No Federal:

No State:

No Local:

RCRA-40 CFR Parts 264 and 270 Permit Type:Law, regulation, etc. Requirements, Actions, Etc.:

Basis of Decision:

Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

Not part of project OTHER TOPIC:

Not part of project OTHER TOPIC:

Not part of project Hazardous Material/Waste Storage

Basis of Decision: No communication tower on project

Permit

Basis of Decision: No permanent waste storage needed

Basis of Decision: No generator as part of project

Not part of project Communication Tower Law, regulation, etc. Permit Type: Requirements, Actions, Etc.:

NPS units: RD=Regional Director, WRD=Water Resources Division

National Park Service - Denver Service Center 1/17/2024 | page 16 of 16

FORM

File details come from the government source that posted it. Updated .