B08_Attachment 8 - CDRL_A007_FillingAdHocPanelistVacancies.pdf

PDF 131 KB Posted

Attached to
Third Party Science Neutral (TPSN) and Independent Science Advisory Panel (ISAP) for the Missouri River Recovery Program (MRRP)
Solicitation number
959006-25-R-0005
Issued by

About this file

This is a Contract Data Requirements List (CDRL) form, specifically CDRL A007, that outlines the requirements for filling ad hoc panelist vacancies for the Third Party Science Neutral (TPSN) and Independent Science Advisory Panel (ISAP) contract with the Morris K. Udall Foundation.

The CDRL requires the contractor to provide a proposed list of panelists for each vacant position to MRRIC (Missouri River Recovery Implementation Committee). MRRIC members, Lead Agencies, and the National Center will review and provide input on proposed panelists, though the contractor makes the final decision on panelist selection representing needed disciplines. The TPSN must select final panel members considering received input and using criteria from the "ISAP Engagement Strategy." Submissions are required "as necessary" and distribution is to the Technical Monitor (TM) and Contracting Officer's Representative (COR) via email. The form indicates an estimated 110-hour burden for completion and is marked as Controlled Unclassified Information (PII) with a revision date of December 2024.

View the file

Other files

File Type Posted
B08 Request for Quote_95900625R0005_Amendment 03.pdf PDF
B08_RFP 25-R-0005 - QandA_v1_FINAL.pdf PDF
B08_Attachment 17 - SAMPLE_Large Review_ISAP Eval draft revised Appx D PSPAP Monitoring Plan_103020.pdf PDF
B08_Attachment 10 - FAR Clause 52.212-3_REV.pdf PDF
B08_Attachment 1 - Performance Work Statement_PWS_REV.pdf PDF
B08_Attachment 18 - SAMPLE_Small Review_DraftAMCR2020-ISAP-Review_20April2021Final.pdf PDF
B08_Attachment 14 - Combined_Plenary 2024_Summary and Slides.pdf PDF
B08_Attachment 11 - PRICE Quote_Template_v1_REV.xlsx XLSX spreadsheet
B08 Request for Quote_95900625R0005_Amendment 02_SIGNED.pdf PDF
B08_Attachment 15 - Combined_Fall Science Meeting Memos and Presentations.pdf PDF
B08_Attachment 16 - Combined_AMW 2024_Documents_Summary and Slides.pdf PDF
B08 RFQ 959006-25-R-0005_Amendment 1.pdf PDF
B08 Request for Quote_95900625R0005.pdf PDF
B08_Attachment 12 - MRRICCharter FINAL07012008Rev05022012Rev08142014Rev01312023.pdf PDF
B08_Attachment 9 - SCA Wage Determination_2015-5473_SAM.gov.pdf PDF
B08_Attachment 2 - CDRL_A001_Contractors Progress Status and Management Report.pdf PDF
B08_Attachment 13 - USACE_MRRIC_ISAP Approach_FINAL_Approved 5-24-18.pdf PDF
B08_Attachment 10 - FAR Clause 52.212-3.pdf PDF
B08_Attachment 5 - CDRL_A004_Meeting Member Participation List.pdf PDF
B08_Attachment 7 - CDRL_A006_Discuss_and_FeedbackWrittenWorkProduct.pdf PDF
B08_Attachment 4 - CDRL_A003_Report - Large Review.pdf PDF
B08_Attachment 11 - PRICE Quote_Template.xlsx XLSX spreadsheet
B08_Attachment 6 - CDRL_A005_Discuss_and_FeedbackCharge.pdf PDF
B08_Quality Assurance Surveillance Plan.pdf PDF
B08_Attachment 3 - CDRL_A002_Report - Small Review.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled Unclassified Information (PII)

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Morris K. Udall and Steward L. Udall Foundation, 434 E University Blvd., Ste. 300, Tucson, AZ 85705.

Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHE R_X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

Filling Ad Hoc Panelist Vacancies

3. SUBTITLE 17. PRICE GROUP

A007

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

NA TOTAL PRICE

7. NOT USED 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION

As necessary

14. DISTRIBUTION

REQUIRED See Block

a. ADDRESSEE

b. COPIES

8. NOT USED 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. final See Block draft reg repr

16. REMARKS

The Contractor shall provide a proposed list of panelists for each position to MRRIC. MRRIC members, Lead Agencies, and National Center will have the opportunity to review and provide input on the proposed panelists to the Government. The Contractor shall make the final decision on choice of panelists representing the needed disciplines. The TPSN shall select the final panel members, with consideration of received input, using the criteria outlined in the “ISAP Engagement Strategy”

Distributed to TM/COR. E-Mail addresses for distribution will be provided with the contract.

NCECR TM 0 1

COR 1

15. TOTAL

0 2

G. PREPARED BY

Elisa Alvarez, COR

H. DATE Rev.

12/2024

I. APPROVED BY

J. DAT

UDALL Form 1423-1, FEB 2021 Previous editions are obsolete Page 1 of 1

File details come from the government source that posted it. Updated .