B08_Attachment_6_-_MARCONI_VAULT_TOILETS_A-1.pdf

PDF 388 KB Posted

Attached to
Cape Cod National Seashore- Marconi Site Vault Toi Federal contract opportunity
Solicitation number
140P4326R0007
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This is an architectural/engineering drawing specification for vault toilet installations at Marconi sites. The document provides general requirements and design specifications for double vault toilet structures that must comply with the 2024 International Building Code and 2024 International Energy Conservation Code. The design addresses structural loads including ground snow load of 250 PSF, roof live load of 40 PSF, and wind exposure Category C at 140 MPH (3-second gust), with seismic design category E and risk category II. The construction specifications detail concrete strength requirements (f'c = 2500 PSI initial, 5000 PSI final), reinforcing steel materials and placement, rebar bend radius minimums of 6x bar diameter, and welded wire fabric specifications. The exterior walls must be 1-hour rated per IBC Table 721(2), with a minimum 10-foot fire separation distance. The building design is Type V-B construction with U occupancy classification. Special conditions require accessibility to the double vault toilets to meet Americans with Disability Act (ADA) requirements. The drawing includes a panel mark key plan showing the toilet structure layout and configuration. Notes specify that no heating is provided, all installations must meet applicable state and local codes, and embedded items identified on drawings reference CXT standard embedment catalogs. Back panel finishes must include smooth trowel finish, with all rebar bends maintaining specified minimum radius requirements.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISIONS

No. Description Date

ARCHITECTS/ENGINEERS:CONSULTANTS:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

F

E

B

1 2 987643

B

C

D

E

F

PROVIDE VAULT TOILET MARCONI SITES

A

C

D

4321 765 98 10

VAULT TOILET GENERAL

REQUIREMENTS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NO HEATING PROVIDED.

AutoCAD SHX Text

INSTALLATION SHALL MEET APPLICABLE STATE AND LOCAL CODES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text ACCESSIBILITY TO THE DOUBLE VAULT TOILETS SHALL MEET AMERICAN WITH DISABILITY ACT (ADA) REQUIREMENT.

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title:

AutoCAD SHX Text Project Title:

AutoCAD SHX Text Location:

AutoCAD SHX Text Date:

AutoCAD SHX Text Checked:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Drawing Number:

AutoCAD SHX Text Building #-Floor:

AutoCAD SHX Text Project Number:

AutoCAD SHX Text CACO FACILITIES 99 MARCONI SITE RD WELLFLEET, MA 02667 Phone: 508-XXX-XXXX Fax:

AutoCAD SHX Text

RACEPOINT ROAD PROVINCETOWN MA 02657

AutoCAD SHX Text A-1

AutoCAD SHX Text 10/6/2025

AutoCAD SHX Text

AutoCAD SHX Text

JEC

AutoCAD SHX Text

CAPE COD NATIONAL SEASHORE

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

99 MARCONI SITE ROAD WELLFLEET, MA 02667

AutoCAD SHX Text 345518

AutoCAD SHX Text

SH 5 OF 8

Sheets and Views
NEW WORK

File details come from the government source that posted it. Updated .