This document is an architectural drawing and specification sheet for vault toilet construction at the Marconi Site. The project involves installing one double vault toilet with a utility room, requiring site preparation, excavation, and concrete work. Key work items include establishing and flagging the limit of work prior to mobilization, removing and disposing of existing trees, walkway vegetation, and appurtenances within the defined area, excavating and preparing the sub-grade for the double vault toilet structure, and preparing sub-base and form work for a new concrete slab on grade. Additionally, approximately 30 linear feet of new concrete walkway must be constructed to connect to the existing path. The drawing provides a site plan indicating the limit of work boundary, location of the vault toilet installation, existing parking area, sidewalk conditions, and reference photographs showing current site conditions and existing vault toilet facilities. The project is identified as Drawing 2-7mm, dated 10/6/2025, with project coordination handled by CADD Facilities at the Marconi Site in Wellfleet, Massachusetts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_15_-_RFIs_26-30_0003.pdf | ||
| Sol_140P4326R0007_Amd_0003.pdf | ||
| Sol_140P4326R0007_Amd_0002.pdf | ||
| Attachment_14_-_Specifications_Addendum_4-8-2026_0002.pdf | ||
| Sol_140P4326R0007_Amd_0001.pdf | ||
| Attachment_13_-_RFIs_1-25_0001.pdf | ||
| B08_Attachment_2_-_Marconi_Site_Title_Page.pdf | ||
| B08_Attachment_1_-_CACO_Vault_Toilet_Specifications.pdf | ||
| B08_Attachment_5_-_MARCONI_SITE_S-2.pdf | ||
| B08_Attachment_8_-_MARCONI_VAULT_TOILETS_A-3.pdf | ||
| Sol_140P4326R0007.pdf | ||
| B08_Attachment_4_-_MARCONI_SITE_S-1.pdf | ||
| B08_Attachment_11_-_Construction_Contract_Administration.pdf | ||
| B08_Attachment_7_-_MARCONI_VAULT_TOILETS_A-2.pdf | ||
| B08_Attachment_9_-_MARCONI_VAULT_TOILETS_A-4.pdf | ||
| B03_Attachment_10_-_Davis_Bacon_Wage_Rates_MA20260001.pdf | ||
| B08_Attachment_6_-_MARCONI_VAULT_TOILETS_A-1.pdf | ||
| B08_Attachment_12_-_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISIONS
No. Description Date
ARCHITECTS/ENGINEERS:CONSULTANTS:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
F
E
B
1 2 987643
B
C
D
E
F
PROVIDE VAULT TOILET MARCONI SITE
A
C
D
4321 765 98 10
KEYED NOTES AND DEMOLITION
VAULT TOILET LIMIT OF WORK PLAN
EXISTING SIDEWALK
EXISTING CONSTRUCTION SITE VAULT TOILETS
CODED NOTES:
1. ESTABLISH AND FLAG LIMIT OF WORK PER THE SPECIFICATION PRIOR
TO MOBILIZATION.
2. REMOVE AND DISPOSE OF EXISTING TREE WALKWAY
VEGETATION AND APPURTENANCES WITHIN THE DEFINED AREA
3. EXCAVATE AND PREPARE SUB-GRADE FOR ONE (1) DOUBLE VAULT
TOILET WITH UTILITY ROOM
4. PREPARE SUB-BASE AND FORM WORK FOR NEW CONCRETE
SLAB ON GRADE AND APPROXIMATELY 30 LINEAR FEET OF NEW
CONCRETE WALKWAY CONNECTING TO EXISTING PATH.
4.
1.
2. 3.
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title:
AutoCAD SHX Text Project Title:
AutoCAD SHX Text Location:
AutoCAD SHX Text Date:
AutoCAD SHX Text Checked:
AutoCAD SHX Text Drawn:
AutoCAD SHX Text Drawing Number:
AutoCAD SHX Text Building #-Floor:
AutoCAD SHX Text Project Number:
AutoCAD SHX Text CACO FACILITIES 99 MARCONI SITE RD WELLFLEET, MA 02667 Phone: 508-XXX-XXXX Fax:
AutoCAD SHX Text
RACEPOINT ROAD PROVINCETOWN, MA 02657
AutoCAD SHX Text D-1
AutoCAD SHX Text 10/6/2025
AutoCAD SHX Text
AutoCAD SHX Text
JEC
AutoCAD SHX Text
CAPE COD NATIONAL SEASHORE
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
99 MARCONI SITE ROAD WELLFLEET, MA 02667
AutoCAD SHX Text 345518
AutoCAD SHX Text
SH 2 OF 8
AutoCAD SHX Text AND DISPOSE OF EXISTING TREE, WALKWAY, DISPOSE OF EXISTING TREE, WALKWAY, OF EXISTING TREE, WALKWAY, EXISTING TREE, WALKWAY, TREE, WALKWAY, , WALKWAY, , APPURTENANCES WITHIN THE DEFINED AREA. . SUB-GRADE FOR ONE (1) DOUBLE VAULT ONE (1) DOUBLE VAULT (1) DOUBLE VAULT DOUBLE VAULT VAULT WITH UTILITY ROOM. UTILITY ROOM. ROOM. . SUB-BASE AND FORM WORK FOR NEW CONCRETE FOR NEW CONCRETE NEW CONCRETE CONCRETE ON GRADE AND APPROXIMATELY 30 LINEAR FEET OF NEW GRADE AND APPROXIMATELY 30 LINEAR FEET OF NEW AND APPROXIMATELY 30 LINEAR FEET OF NEW CONNECTING TO EXISTING PATH.
AutoCAD SHX Text
LIMIT OF WORK
| Sheets and Views |
| NEW WORK |
File details come from the government source that posted it. Updated .