B08_Attachment_4_-_MARCONI_SITE_S-1.pdf

PDF 154 KB Posted

Attached to
Cape Cod National Seashore- Marconi Site Vault Toi Federal contract opportunity
Solicitation number
140P4326R0007
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document is a construction plan for installing a vault toilet facility at the Marconi Site. The project requires construction of a new double vault toilet on a concrete pad with associated concrete walkway, crushed stone transition paths, accessible parking signage, and detectable warning surfaces. The concrete pad must be 4 inches thick with 4000 PSI air-entrained concrete and 6x6 W1.4xW1.4 wire fabric reinforcement, supported by a 4-inch compacted gravel subbase. The walkway specifications are identical to the pad requirements, while the crushed stone transition surface must be 4 feet wide and 4 inches deep, compacted to firm surface. A new 4x4 cedar sign post with accessible parking signage must be installed in a concrete base per specifications.

Field verification and layout requirements specify that the contractor must verify existing grades and elevations of the parking lot, existing asphalt walkway, and surrounding terrain. The design must achieve ADA-compliant accessible routes from parking to the vault toilet with cross-slopes not exceeding 2% and running slopes not exceeding 5% (1:20), except where site conditions require compliant ramp landings, along with positive drainage away from the toilet. The contractor is required to prepare a layout plan with spot-grade elevations showing proposed top-of-concrete elevations and submit it to the Contracting Officer's Representative (COR) prior to concrete placement. The modular double vault toilet must be installed per manufacturer instructions and MASSDEP permit requirements, with final slab layout and top-of-slab elevations coordinated with the COR. The contractor must also coordinate all work with the contracting officer to resolve conflicts with existing utilities, walkways, and parking areas.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

EV

IS

IO

N S

N o.

D escription

D ate one eighth inch = one foot

0 4 8 16 one quarter inch = one foot

0 4 8 three eigths inch = one foot

0 4 one half inch = one foot

0 4 three quarter inch = one foot

6" 0 2 one inch = one foot

6" 0 2 one and one half inch = one foot

6" 0 1 three inch = one foot

F E B

PRO

VIDE VAULT TOILET M

ARCONI SITE

ACD

NEW

VAULT TOILET LOCATION PLAN

C O

D

ED

N O

TES:

1.

N

EW

C

O N

C R

ETE PAD

FO

R D

O U

BLE VAU

LT TO

ILET; 4-IN

TH

IC

K, 4000 PSI,

AIR

-EN

TR

AIN

ED

C

O N

C R

ETE; 6X6 W

1.4XW

1.4 W

W

F R

EIN

FO

R

C

EM

EN

T

C

EN

TER

ED

IN

SLAB; 4-IN

C O

M

PAC

TED

G

R

AVEL SU

BBASE.

2.

N

EW

C

O N

C R

ETE W

ALKW

AY; 4-IN

TH

IC

K, 4000 PSI AIR

-EN

TR

AIN

ED

C O

N C

R

ETE; 6X6 W

1.4XW

1.4 W

W F R

EIN

FO

R C

EM

EN

T C

EN

TER

ED

IN

SLAB; 4-IN

C O

M

PAC

TED

G

R

AVEL SU

BBASE.

3.

N

EW

C

R U

SH

ED

STO

N

E TR

AN

SITIO

N

PATH

C

O N

N

EC

TIN

G

TO

EXISTIN

G

ASPH

ALT W

ALKW

AY(APPR

O

X. 6 FT X 5FT); 4-IN

D

EPTH

, C

O M

PAC

TED

TO

FIR

M

SU

R

FAC

E.

4.

N

EW

4X4 C

ED

AR

SIG

N

PO

ST W

ITH

AC

C

ESSIBLE PAR

KIN

G

SIG

N

IN

STALLED

IN

C O

N C

R

ETE BASE PER

SPEC

IFIC

ATIO

N

S.

5.

N

EW

4 FT W

ID

E BY 4 IN

C H

D

EEP C

R U

SH

ED

STO

N

E TR

AN

SITIO

N

AR

O

U N

D C

O N

C R

ETE PAD

PER

IM

ETER

; C O

M

PAC

TED

TO

FIR

M

SU

R

FAC

E.

6.

PR

O

VID

E D

ETEC

TABLE W

AR

N

IN

G

SU

R

FAC

E (TR

U

N C

ATED

D

O M

E TYPE)

BETW

EEN

W

ALKW

AY AN

D

PAR

KIN

G

AR

EA, IN

AC

C

O R

D

AN

C E W

ITH

TH

E

SPEC

IFIC

ATIO

N S.

7.

M

O D

U

LAR

D O

U

BLE VAU

LT TO

ILET TO

BE IN

STALLED

PER

M

AN

U

FAC

TU

R

ER

IN

STR

U C

TIO

N

S AN

D

M

ASSD

EP PER

M

IT

R

EQ

U

IR

EM

EN

TS; C

O N

TR

AC

TO

R

TO

C

O O

R D

IN

ATE FIN

AL SLAB LAYO

U

T

AN

D

TO

P-O

F-SLAB ELEVATIO

N S W

ITH

C

O R

PR

IO

R

TO

C O

N C

R

ETE

PLAC

EM

EN

T.

1.

3.

4.

4.

4.

FIELD

VER

IFIC

ATIO

N

AN

D

LAYO

U T N

O

TES:

1.

FIELD

-VER

IFY EXISTIN

G G

R

AD

ES AN

D

ELEVATIO

N

S O

F PAR

KIN

G

LO

T, EXISTIN

G

ASPH

ALT W

ALKW

AY, AN

D

SU

R R

O U

N D

IN

G

TER

R

AIN

2.

D

ETER

M

IN

E C

O N

C R

ETE PAD

AN

D W

ALKW

AY ELEVATIO

N

S TO

AC

H

IEVE:

A. ABAAS-C

O M

PLIAN

T AC

C

ESSIBLE R

O U

TES FR

O

M

PAR

KIN

G

TO

V AU

LT TO

ILET.

B.C R

O

SS -SLO

PES ≤ 2%

AN

D R

U N

N

IN

G

SLO

PES ≤ 5%

(1:20), EXC

EPT W

H

ER

E SITE C

O

N D

ITIO

N

S R

EQ

U

IR

E C O

M

PLIAN

T R

AM

P

LAN

D

IN

G S.

C

.PO

SITIVE D

R

AI N

AG

E AW

AY FR

O M

TH

E VAU

LT TO

ILET

3.

PR

EPAR

E A LAYO

U

T PLAN

AN

D

SPO

T-G

R

AD

E ELEVATIO

N

S SH

O

W

IN

G

PR

O

PO

SED

TO

P-O F-C

O N

C R

ETE ELEVATIO

N

S. SU

BM

IT PLAN

TO

C O

N

TR

AC

TIN

G O

FFIC

ER

'S R

EPR

ESEN

TATIVE (C

O R

) PR

IO

R

TO

PLAC

EM

EN

T.

4.

C

O O

R D

IN

ATE ALL W

O R

K W

ITH

EXISTIN

G

SITE C

O

N D

ITIO

N

S AN

D

C O

N

TR

AC

TIN

G O

FFIC

ER

TO

R

ESO

LVE C

O N

FLIC

TS W

ITH

U

TILITIES,

EXISTIN

G W

ALKW

AYS, O

R

PAR

KIN

G

2.

6.

5.

7.

File details come from the government source that posted it. Updated .