B08__Attachment_6_Cost_Proposal_Form_(257195_EISE).xlsx
XLSX spreadsheet 62 KB Posted
- Attached to
- HPTC ROOF REPLACEMENT ON EISENHOWER HOME Federal contract opportunity
- Solicitation number
- 140P2123R0023
About this file
This document contains a cost proposal form and line item cost summary for a roof replacement project at Eisenhower National Historic Site. The cost proposal form provides material, installation, and total costs for various line items involved in the project, including exterior enclosure, roofing, special construction, selective demolition, and special use elements. However, all cost values are currently listed as errors, indicating the form requires additional information to be populated. The related federal contract opportunity is solicitation number 140P2123R0023 from the Department of the Interior National Park Service for an HPTC roof replacement on the Eisenhower Home. No further details are provided on response dates, award dates, pricing terms, or set asides.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendees_5_22_2023_0001.pdf | ||
| B08__Attachment_8_Questions_Eisenhower_House_0001.xlsx | XLSX spreadsheet | |
| Sol_140P2123R0023_Amd_0001.pdf | ||
| 257195_EISE_Specifications_REVISED_0001.pdf | ||
| EISE_Roofing_Revised_Specification_Locations_0001.docx | DOCX document | |
| B08__Attachment_5_Standard_Form_24_-_Bid_Bond.pdf | ||
| B08__Attachment_8_Questions__Eisenhower_House.xlsx | XLSX spreadsheet | |
| B08__Attachment_3__Photographs_Existing_Slate_Shingle_Roof.docx | DOCX document | |
| B08__Attachment__1_Specifications_PMIS_257915.pdf | ||
| B08__Attachment_2_Construction_Drawings_Eisenhower.pdf | ||
| Sol_140P2123R0023.pdf | ||
| B08__Attachment__4__Past_Performance_Questionnaire_(EISE).docx | DOCX document | |
| B08__Attachment_7_Wage_Determination_PA20230117.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Cost Summary
| Project: | Eisenhower N.H.S Roof Replacement | Estimate By: |
| Park: | Eisenhower National Historic Site | Date: |
| Reviewed By: | |||
| Date: | |||
| Asset / Project Element | Size/Count | Units | |
| Asset / Project Element Name | 37 | Unit |
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Installation Cost/Unit | Total Install Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 4 | B20 | Exterior Enclosure | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 5 | B30 | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 16 | F10 | Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 17 | F20 | Selective Building Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 23 | XX | Special Use - 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
Subtotal Direct Construction Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $0 ERROR:#REF! ERROR:#REF!
| Direct Cost Subtotal without GFP . | $ - 0 | $ - 0 | $0 | ||
| Remoteness Factor | $0 | ||||
| State & Local Taxes | $0 | ||||
| Total Direct Construction Costs | $0 | ||||
| General & Adminstration Costs | $0 | ||||
| Historic Preservation Factor | $0 | ||||
| Subtotal NET Construction Cost | $0 | ||||
| Overhead | $0 | ||||
| Profit | $0 | ||||
| Estimated NET Construction Cost | $0 | ||||
| Bonds & Permits | $0 | ||||
| Contracting Method Adjustment | $0 | ||||
| Inflation Escalation | Months | Annual Rate = | 0.00% | Inc. Bonds & CMA | ERROR:#REF! |
| Total Estimated NET Cost of Construction | ERROR:#REF! |
&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY
&6&F &A Page &P of &N &6Print Date: &D, &T
B20 - Exterior Enclosure
Summary Item B20 Exterior Enclosure Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B2010 | EXTERIOR WALLS | |||||||||
| Basic Requirement | Wood connectors | 20 | e | |||||||
| Basic Requirement | Steel nails for air nailers, 2500, 16D | 1 | e | |||||||
| Basic Requirement | Steel nails for air nailers, 2500, 10D | 2 | e | |||||||
| Basic Requirement | Steel nails for air nailers, 2500, 8D | 1 | e | |||||||
| Basic Requirement | Install new blocking, flashing and transition | 30 | sq ft | |||||||
| Basic Requirement | surface prep, exterior, painting | 30 | sq ft | |||||||
| Basic Requirement | Pre formed joint seals | 6 | CLF | |||||||
| SUBTOTAL | EXTERIOR WALLS | 37 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | B20 | Exterior Enclosure | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
B20 Exterior Enclosure 37 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
B30 - Roofing
Summary Item B30 Roofing Total Cost: ERROR:#REF!
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B3010 | ROOF COVERINGS | |||||||||
| Basic Requirement | Slate Roof Shingles | 64 | sq | |||||||
| Basic Requirement | Installation of wood shingles | 64 | sq | |||||||
| Basic Requirement | Flashing copper 16 oz sheets | 305 | SF | |||||||
| Basic Requirement | Cut flashing | 88 | sf | |||||||
| Basic Requirement | Roofing Felt | 64 | sq | |||||||
| Basic Requirement | Sheathing plywood CDX 5/8" | 3200 | sq ft | |||||||
| Basic Requirement | preformed joint seals | 6 | Unit | |||||||
| Basic Requirement | nails, material only, vinyl coated sinkers | 100 | lb | |||||||
| SUBTOTAL | ROOF COVERINGS | 37 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
F10 - Special Construction
Summary Item F10 Special Construction Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| F1010 | SPECIAL STRUCTURES | |||||||||
| Basic Requirement | Scaffolding, rental, assemble, disassemble | 1 | Unit | |||||||
| Basic Requirement | aerial lift truck, 60ft boom - rental | 30 | day | |||||||
| Basic Requirement | Temp fencing, safety fence, heavy duty/Protection barrier | 2000 | LF | |||||||
| Basic Requirement | Portable toilet | 4 | wk | |||||||
| SUBTOTAL | SPECIAL STRUCTURES | 37 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | F10 | Special Construction | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
F10 Special Construction 37 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
F20 - Selective Demolition
Summary Item F20 Selective Building Demolition Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| F2010 | BUILDING ELEMENTS DEMOLITION | |||||||||
| Basic Requirement | Selective demo, rubbish handling, dumpster, 5 ton capacity | 4 | wk | |||||||
| Basic Requirement | thermal/moisture protection, flashing, sheet metal removal | 350 | SF | |||||||
| Basic Requirement | roofing, removal of shingles | 64 | sq | |||||||
| Basic Requirement | Sheathing removal | 3200 | sq ft | |||||||
| SUBTOTAL | BUILDING ELEMENTS DEMOLITION | 37 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | F20 | Selective Building Demolition | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
F20 Selective Building Demolition 37 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
Special Use- 1
Summary Item XX Special Use - 1 Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Basic Requirement | Field Personal, Safety | 2 | wk | |||||||
| Basic Requirement | Field Personal, Superintendent | 8 | wk | |||||||
| Basic Requirement | Daily Cost Crew Per diem (Federal rate) | 60 | days | |||||||
| Basic Requirement | Daily Cost Crew Food diem (federal rate) | 60 | days | |||||||
| Basic Requirement | Field Personal, Quality Control/Enginner | 8 | wk | |||||||
| SUBTOTAL | BASE ELEMENT | 37 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | XX | Special Use - 1 | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
XX Special Use - 1 37 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T