EISE_Roofing_Revised_Specification_Locations_0001.docx

DOCX document 15 KB Posted

Attached to
HPTC ROOF REPLACEMENT ON EISENHOWER HOME Federal contract opportunity
Solicitation number
140P2123R0023
Issued by
Department of the Interior National Park Service

About this file

This document includes revised specifications and details for a federal contract opportunity for roof replacement work at the Eisenhower Home. The specifications revisions provide additional requirements for copper gutter and downspout systems, exterior finish carpentry, and exterior painting. The related federal contract opportunity is solicited by the National Park Service for roof replacement at the Eisenhower Home. The contractor must maintain safe public access to the building throughout construction and obtain permission for any activities interrupting normal operations. The specifications outline requirements for the contractor to conduct work while minimizing inconvenience to staff and ensuring safety of visitors and personnel at the occupied site.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EISE Revised Specifications Notes Specifications Revised:

01 11 00 Summary of Work: 1.4.A

· Added: The building and site will remain open during the roof replacement work. The Contractor shall provide safe access points for public and staff to enter the building as indicated on the construction drawings.

01 11 00 Summary of Work: 1.5 Public Use of Site

· Changed to:

A. The Eisenhower Home will continue to be occupied by staff and visiting public throughout the duration of the project. This includes conducting indoor house tours 7 days a week. Continuous, safe access and egress to the building must be maintained.

B. The Contractor shall, at all times, conduct their operations to ensure the least inconvenience to the public and staff. The Contractor shall take precautions to ensure the safety of the public and staff.

C. Permission to interrupt any activity or public/staff circulation must be requested in writing a minimum of 14 calendar days prior to the desired date of interruption.

D. The Contractor shall be given no less than 14 days’ notice for any events that will impact the Contractor’s work.

Specifications Added:

07 71 23 Copper Gutter and Downspout System

· 2 pages added 06 20 00 Exterior Finish Carpentry

· 2 pages added 09 91 13 Exterior Painting

· 2 pages added