This document is a Price Schedule for a National Park Service solicitation (PARK - PMIS: 245541) for the Jacob Riis Park Ship Rail Replacement project at Gateway National Recreation Area. The price schedule outlines a contract with a base bid and two option sections, each involving demolition of rails, dune excavation, concrete footing repair, rail fabrication and installation, and dune revegetation.
The solicitation (140P4525R0030) is issued by the Department of the Interior National Park Service Northeast Region, with offerors required to submit pricing for both base and option line items. The price schedule provides a structured format for contractors to quote their pricing, with specific instructions to provide unit prices, extended total prices, and to include costs for any work not explicitly listed in a specific line item. Failure to conform to the solicitation requirements may result in the proposal being deemed unacceptable.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract Price Schedule | ||||||
| National Park Service (NPS) | ||||||
| Solicitation Number: | ||||||
| PARK - PMIS: | GATEWAY NATIONAL RECREATION AREA | |||||
| (Project Management Information System) | 245541 | |||||
| Developed Area: | JABA | |||||
| Project Title: | Replace Ship Rails at Jacob Riis Park | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | ||||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | ||||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | ||||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | ||||||
| govern. Round totals and extended prices to whole dollars. | ||||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Raw Price | Price with General Conditions/Overhead/Profit/Bonds Markups |
| Base Bid: Sections A, B, C & D | ||||||
| Demolition of Rails | ||||||
| Excavation of Dune | ||||||
| Repair of Concrete footings | ||||||
| Fabrication of Rails & Installation of Rails | ||||||
| Revegetation Of Dunes | ||||||
| Subtotal: | $ - 0 | |||||
| Option A: Section E, F, & G | ||||||
| Demolition of Rails | ||||||
| Excavation of Dune | ||||||
| Repair of Concrete footings | ||||||
| Fabrication of Rails & Installation of Rails | ||||||
| Revegetation Of Dunes | ||||||
| Subtotal: | $ - 0 | |||||
| Option B: Section H | ||||||
| Demolition of Rails | ||||||
| Excavation of Dune | ||||||
| Repair of Concrete footings | ||||||
| Fabrication of Rails & Installation of Rails | ||||||
| Revegetation Of Dunes | ||||||
| Subtotal: | $ - 0 | |||||
| TOTAL: | $ - 0 |