These engineering drawings are for the "Repair Historic Ship's Rail Park Gate" project (PMIS 245541) scheduled for September 2024, located at a boardwalk site. The project involves repairing and restoring historic ship's rails along a curved boardwalk, with detailed specifications for rail reconstruction.

The drawings include multiple sheets (C1-C5) showing project location, sections, and technical details. Key technical specifications include using Douglas fir handrails, K-alloy T6 cast posts, stainless steel lag bolts, and anodized aluminum components. The design requires placing posts in existing post holes, removing encroaching sand, and matching rail elevations. The project offers a base bid with two additional options (Option A and Option B), allowing flexibility in the scope of rail repair work. Detailed installation notes emphasize that contractors must field verify measurements to ensure accurate historical rail duplication.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PMIS

245541

DATE

SEPT '24

REPAIR HISTORIC SHIP'S RAIL

PARK

GATE

PROJECT LOCATION

SHEET

C1

DRAWING

DATE

SEPT '24

REPAIR HISTORIC SHIP'S RAIL

PARK

GATE

SHEET

C2

DRAWING

SECTION G

SECTION H

BASE BID

OPTION A

OPTION B

DATE

SEPT '24

REPAIR HISTORIC SHIP'S RAIL

PARK

GATE

SHEET

C3

DRAWING

SECTION E

SECTION F

SECTION G

SECTION H

BASE BID

DATE

SEPT 2024

REPAIR HISTORIC SHIP'S RAIL

PARK

GATE

SHEET

C4

DRAWING

SECTION A

SECTION B

SECTION C

SECTION D

SECTION E

SECTION F

BASE BID

DATE

SEPT 2024

REPAIR SHIPS RAILS ON

DUNE SIDE OF BOARDWALK

JABA

PARK

GATE

SHEET

C5

DRAWING

NOTES:

1. DETAILS ARE NOT FOR FABRICATION.

DETAILS ARE TO BE USED TO ESTIMATE

FABRICATION COSTS. CONTRACTOR TO

FIELD VERIFY DETAILS TO ENSURE

ACCURATE DUPLICATION OF HISTORIC

SHIPS RAILS UPON AWARD.

2. TOP OF RAIL TO MATCH ELEVATION OF

RAILS ON THE BEACH SIZE OF THE

BOARDWALK

1 SHIP'S RAIL ELEVATION DETIAL

2 SHIP'S RAIL SPLICE DETAIL

2"

3 7 16"

3'-83 4"

1'

2"

10"

1'-11 4"

R15

8" TYP.

R7

8" TYP. POST SLOT

R71 8"

R11 2"

DOUGLAS FIR HANDRAIL

8" DIA. x 2-1/2" SST LAG BOLT WITH WASHER

3-1/2" x 4-1/2" x 38" THICK PLATE

8" ROUND WELD, CONTINUOUS

K-ALLOY T6 CAST POST

1-21/32" ANODIZED ALUMINUM SCHEDULE 80

BASEPLATE

NON-SHRINK GROUT

2" MINIMUM

BOARDWALK

UPWIND SIDE OF DUNE

MAXIMUM SLOPE TO BE 1'-6" OVER 1'

6"

97°

2"

2" DIA. x 5" HDG NUT & BOLT

DOUGLAS FIR WOOD CAP FLUSH OVER BOLT HEADS

USE WATERPROOF NON-SHRINK GLUE

POSTS TO BE PLACED IN EXISTING POST HOLES

1'-71 2"

2"

REMOVE SAND ENCROACHING ON BOARWALK

4" OF BACK SIDE OF CONCRETE FOOTING EXPOSED

8"

BARE SAND EXPOSED BEHIND FOOTING

EXISTING VEGETATION

AMMOPHILA BREVIGULATA - DUNE BEACH GRASS

SPACED 18" ON CENTER IN ALTERNATING ROWS

3 CULMS PER HOLE

riss ships rail-C1
Sheets and Views
riss ships rail-C1
riss ships rail-C2
Sheets and Views
riss ships rail-C2
riss ships rail-C3
Sheets and Views
riss ships rail-C3
riss ships rail-C4
Sheets and Views
riss ships rail-C4
riss ships rail-C5
Sheets and Views
riss ships rail-C5

File details come from the government source that posted it. Updated .