B08_Attachment_5_Bid_Schedule.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
EROS Removal and replacement of chilled and conden
Solicitation number
140G0126Q0288
Issued by

About this file

This is a Bid Schedule attachment for a Request for Quote solicitation (140G0126Q0288) issued by the Department of the Interior's US Geological Survey for construction services at the EROS Science Center in Sioux Falls, South Dakota.

The solicitation seeks professional firms to remove and replace chilled water piping and condenser water piping systems serving the 1996 building addition at the EROS facility located at 47914 252nd Street, Sioux Falls, SD 57198. A mandatory site visit is scheduled for October 6, 2026, at 9:00 AM local time. The work is classified under NAICS code 238220 and PSC Z2DB, with this opportunity designated as a total small business set-aside. The contract is subject to simplified acquisition procedures under FAR 12.201-1, with an anticipated award date of November 4, 2027. Technical design reference documents, including as-built drawings from June 12, 2020, and mechanical system design criteria, are provided as attachments for basis of design purposes only, though only specifically identified Statement of Work requirements constitute the binding contractual scope. The primary point of contact is Kimberly Schneider at the Reston Science Acquisition Branch (Kimberly_Schneider@ios.doi.gov).

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bid Schedule

Project Number:140G0126R0017Date:
Project TitleEROS Removal and Replacement of Chilled and Condenser Water Piping
Project LocationSioux Falls, SD
Offeror Name
Offeror Street
Offeror CityStateZip

CLIN Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

0000100001AReplace Condenser Water Piping- 0- 0$ - 0
00001BReplace Chilled Water Piping- 0- 0- 0
00001CReplace Heating Water Piping- 0- 0- 0
00001DUpdate Controls- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0
Overhead %0.00%
Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell G37).- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell G37) plus the calculated Overhead (cell G39).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell G37), the amount of calculated Overhead (cell G39) and the amount of calculated Profit (cell G40).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Labor Costs by Division

Edward L Roy: Enter all Material Costs by Division Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .