This document consists of HVAC equipment schedules and specifications for the Eros Data Center in Sioux Falls, South Dakota, prepared by Honeywell, Inc. The file contains detailed valve and damper schedules with technical specifications for air handling units (AHUs) and related HVAC components.
The valve schedule specifies control valves, heating coils, cooling coils, and heat recovery units across eleven AHUs, with detailed data including valve models (primarily V5013F1061 and V5013B1003), flow rates in GPM ranging from 40 to 144, line sizes from 2" to 3", pressure drops, and operator specifications (MP953C1075 model actuators operating at 8-12 PSI with direct acting control). Connection types include screwed, flanged, flared, and soldered configurations. The damper schedule covers mixing box dampers, exhaust air dampers, and cooling tower dampers across multiple units and systems, specifying damper types (D640, D641, D642, D643, D643LS), mounting configurations (vertical and horizontal blade options), duct dimensions, and MP918B1006 operator units operating at 3-13 PSI. The document was prepared as-built documentation dated May 9, 2016, with systems engineered by Honeywell and installed by Gil Haugan Construction under the supervision of Rick Krause. All schedules include clearance requirements, connection details, and reference drawings with specific installation notes indicating that sequencing is controlled through software rather than manual positioners.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT KEY QTY. SERVING
HRC-2 1 AHU 2 HEAT RECOVERY
HC-2 1 AHU 2 HEATING COIL
CC-2 1 AHU 2 COOLING COIL
HRC-5 1 AHU 5 HEAT RECOVERY
HC-5 1 AHU 5 HEATING COIL
CC-5 1 AHU 5 COOLING COIL
HRC-8 1 AHU 8 HEAT RECOVERY
HC-8 1 AHU 8 HEATING COIL
CC-8 1 AHU 8 COOLING COIL
HRC-9 1 AHU 9 HEAT RECOVERY
HC-9 1 AHU 9 HEATING COIL
CC-9 1 AHU 9 COOLING COIL
HRC-1C 1 AHU 10 HEAT RECOVER'
HC-10 1 AHU 10 HEATING COIL
CC-10 1 AHU 10 COOLING COIL
HRC-11 1 AHU 11 HEAT RECOVER'
HC-11 1 AHU 11 HEATING COIL
ARCHITECT: SPrTZNAGEL
ENGINEER: SPrTZNAGEL
GPM
CONTRACTOR: GIL HAUGAN CONSTRUCTION
SYSTEMS ENGINEER: =�OUl,GUA
INSTALLATION SUPERVISOR: RICK KRAUSE
MBH LINE
# SIZE
INLET SIZE
2 1/'Z' z'
2 1/'Z' z'
:!' 2 1/'Z'
:!' z'
:!' 2 1/'Z'
:!' 2 1/'Z'
2 1/'Z' 2 1/'Z'
2 1/'Z' z'
:!' 2 1/'Z'
2 1/'Z' z'
2 1/'Z' z'
2 1/'Z' z'
:!' z'
:!' z'
:!' 2 1/'Z' z' z'
2 1/'Z' z'
VALVE SCHEDULE
VALVE DATA OPERATOR DATA
CV PD
PATTERN CONNECTION
POSITION VALVE OPERATOR SIZE RANGE ACTION
2-WAY l-WAY SC FLG FLR SD ANG o.s. # o.s. #
40 2.9 X X V5013F1061 MP953C1075 6" 8-12# DA
40 4.1 X X V5013F1061 MP953C1075 6" 8-12# DA
63 3.4 X X V501381003 MP953C1075 6" 8-12# DA
40 4.4 X X V5013F1061 MP953C1075 6" 8-12# DA
63 2.5 X X V501381003 MP953C1075 6" 8-12# DA
63 4.4 X X V501381003 MP953C1075 6" 8-12# DA
63 1.2 X X V501381003 MP953C1075 6" 8-12# DA
40 4.4 X X V5013F1061 MP953C1075 6" 8-12# DA
63 3.9 --x X V501381003 MP953C1075 6" 8-12# DA
40 1.2 X X V5013F1061 MP953C1075 6" 8-12# DA
40 1.8 X X V5013F1061 MP953C1075 6" 8-12# DA
40 3.9 IX X V5013F1061 MP953C1075 6" 8-12# DA
40 4.8 X X V5013F1061 MP953C1075 6" 8-12# DA
40 8.1 X X V5013F1061 MP953C1075 6" 8-12# DA
63 5.2 _;x.,, X V501381003 MP953C1075 6" 8-12# DA
40 1.2 X X V5013F1061 MP953C1075 6" 8-12# DA
40 1.8 X X V5013F1061 MP953C1075 6" 8-12# DA
X X MP953C1075
X X MP953C1075
X ;
X
MP953C1075
I
MP953C1075
X MP953C1075
X X I
I
X
X X X X
IX
IX X
1:!' s· DA
X X
SEE SEE
DETAIL ORDER DWG REMARKS -�
NO AS
A
A
A
A
A
A
A
A NO POSmONERS PROVIDED
A BECAUSE SEQUENCING
DONE THROUGH SOFTWARE
A
A
A
A
A
A
A
A
C
B 3/4" NPT
DETAIL "A" DETAIL "D"
SUPPLY- -RETURN SUPPLY -� _ RETURN
DETAIL "B"
-RETURN
-SUPPLY
DETAIL "C"
CLEARANCE
VALVE DISTANCE*
VP525
VP526 11/2"
VP527
VP531
VP512A
33/8" VP5138
VP517A
VP513A
4" VP522AB
' 3-45 DEG SAE Fl.ARE
FITTINGS NO T BY
HONEYWELL
DETAIL "E"
3-'45 DEG SJ,E flARE
FITTINGS NOT OY
HONE'IWEI.I.
� -RETURN
1------- -SUPPLY
DETAIL "F''
VALVE
V5011, V5013
MP953C-F
(5" OPERATOR)
V5011, V5013
MP953C-F
(8" OPERATOR)
V5011, V5013
MP953C-F
(13" OPERATOR)
J-45 DEG SAE Fl.ARE
/ FITTINGS NO T OY
HONEYWELL
DISTANCE*
43/8"
53/8"
71 1/16"
* DISTANCE - FROM TOP OF OPERATOR
TO NEAREST OBSTRUCTION
LEGEND
SC -SCREWED
FLG -FLANGED
FLR -FLARED
SD -SOLDERED
ANG-ANGLED
AS BUIL TS
Honeywell, Inc.
5/09/'16 1607 "C" AVE SIOUX FALLS, SD 57104
Cl NOW ONLY I VALVE S/25/ ECW'l--------------------t - EROS DATA CENTER
A CHANGE FCI TD PNEU S/24/95 ECV SIOUX FALLS, SOUTH DAKOTA
DATE ,U,PD
j;;
r=-w••
A\\N B� JP
I
DA TE
I D l'O, BY:
SHEET 500F N���;: 958-24 Q 09-5 Q
R�.
HRC-1 1 AHU 1 HEAT RECOVERY 1 1/2"
HC-1 1 AHU 1 HEATING COIL 2"
CC-1 1 AHU 1 COOLING COIL 1 1/2"
AHU 3 HEAT RECOVERY 2"HRC-3
HC-3
CC-3
HRC-4
HC-4
CC-4
HRC-6
HC-6
CC-6
AHU 3 HEATING COIL
AHU 3 COOLING COIL
AHU 4 HEAT RECOVERY
AHU 4 HEATING COIL
AHU 4 COOLING COIL
AHU 6 HEAT RECOVERY
AHU 6 HEATING COIL
AHU 8 COOLING COIL
2"
2 1/2"
2"
2"
3"
1 1/4"
1 1/2"
1 1/2"
MP953C1075
MP953C1075
MP953C1075
673730-001
HONEYWELL
MP953C1075
MP953C1075
MP9531075
AHU 3 STEM IACCUATOR 1/2"ST INJ 3
ST INJ 4 1/2"
ST INJ 5 1/2"
AHU 4 STEAM ACCUATOR
AHU 5 STREAM ACCUATOR
hEAT EXCHANGER CONDENSATEHEAT eXCH 6" MP953E-1400-1
HONEYWELL
DAMPER SCHEDULE
DAMPER OPERATOR DATA
UNIT /SERVING FUNCTION DUCT SIZE DIMENSIONS MOUNTING REMARKS TYPE ClTY. EDGING FIG. AREA NORMAL FACTORY D.S. NUMBER QTY, PAC SPRING WIDTH HEIGHT A B (FT2) POSITION n�TI<"R # INTERN"' EXTERNAi RANGE
AHU-2 MIXING BOX -- -- -- -- -- -- MP918B1006 1 >< 3-13#
AHU-5 MIXING BOX -- - -- -- -- -- MP918B1006 1 >< 3-13#
AHU-8 MIXING BOX -- - -- -- -- -- MP918B1006 1 >< 3-13#
r B m
A w
AHU-9 MIXING BOX -- - --
-- -- -- MP918B1006 1 >< 3-13#
AHU-10 MIXING BOX -- -- -- -- -- -- MP918B1006 1 >< 3-13#
AHU-10 EXHAUST AIR 96" 36" D643A 1 96" 36" YES 4 24.0 N.C. MP918B1006 1 >< 3-13#
NO P OSITI ONER PROVIDED FIG. I-PARALLEL FIG. 2-PARALLEL
TYPES D640 8. D642 TYPES D640 8. D642
AHU-11 MIXING BOX MP918B1006 1 >< 3-13#
BECAUSE SEQUENCIING (VERTICAL BLADES) (HORIZONTAL BLADES)
-- -- -- -- -- -- D ONE THROUGH S OFTWARE
AHU-11 EXHAUST AIR 24" 66" D643A 1 24" 66" YES 4 11.0 N.C. MP918B1006 1 >< 3-13# MINIMUM SIZE EITHER DIMENSION - 8 IN.
CT-1 INLET 84" 78" ALUM. 1 84" 78" YES 4 45.5 N.C. MP918B1006 2 >< 3-13#
CT-1 OUTLET 84" 66" ALUM. 1 84" 66" YES 4 38.5 N.C. MP918B1006 2 >< 3-13#
�B--j Tfl.·ml
CT-2 INLET 84" 78" ALUM. 1 84" 78" YES 4 45.5 N.C. MP918B1006 2 >< 3-13#
CT-2 OUTLET 84" 66" ALUM. 1 84" 66" YES 4 38.5 N.C. MP918B1006 2 >< 3-13#
l-
CT-3 INLET 84" 78" ALUM. 1 84" 78" YES 4 45.5 N.C. MP918B1006 2 >< 3-13#
84" 66" 84" 66" 3-13#
FIG, 3-□PPOSED FIG. 4-□PP□SED
CT-3 OUTLET ALUM. 1 YES 4 38.5 N.C. MP918B1006 2 >< TYPES D641 & D643 TYPES D641 8. D643
(VERTICAL BLADES) <HORIZONTAL BLADES)
MGS-BLDG. 36" 2 2" D643LS 1 36" 2 2" -- 4 5.5 N.C. MP918B1006 1 ">< MINIMUM SIZE EITHER DIMENSION - 8 IN, 3-13# 2 POSITI ON
MECH. R O OM EF-2 72" 12" D643LS 1 72" 12"
-- 4 6.0 N.C. MP918B1006 1 >< 3-13# 2 POSITI ON PLEASE FURNISH CORRECT DUCT SIZES FOR AUTOMATIC DAMPERS FOR THE ABOVE JOB AND RETURN ONE COPY TO THE
ATTENTION OF THE \,/RITER AS SOON AS POSSIBLE. INDICATE EXACT DUCT DR OPENING SIZE. DAMPERS \,/ILL BE BUILT SMALLER TO ALLOW FOR CLEARANCE. INDICATE HORIZONTAL OR VERTICAL BLADE MOUNTING FOR MULTISECTI□N DAMPERS
BY FIGURE NUMBER.
DAMPERS ARE BUILT IN EVEN 2 IN. INCREMENTS. IF A DUCT HAS ODD DIMENSIONS, WE WILL FURNISH NEXT SMALLER EVEN SIZE. FILLER SECTIONS MUST BE FIELD FABRICATED. \,/HEN CORRECT DUCT SIZES HAVE BEEN RECEIVED, 1,/E \,/ILL ORDER THE DAMPERS FROM OUR FACTORY AND \,/ILL PROVIDE YOU WITH A DAMPER INFORMATION FORM GIVING THE EXACT SIZES OF DAMPERS WE \,/ILL SUPPLY AND AN INSTALLATION PLANNING GUIDE TO ASSIST YOUR INSTALLER.
REPLY•
THE DAMPERS WILL BE REQUIRED ON DA
SHIPPING AD.DRESS,
SIZES APPROVED BY•
REH/IRKS,
Honeywell, Inc.
C P.O. BOX 916, VALLEY FORGE, PA 19482
ARCHITECT: B AS BUILT 5/8/96
ENGINEER: A PER FIELD REVIEW EROS DATA CENTER
SIOUX FALLS, SOUTH DAKOTA
CONTRACTOR: REVISIONS DATE APPD.
SYSTEMS ENGINEER: SUPERSEDES !DRAWN BY: JP I DATE I DRAWING 958-24009-51 1BINSTALLATION SUPERVISOR: SUPERSEDED BY I APPROVED BY: I SHEET OF I NUMBER
AHU-1 MIXING BOX MP918B1006
AHU-3 MIXING BOX MP918B1006
AHU-4 MIXING BOX MP918B1006
AHU-6 MIXING BOX MP918B1006
CT-4 INLET 84" 78" ALUM 1 86" 60" YES N.C.
CT-4 OUTLET 84" 66" ALUM 1 86" 60" YES N.C.