B08_Attachment_4_PriceSched_-_HAFE_242454_(PavePres).xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- HAFE 242454, Pavement Preservation Project Federal contract opportunity
- Solicitation number
- 140P2026R0064
About this file
This is a pricing schedule template for the HAFE 242454 Pavement Preservation Project solicitation (140P2026R0064) issued by the Department of the Interior National Park Service. The Excel-based pricing schedule is designed to capture contractor cost proposals for pavement preservation work, likely including labor, materials, and equipment costs associated with road maintenance and rehabilitation activities within a National Park Service facility or area designated as HAFE 242454.
The template serves as the framework for bidders to submit their financial proposals in a standardized format that aligns with the government's evaluation requirements. Contractors responding to this solicitation would complete the pricing schedule by entering their cost estimates for the specific pavement preservation tasks and deliverables outlined in the corresponding Statement of Work or Performance Work Statement. The structured format ensures consistency across all proposals received and facilitates government comparison of pricing among competing contractors during the evaluation phase.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2026R0064_Amd_0002.pdf | ||
| Sol_140P2026R0064_Amd_0001.pdf | ||
| B08_Attachment_2_HAFE_100__Drawing_Plans.pdf | ||
| B08_Attachment_3_Wage_Determination_WV20260111.pdf | ||
| B08_Attachment_7_Past_Performance_Questionnaire.docx | DOCX document | |
| B08_Attachment_8_Experience_Form.docx | DOCX document | |
| B08_Conformed_Solicitation_140P2026R0064.pdf | ||
| B08_Attachment_1_HAFE_100__Specifications.pdf | ||
| B08_Attachment_5_General_Refrences.pdf | ||
| Sol_140P2026R0064.pdf | ||
| B08_Attachment_6_Subcontract_Percentage_Worksheet.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18 | |||||
| Solicitation Number: 140P2026R0064 | |||||
| PARK - PMIS (Project Management Information System): HAFE 242454 | |||||
| Developed Area: Harpers Ferry National Historic Park | |||||
| Project Title: | Harpers Ferry Pavement Preservation | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | BASE (AREA 1 to AREA 5) (PUBLIC ASSETS DESCRIBED BELOW) | 1 | Lump Sum | $ | $ |
| RTE 0300, Whiteman Prospect Avenue | |||||
| RTE 0921Z, Bolivar Heights Parking | |||||
| RTE 0922Z, Bolivar Heights Bus Loop | |||||
| RTE 0014, Shore Line Drive | |||||
| RTE 0918, Visitor Center Parking (Half of Entrance Road Not Paved in 2025) | |||||
| RTE 0923, Grandville School Parking | |||||
| RTE 0010, Hartzog Drive | |||||
| RTE 0902A, Facility Mainteneance Public Parking | |||||
| RTE 0933, HARTZOG Drive Parking | |||||
| RTE 0903, HAFC Lewis Anthony Parking | |||||
| RTE 0932, HAFC Bird Brady Parking | |||||
| RTE 0908, Shipley School Parking | |||||
| RTE 0900, Mather Training Center Parking | |||||
| RTE 0904, Cook Hall Parking | |||||
| RTE 0910, Morrel House Parking | |||||
| RTE 0408, Maintenance Lot Access | |||||
| RTE 0911, Bracket House Parking | |||||
| RTE 0012, Shenandoah Street | |||||
| RTE 0015, Public Way | |||||
| RTE 0913, Train Station Parking | |||||
| RTE 0915, Pulp Mill Parking | |||||
| RTE 0916, River Access Parking | |||||
| TOTAL BASE PRICE (Contract Line Item Number 1) | 1 | Lump Sum | $ | $ | |
| 2 | OPTION A, (NON-PUBLIC ASSETS DESCRIBED BELOW) | 1 | Lump Sum | $ | $ |
| RTE 0919, Visitor Center Bus Loop | |||||
| RTE 0926, Bus Maintenance Parking | |||||
| RTE 0902B, Bus Maintenance Parking | |||||
| RTE 0906, IDC Parking | |||||
| RTE 0914, Lower Town Bus Loop Parking | |||||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 2 ) ----------------------------- | $ | $ | |||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 2) -------------------------- | $ | $ | |||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-12-18 | |||||
| Solicitation Number: N2011080811 | |||||
| PARK - PMIS (Project Management Information System): YELL 012345 | |||||
| Developed Area: Old Faithful | |||||
| Project Title: Johnstonian Visitors Center | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-12-18 | |||||
| Solicitation Number: N2011080811 | |||||
| PARK - PMIS (Project Management Information System): YELL 012345 | |||||
| Developed Area: Yosemite Valley | |||||
| Project Title: Design and Build a New Structure | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .