This document is an Electrical Engineering & Lighting Quality Assurance (QA) Review Checklist for the NPS GRBA Update Lehman Caves Lighting and Communication System project. The checklist comprehensively covers electrical and lighting design requirements across multiple project phases, including Predesign, Design Development, 100% Draft Construction Documents, and 100% Complete Construction Documents.

The review checklist meticulously evaluates technical specifications such as electrical load calculations, utility coordination, power and telecommunications systems, lighting design, NEC compliance, distribution equipment sizing, branch circuiting, and special considerations for the cave environment. Key project details include the project being managed by Mark Baker from AE Design, with Jon Brooks as Principal-In-Charge and Melina Saunders as Project Manager. The project is associated with Great Basin National Park (GRBA) and focuses on updating the Lehman Caves lighting and communication systems, with specific attention to unique cave environment requirements and design standards.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name:

Park and PMIS:

NPS Project Manager:

Prime Vs. Sub Vs. Pass Through:

A/E Company:

A/E Principal-In-Charge:

A/E Project Manager:

Drawing Package/Date:

Discipline:

Included

(Yes, No, N/A) Requirement Notes

Yes All required deliverables submitted.

Yes Consistent with DSC Electrical and Lighting Design Standards.

Yes All required deliverables submitted.

Yes Consistent with DSC Electrical and Lighting Design Standards. Variances provided for cave environment special conditions.

Yes Adequate site utilities verified for the facility.

Yes Preliminary electrical load calculations appropriate for the facility.

Yes Verify initial Utility Company contact and coordination.

N/A Verify that hazardous materials to be demolished have been identified (if applicable).

Yes All required deliverables submitted.

Yes Consistent with DSC Electrical and Lighting Design Standards. Variances provided for cave environment special conditions.

Yes Power and telecom utilities shown.

Yes Proposed utility routings are shown on site plan.

Yes Loads summarized for the facility.

Yes Adequate spare capacity (25% minimum) in all systems for future considerations.

Yes Fault current calculations.

Yes System one-line diagram included.

Yes Electrical Distribution Equipment sized and shown

Yes Panelboards and larger distribution equipment are located and identified.

Yes NEC required electrical working clearances, dedicated spaces, egress routes, etc.

provided.

Variances provided for cave environment special conditions.

N/A Motor loads are identified, sized and locations shown.

N/A Exit signage and Emergency Egress lighting identified and properly located.

Variances provided for cave environment special conditions.

N/A Lighting verified as being in accordance with IESNA recommendations and

NFPA/IBC requirements.

Variances provided for cave environment special conditions.

N/A Exterior lighting fixtures verified as being full cut-off type and dark sky friendly.

Yes Lighting design sustainable (daylighting considerations, energy efficiency, lighting controls, FEMP).

Yes Lighting Fixture Schedule.

Yes Lighting fixture types, controls and locations are shown.

Yes Lightning Protection evaluation and recommendations included.

N/A Intrusion alarm system per Park requirements and accepted industry standards and practices.

Yes Telecommunications and IT systems per Park requirements and accepted industry standards.

Variances provided for cave environment special conditions.

N/A Emergency power needs have been addressed.

N/A Floor plan backgrounds match Architectural drawings.

Yes Outline specs provided for all required sections.

Yes Verification of Utility Company Coordination.

Yes All required deliverables submitted.

Yes Consistent with DSC Electrical and Lighting Design Standards. Variances provided for cave environment special conditions.

Yes Detailed, NEC compliant electrical load and fault current calculations provided.

Yes Overcurrent protection devices coordinated.

Yes AIC values correct.

Yes Disconnects properly sized, rated, located and identified for equipment served.

Yes Electrical Distribution Equipment properly sized.

Yes NEC required electrical working clearances, dedicated spaces, egress routes, etc.

provided.

Variances provided for cave environment special conditions.

Yes Branch circuiting clearly identified for all equipment and devices.

Yes Verify occupancy type and wiring method used.

Yes Conductor fill and deration correct.

N/A Exit signage and emergency lighting completed and properly located.

Variances provided for cave environment special conditions.

N/A Exit signage and emergency lighting circuits properly circuited / connected.

Variances provided for cave environment special conditions.

Project Information

Predesign

Yes

Design Development

100% Draft Constructin Documents

NPS GRBA Update Lehman Caves Lighting and Communication System

Mark Baker

Prime

AE Design

Jon Brooks

Melina Saunders

Final Updated CDs

Electrical, Technology

Electrical Engineering & Lighting QA Review Checklist

GRBA 349463 (formerly 311595)

N/A HVAC equipment shutdown by Fire alarm equipment (if applicable).

N/A Magnetic door holders coordinated with Fire alarm (if applicable).

N/A Elevator electrical systems addressed and included (if applicable).

Yes Panel Schedules completed. Schedules include load calculations and indicate proper load balance.

Yes Proper Load Balance +/- 10%.

N/A Transformers located with adequate clearances per NEC, O&M and listing requirements.

Yes Individual buildings metered separately.

N/A Dedicated branch circuit and two dedicated phone lines identified for fire alarm control panel.

N/A

Lightning protection system complies with NFPA 780 (if applicable).

Surge protection provisions provided to support added protection from lightning strikes.

Yes Communications / IT riser provided.

N/A Coordination of Exhibit and AV requirements with Exhibit designer complete (if and as applicable).

N/A Reflected ceiling plan coordinated with Architect (all Lighting, Fire & Security devices shown).

N/A Photovoltaic system in accordance with NEC requirements (if PV system included in project).

N/A Security Riser diagram (if a Security system is included in project).

Yes Utility contact information included in specifications and/or on drawings.

Yes Clearly identify all work and materials to be provided by Utility Companies.

Yes 3/4" conduit minimum.

Variances provided for cave environment special conditions.

Yes All utilities underground, unless otherwise required by cultural landscape (include trench details).

Yes Special systems schematics (i.e. sound, intercom, etc. (if and as required)).

Yes Control wiring schematics.

Yes Transient voltage surge suppression (one on each Utility / Bldg. Service Entrance -minimum).

Yes Details as required to convey/clarify project requirements.

Yes All required specification sections provided and properly edited.

Yes All required deliverables submitted.

Yes Consistent with DSC Electrical and Lighting Design Standards.

Variances provided for cave environment special conditions.

Yes All review comments from 100% Draft Review satisfactorily resolved.

100% Complete Constructin Documents