B08_Attachment_3_Submittal_Estimate.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
GRBA 349463 LEHMAN CAVES LIGHTING, ELECTRICAL, AND
Solicitation number
140P8525R0015
Issued by

About this file

This file is a Submittal List with Review Estimate Template for a National Park Service (NPS) Denver Service Center project at Lehman Caves (Project ID 349463). The document provides detailed instructions for design and construction services, specifically focusing on electrical, lighting, and telecommunications system upgrades. The template outlines submittal requirements for various electrical and communications specification sections, including product data, shop drawings, field quality-control reports, and operation and maintenance documentation.

The template is designed for both the Design Architect/Engineer (A/E) and Construction Contracting Officer Representative (COR) to track and estimate review times for different technical disciplines, including architectural, civil, structural, mechanical, electrical, and landscape architecture. It is specifically related to the solicitation 140P8525R0015 for the Lehman Caves project at Great Basin National Park, involving upgrades to electrical systems, lighting fixtures, raceway and box installations, communications cabling, and associated electrical components. The document provides a structured approach for managing technical submittals and estimating review effort across multiple engineering disciplines.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:349463 (formerly 311595)(Complete this portion for Architect / Engineer (A/E)
Project Title:GRBA Lehman Caveconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
260519Low-Voltage Electrical Power Conductors and Cables
1.4AProduct Dataxx
1.5AQualification Datax
1.5BField Quality-Control Reportsx
260533Raceway and Boxes for Electrical Systems
1.4AProduct Dataxx
260544Sleeves and Sleeve Seals for Electrical Raceways and Cabling
1.2AProduct Dataxx
260548Vibration and Seismic Controls for Electrical Systems
1.2AProduct Dataxx
260553Identification for Electrical Systems
1.3AProduct Dataxx
262416Panelboards
1.4AProduct Dataxx
1.4BShop Drawingsx
1.4CPanelboard Schedulesx
1.4DField Quality-Control Reportsx
1.5AOperation and Maintenance Datax
262726Wiring Devices
1.4AProduct Dataxx
1.4BOperation and Maintenance Datax
262816Enclosed Switches and Circuit Breakers
1.4AProduct Dataxx
1.4BShop Drawingsx
1.4CQualification Datax
264313Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
1.4AProduct Dataxx
1.5AField Quality-Control Reportsx
1.5BSample Warrantyx
1.6AOperation and Maintenance Datax
265100Lighting Fixtures
1.4AProduct Dataxx
1.4BShop Drawingsx
1.4CProduct Certificatesx
1.4DQualification Datax
1.4EField Quality-Control Reportsx
1.4FOperation and Maintenance Datax
1.4GWarrantiesx
260923Lighting Control Devices
1.3AProduct Dataxx
1.3BOperation and Maintenance Datax
270528Pathways for Communications Systems
1.3AProduct Dataxx
270544Sleeves and Sleeve Seals for Communication Systems
1.2AProduct Dataxx
271500Communications Horizontal Cabling
1.3AProduct Dataxx
1.3BShop Drawingsx
5430Unistrut Shop Drawings and Calculations (Type 304 S Stl)XXXX
5430Stainless Steel Anchors (Type 304 S Stl)XX
5120Stainless Steel Posts (Type 304 S Stl) for Switches and PhonesXXX

Total: 0 0 0 0 0 0 0