B08_Attachment_3_DEVA_Titus_Canyon_Road_Repair_Final_Plans_34x22.pdf
PDF 20 MB Posted
- Solicitation number
- 140P2026R0013
About this file
These are construction drawings for the repair of flood-damaged Titus Canyon Road in Death Valley National Park, prepared by Stantec for the National Park Service. The 81-sheet set of technical plans covers a comprehensive road repair project spanning approximately 740.54 stations (roughly 7.4 miles), located across California and Nevada, specifically within Inyo and Nye counties.
The design documents detail road restoration with specific technical parameters, including: repairing flood damage while maintaining the road's existing character as a high-clearance vehicle route, implementing erosion control measures, creating temporary and permanent truck turnarounds, establishing resource protection and monitoring areas, and preserving environmental sensitivity. Key design principles include minimizing material off-haul, balancing earthwork across the site, avoiding natural and protected features, and restoring disturbed areas using salvaged surface materials. The project is designed for vehicles with four-wheel drive and all-terrain capabilities, with typical travel speeds under 15 mph, and will include paleontological and cultural resource monitoring throughout construction activities.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR
OJEC
T L
OCA
TIO
N
SCALE OF MILES
20 0 20
BASIC DATA:
CALIFORNIA & NEVADA
USGS TOPO MAP; PARK MINI FOLDER 1987; REVISED & REDRAWN 3/93. UPDATED 11/98. SGS.
DRAWING NO.
OF
TITLE OF PROJECT
PMIS / PKG NO.
SHEET
COUNTYREGION STATE
CONSTRUCTION DRAWINGS 143
193327
NAME OF PARK
LOCATION WITHIN PARK
DEATH VALLEY NATIONAL PARK
INYO/NYE CALIFORNIA/NEVADAPACIFIC WEST
TITUS CANYON
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
MARK SHEET REVISION DATE INITIAL
PL
O
T D
AT
E:
/1
5/
:2
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \D
EV
A
TI
TU
S C
AN
YO
N R
O
AD
R
EP
AI
R
D
O C
U M
EN
TS
\0 3_
D
AT
A\ C
AD
\R
EV
0\
R
EV
A_ P1
0\ D
EV
A\
\C
AD
V2
2D
R
AW
IN
G
S\ C
IV
IL
\C 1_
C O
VE
R
.D W
G
A/E FIRM
PRIME/GEOTECH:
STANTEC
QUALITY DESIGN CERTIFICATION
Project Manager Date
Prepared in Accordance with Design Development (Title I) ______________ OR Drawing No.
Variance from Design Development (Title I) Approved by Superintendent on __________ OR Date Construction Drawing Not Preceded by Design Development (Title I)
335272
REPAIR FLOOD-DAMAGED
TITUS CANYON ROAD
SHEET INDEX
SHEET SUB
SHEET SHEET TITLE
1 C1 COVER
2 C2 NOTES
3 C3 INDEX
4 C4 SURVEY CONTROL
5 C5 AVOIDANCE AND MONITORING AREAS
SHEET 1
6 C6 AVOIDANCE AND MONITORING AREAS
SHEET 2
7 D1 DETAIL SHEET 1
8 D2 DETAIL SHEET 2
9 D3 DETAIL SHEET 3
10 D4 DETAIL SHEET 4
11 D5 DETAIL SHEET 5
12 D6 DETAIL SHEET 6
13 D7 DETAIL SHEET 7
14 D8 DETAIL SHEET 8
15 D9 DETAIL SHEET 9
16 D10 DETAIL SHEET 10
17 D11 DETAIL SHEET 11
18 P1 PLAN & PROFILE STA. 0+00 TO 30+00
19 P2 PLAN & PROFILE STA. 30+00 TO 60+00
20 P3 PLAN & PROFILE STA. 60+00 TO 90+00
21 P4 PLAN & PROFILE STA. 90+00 TO 120+00
22 P5 PLAN & PROFILE STA. 120+00 TO 150+00
23 P6 PLAN & PROFILE STA. 150+00 TO 180+00
24 P7 PLAN & PROFILE STA. 180+00 TO 210+00
25 P8 PLAN & PROFILE STA. 210+00 TO 240+00
26 P9 PLAN & PROFILE STA. 240+00 TO 270+00
27 P10 PLAN & PROFILE STA. 270+00 TO 280+00
28 P11 PLAN & PROFILE STA. 280+00 TO 290+00
29 P11A ALIGNMENT SHIFT STA. 281+50 TO 281+14
30 P11B STA. 285+64 GRADING
31 P12 PLAN & PROFILE STA. 290+00 TO 300+00
32 P13 PLAN & PROFILE STA. 300+00 TO 330+00
33 P14 PLAN & PROFILE STA. 330+00 TO 360+00
34 P15 PLAN & PROFILE STA. 360+00 TO 390+00
35 P16 PLAN & PROFILE STA. 390+00 TO 420+00
36 P16A STA. 404+65 TO STA. 407+10 ROADWAY
GRADING SHEET
37 P16B STA. 404+65 TO STA. 407+10 STAGING
GRADING SHEET
38 P17 PLAN & PROFILE STA. 420+00 TO 442+00
39 P18 PLAN & PROFILE STA. 442+00 TO 454+00
40 P18A WHITE PASS ROADWAY GRADING SHEET
41 P18B WHITE PASS PARKING GRADING SHEET
42 P19 PLAN & PROFILE STA. 454+00 TO 466+00
43 P20 PLAN & PROFILE STA. 466+00 TO 478+00
44 P21 PLAN & PROFILE STA. 478+00 TO 490+00
45 P21A STA. 487+54 TO STA. 489+00 GRADING
SHEET 1
46 P21B STA. 487+54 TO STA. 489+00 GRADING
SHEET 2
47 P22 PLAN & PROFILE STA. 490+00 TO 502+00
48 P23 PLAN & PROFILE STA. 502+00 TO 514+00
49 P24 PLAN & PROFILE STA. 514+00 TO 526+00
50 P25 PLAN & PROFILE STA. 526+00 TO 538+00
51 P26 PLAN & PROFILE STA. 538+00 TO 550+00
52 P27 PLAN & PROFILE STA. 550+00 TO 562+00
53 P27A STA. 557+36 TO 562+79 GRADING SHEET 1
54 P27B STA. 557+36 TO 562+79 GRADING SHEET 2
55 P28 PLAN & PROFILE ST. 562+00 TO 574+00
56 P28A STA. 567+28 TO STA. 571+89 GRADING
SHEET
57 P29 PLAN & PROFILE STA. 574+00 TO 586+00
58 P30 PLAN & PROFILE STA. 586+00 TO 594+00
59 P30A CROSSING 2
60 P31 PLAN & PROFILE STA. 594+00 TO 606+00
61 P32 PLAN & PROFILE STA. 606+00 TO 618+00
62 P32A CROSSING 3
63 P33 PLAN & PROFILE STA. 618+00 TO 630+00
64 P33A CROSSING 4
65 P33B CROSSING 5
66 P33C STA. 627+24 TO STA. 628+02 GRADING
SHEET
67 P34 PLAN & PROFILE STA. 630+00 TO 640+00
68 P34A STA. 634+33 TO STA. 635+43 GRADING
SHEET
69 P35 PLAN & PROFILE STA. 640+00 TO 650+00
70 P36 PLAN & PROFILE STA. 650+00 TO 660+00
71 P37 PLAN & PROFILE STA. 660+00 TO 670+00
72 P37A STA. 667+00 TO 674+00 GRADING SHEET 1
73 P38 PLAN & PROFILE STA. 670+00 TO 680+00
74 P39 PLAN & PROFILE STA. 680+00 TO 690+00
75 P40 PLAN & PROFILE STA. 690+00 TO 720+00
76 P40A STA. 695+51 TO STA. 697+69 GRADING
SHEET
77 P41 PLAN & PROFILE STA. 720+00 TO 740+54
78 P41A STA. 724+94 TO 735+08 GRADING SHEET
79 FC1 FALLS CANYON TRAILHEAD TRAFFIC
CONTROL PLAN
80 FC2 FALLS CANYON TRAILHEAD PARKING
PLAN & GRADING
81 D12 DETAIL SHEET 12
PROJECT LOCATION
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
DAYLIGHT PASS MIXING TABLE SITE
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
2_ N
O
TE
S.
D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL C2
NOTES
ABBREVIATIONS
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
AC ASPHALT CONCRETE
APPROX APPROXIMATELY
ASTM AMERICAN SOCIETY FOR THE TESTING OF MATERIALS
ATSSA AMERICAN TRAFFIC SAFETY SERVICES ASSOCIATION
AWG AMERICAN WIRE GAUGE
BCY BANK CUBIC YARD
BGN BEGIN
BMP BEST MANAGEMENT PRACTICES
BVC BEGIN VERTICAL CURVE
CA CALIFORNIA
CALTRANS CALIFORNIA DEPARTMENT OF TRANSPORTATION
CASQA CALIFORNIA STORMWATER QUALITY ASSOCIATION
CC CENTER TO CENTER
CL (OR C/L) CENTER LINE
CLF CONSTRUCTION LIMIT FENCE
CO CONTRACTING OFFICER
CP CONTROL POINT
DIA DIAMETER
EA EACH
EG EXISTING GROUND
ELEV ELEVATION
EVC END VERTICAL CURVE
EX EXISTING
FG FINISHED GRADE
FHWY FEDERAL HIGHWAY ADMINISTRATION
FT FEET OR FOOT
ID INSIDE DIAMETER
LF LINEAR FOOT
LT LEFT
LVC LENGTH OF VERTICAL CURVE
MAX MAXIMUM
MDD MAXIMUM DRY DENSITY
MIN MINIMUM
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
NDEP NEVADA DEPARTMENT OF ENVIRONMENTAL PROTECTION
NPS NATIONAL PARK SERVICE
NTS NOT TO SCALE
NV NEVADA
OC ON CENTER
OD OUTSIDE DIAMETER
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
QSD QUALIFIED SWPPP DESIGNER
QSP QUALIFIED SWPPP PREPARER
R RADIUS
RC RELATIVE COMPACTION
RT RIGHT
RWQCB REGIONAL WATER QUALITY CONTROL BOARD
SCH SCHEDULE
SF OR SQFT SQUARE FOOT
STA STATION
SWPPP STORMWATER POLLUTION PREVENTION PLAN
TYP TYPICAL
USDA UNITED STATES DEPARTMENT OF AGRICULTURE
W/ WITH
NOTES:
1. THE BEARINGS AND COORDINATES SHOWN HEREIN ARE BASED ON THE CALIFORNIA COORDINATE SYSTEM (CCS83), ZONE 4, 2017.50 EPOCH, AND WERE DETERMINED BY GLOBAL POSITIONING SYSTEM (GPS) TIES TO FIVE CALIFORNIA SPATIAL REFERENCE NETWORK (CSRN) STATIONS REFERRED TO AS “LITT”, “P092”, “P596”, “REPO”, AND “TIVA”. PUBLISHED HORIZONTAL ACCURACIES ON THESE STATIONS
MEET OR EXCEED FEDERAL GEOGRAPHIC DATA COMMITTEE (FDGC) 5-MILLIMETER ACCURACY
CLASSIFICATION PER FGDC-STD-007.2-1998. SAID CSRN POSITIONS WERE HELD “FIXED”
HORIZONTALLY IN THIS SURVEY.
THE CCS83 BEARING BETWEEN CSRN STATIONS “P092” AND “LITT” BEING S 87°30'09.09” E, WAS USED AS THE BASIS OF BEARINGS FOR THIS SURVEY, AS DERIVED FROM THE POSITIONS PUBLISHED BY
OPAC/CSRC ON 11/11/2017. COORDINATES SHOWN HEREIN ARE SHOWN AS U.S. SURVEY FEET.
STATION NORTHING EASTING
P092 2179747.6211 7028079.7272
LITT 2165697.2344 7350212.3358
THE ELEVATIONS SHOWN HEREIN ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), AS DETERMINED BY TIES TO THE ABOVE STATIONS USING GEOID18 FOR MODELING.
ALL COORDINATES SHOWN HEREIN ARE GRID. ALL MEASURED DISTANCES SHOWN HEREIN ARE GRID.
TO OBTAIN GROUND DISTANCES, DIVIDE GRID DISTANCES BY THE COMBINED SCALE FACTOR (CSF) OF 0.99973619. A CONVERGENCE ANGLE OF -01°12'42.58” WAS TAKEN AT SET AERIAL TARGET
NUMBER 14.
STATION NORTHING EASTING ELEVATION MAPPING ANGLE CSF
14 2192762.475 7156080.011 4504.439 -01°12'42.58” 0.99973619
THERE ARE DIFFERENT SCALES USED ON THE PLAN AND PROFILE SHEETS BASED ON THE LEVEL OF DETAIL OF DESIGN. THE 100 SCALE SHEETS HAVE LOWER RESOLUTION TOPOGRAPHY (5' CONTOUR ACCURACY) AND SURVEY DATA, AND PROPOSED IMPROVEMENTS WILL BE FIELD FIT AS DIRECTED BY NPS CO. THE 40 SCALE SHEETS HAVE HIGHER RESOLUTION TOPOGRAPHY (1' CONTOUR ACCURACY)
AND SURVEY AND MORE DETAILED DESIGN.
2. COORDINATES SHOWN IN THE FOLLOWING PROJECTION: CALIFORNIA STATE PLANE, ZONE IV;
HORIZONTAL DATUM NORTH AMERICAN DATUM OF 1983 (NAD83) 2011; AND VERTICAL DATUM NORTH
AMERICAN VERTICAL DATUM 1988 (NAVD88), GEOID 12B IN US SURVEY FEET.
3. EXISTING EDGE OF ROADWAY IS REPRESENTATIVE TO THE PROPOSED EDGE OF ROADWAY. SEE SPECIFIC DETAILS ON HOW IT IS MODIFIED. IMPROVEMENTS ARE INTENDED TO BE APPLIED ACROSS
ENTIRE WIDTH OF PROPOSED ROADWAY.
4. ROADWAY CENTERLINE SHOWN WAS NOT SURVEYED AND IS NOT EXACT. CENTERLINE SHOWN IS APPROXIMATE AND BASED ON A BEST FIT ALIGNMENT OF THE EDGE OF THE ROADWAY PROVIDED BY THE SURVEY. THE CENTERLINE IS NOT ALWAYS IN THE CENTER OF THE ROADWAY. THIS LINE IS
APPROXIMATE AND SHOULD BE TREATED AS A BASELINE FOR CONSTRUCTION WORK. RESULTING
OFFSETS VARY THROUGHOUT THE PROJECT AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR.
5. CONTRACTOR SHALL POSSESS A VALID CONTRACTOR'S LICENSE. ALL LICENSES SHALL REMAIN IN
EFFECT THROUGHOUT THE TERM OF THIS CONTRACT.
6. CONTRACTOR TO SUBMIT TRAFFIC CONTROL, ACCESS PLAN AND SWPPP FOR APPROVAL BY
CONTRACTING OFFICER'S REPRESENTATIVE. THE SWPPP WILL BE REQUIRED TO MEET BOTH NDEP AND CA RWQCB REQUIREMENTS AS THE PROJECT IS BEING CONSTRUCTED IN BOTH STATES. PLAN TO INCLUDE RECREATIONAL ACCESS RESTRICTIONS, TRAFFIC CONTROL, SITE PROTECTIONS AND ANY ADDITIONAL APPLICABLE INFORMATION. PLAN TO BE STAMPED BY LICENSED ENGINEER OR
ATSSA CERTIFIED PROFESSIONAL.
7. THE CONTRACTOR SHALL PROTECT ALL TREES, SHRUBS, AND OTHER VEGETATION OUTSIDE OF
GRADING LIMITS DURING CONSTRUCTION. ANY EXISTING VEGETATED AREA DISTURBED BY
CONSTRUCTION OPERATIONS SHALL BE RESTORED WITH APPLICATION OF SALVAGED TOPSOIL
CONTAINING SEEDS TO MEET NEPA REQUIREMENT.
8. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER PRIOR TO SALVAGING
BOULDERS ALONG THE PROJECT ROADSIDE AND OUTSIDE THE DIRECT PROJECT ROADWAY
FOOTPRINT.THERE ARE EXISTING BOULDERS SCATTERED THROUGHOUT THE PROJECT AREA AND
NEAR THE ROADSIDE THAT MAY BE SALVAGED FOR USE ON THE PROJECT. HOWEVER, THE
CONTRACTOR SHALL NOT ENCROACH OUTSIDE THE PROJECT ROADWAY. ALL BOULDERS SHALL BE
RECOVERED AND SALVAGED WITHOUT EQUIPMENT/VEHICLES LEAVING THE ROADWAY AND
DAMAGING THE EXISTING ESTABLISHED VEGETATION.
9. CONSTRUCTION STAKING WILL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO BEGINNING
EXCAVATION OPERATIONS TO ENSURE THAT SLOPE STAKING WILL PROVIDE THE DESIRED SITE
RESTORATION TO CONFORM WITH THE EXISTING TERRAIN. DIMENSIONS SHOWN ON PLANS ARE FOR ADDITIONAL INFORMATION ONLY. ALL SITE FEATURES SHALL BE STAKED BY THE CONTRACTOR AND APPROVED BY CONTRACTING OFFICER'S REPRESENTATIVE. CAD FILES WILL BE PROVIDED BY THE
ENGINEER FOR THE CONTRACTOR'S USE IN ACCURATELY STAKING THE PROJECT LAYOUT AND
ELEVATIONS.
10. ALL DIMENSIONS GIVEN ARE IN FEET UNLESS SPECIFIED OTHERWISE.
11. ALL DIMENSIONS ARE SUBJECT TO FIELD ADJUSTMENTS AS DETERMINED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE.
12. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR IS RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR IS RESPONSIBLE FOR
THE DESIGN AND CONSTRUCTION OF PROPER SHORING OF TRENCHES IN ACCORDANCE WITH
OCCUPATIONAL SAFETY LAWS. THE DUTIES OF THE PROJECT CIVIL ENGINEER DO NOT INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTORS SAFETY IN, ON, OR NEAR THE CONSTRUCTION
SITE. SPECIAL SAFETY HAZARDS ARE PRESENT AT DEATH VALLEY NATIONAL PARK. THE
CONTRACTOR SHALL ADHERE TO SITE SPECIFIC SAFETY REQUIREMENTS AS DETAILED IN THE
SPECIFICATIONS.
13. SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER RELATIVE THERETO, IS NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE
CONTRACTING OFFICER'S REPRESENTATIVE AS SOON AS POSSIBLE FOR SUCH FURTHER
EXPLANATIONS AS MAY BE NECESSARY.
14. DESIGN VEHICLE IS A 10 WHEEL DUMP TRUCK. TRUCK TURNAROUNDS CAN ACCOMMODATE DUMP
TRUCK UNLESS OTHERWISE NOTED.
15. CONTRACTOR SHALL HARVEST MATERIAL NEEDED TO CONSTRUCT FROM LOCATIONS SHOWN ON
THE PLANS. IF MATERIAL NEEDED CANNOT BE HARVESTED ON SITE, THE CONTRACTOR SHALL
IMPORT. SEE SPECIFICATIONS FOR DETAIL AND COORDINATE IN ADVANCE WITH NPS.
16. CONTRACTOR MUST INSTALL, MAINTAIN, AND PERFORM WATER POLLUTION AND EROSION CONTROL MEASURES AND BEST MANAGEMENT PRACTICES (BMPS) TO CONFORM WITH THE PROJECT PERMITS AND SWPPP. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION AND FLH AND CFL STANDARD DRAWINGS (FHWA FP-24) FOR REPRESENTATIVE SOIL EROSION AND SEDIMENT CONTROL MEASURES
(E.G. CHECK DAM, FIBER ROLL, SILT FENCE, ROLLED EROSION CONTROL PRODUCTS).
17. ALL TRUCK TURNAROUNDS AND NATIVE AREAS TO BE DISTURBED, AS SHOWN ON THE PLAN OR DIRECTED BY THE CO, SHALL HAVE THE TOP 6IN OF SURFACING REMOVED AND STORED FOR RE-USE ON THE PROJECT. THIS MATERIAL IS CONSIDERED "TOPSOIL" AND IN ACCORDANCE WITH THE NEPA
APPROVALS, SHALL BE USED FOR RESTORATION IN AREAS IDENTIFIED BY THE CO.
18. THE ENTIRE ROADWAY (GATE TO GATE) IS CURRENTLY CLOSED TO THE PUBLIC AND WILL REMAIN
CLOSED THROUGHOUT CONSTRUCTION OF THE PROJECT.
19. DRAWINGS SHOULD BE PLOTTED AT 22"x34" FOR SCALES TO BE ACCURATE AS SHOWN.
CONTRACTOR TO VERFY SCALE USING SCALE BAR. IF PLOTTED ON 11"x17", DOUBLE SCALES AS
SHOWN.
20. SLOPES LABELS ARE WRITTEN AS A RATIO OF HORIZONTAL LENGTH TO VERTICAL LENGTH.
MAJOR CONTOUR
MINOR CONTOUR
TEMPORARY TRUCK TURNAROUND
PERMANENT TRUCK TURNAROUND
TYPE 'A' DRAIN
TYPE 'B' DRAIN
EXCAVATION
ROADWAY FILL
GULLY FILL
SALVAGE
CUT SLOPE
ROAD RIPPING
OUTSLOPE ROAD
ROADWAY ABANDONMENT
ROADWAY DIP
ROADWAY HUMP
RIPRAP/ROCK
CONC. BARRIER CORE DRAIN HUMP
CONC. BARRIER EDGE REINFORCEMENT
SLOPE REPAIR
BARRIER ROCK
BERM SALVAGE
RESOURCE PROTECTION FENCING
ROCK SCALING
BURIED GRADE PROTECTION
DETAIL BUBBLE
PROPOSED LEGEND
MAJOR CONTOUR
MINOR CONTOUR
EDGE OF DIRT ROAD
FLOW LINE
AVOIDANCE AREA
PALEONTOLOGICAL MONITORING AREA
TORTOISE MONITORING AREA
WILDERNESS BOUNDARY
V
EXISTING LEGEND
X
XX
DESIGN PARAMETERS/BASIS OF DESIGN:
1. THIS PROJECT IS A REMOTE ROAD MEANT FOR HIGH-CLEARANCE VEHICULAR ACCESS ONLY.
2. THE ROAD IS NOT INTENDED FOR USE BY PASSENGER VEHICLES. THE ROAD IS INTENDED FOR USE BY ONLY HIGH-CLEARANCE VEHICLES, IDEALLY WITH FOUR WHEEL DRIVE AND ALL-TERRAIN TIRES.
3. THERE IS NO DESIGN STANDARD FOR A ROAD OF THIS NATURE. THE PROJECT INTENT IS TO PROVIDE A
REMOTE, UNIQUE, AND CHALLENGING HIGH-CLEARANCE VEHICLE ROAD EXPERIENCE FOR
HIGH-CLEARANCE VEHICLES, SIMILAR IN NATURE TO THE WAY THE ROAD HAS FUNCTIONED FOR THE
LAST SEVERAL DECADES.
4. THE PROJECT DESIGN INTENT IS TO ONLY RESTORE THE ROADWAY FROM PREVIOUS FLOODING DAMAGE AND PROVIDE ENHANCEMENTS TO MINIMIZE MAJOR DAMAGE FROM FUTURE FLOODING EVENTS; THERE IS NO INTENT TO CHANGE THE CHARACTER, NATURE, OR DESIGN OF THE ROAD AS PART OF THE
PROJECT.
5. THERE IS NO DESIGN VEHICLE SPEED THAT IS FORMALLY INCORPORATED INTO THE HORIZONTAL AND VERTICAL ALIGNMENTS. HOWEVER, THE USE IS TYPICALLY LESS THAN 15 MPH, ALLOWING FOR SHARP
VERTICAL AND HORIZONTAL ALIGNMENT CHANGES TO FIT INTO THE NATURAL ENVIRONMENT.
6. WHERE ROADWAY SHIFTS ARE IDENTIFIED ON THE PLAN, THE INTENT FOR THE SHIFTS IS TO AVOID NATURAL OR PROTECTED FEATURES, NOT TO ENHANCE THE DESIGN OR MEET A DESIGN STANDARD.
7. THE INTENT IS TO BALANCE EARTHWORK ACROSS THE SITE AND MINIMIZE MATERIAL OFF-HAUL.
X o o
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
P12
P11
P10P17
P1 P2
P3
P4
P5 P6
P7 P8
P9
P13
P14
P15
P16
P40
P41 0+00
50+00100+00150+00
0+
250+00
300+00
350+00
400+00
450+00
500+00
0+
0+
0+
700+00
0+
.9
EXISTING ROAD WEST OF ENTRY TO TITUS BOX CANYON WILL BE AVAILABLE FOR CONTRACTOR USE. NO STOPPING, STANDING, OR WORKING BETWEEN LEADFIELD AND TRAILHEAD. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND RESTORATION TO PRE-PROJECT CONDITION OR BETTER AT COMPLETION OF PROJECT.
SEE SPECIFICATIONS FOR OTHER LIMITATIONS AND REQUIREMENTS OF ACCESS TO THE BOX CANYON.
STA. 705+00
BGN LEADFIELD TOWN SITE
STA. 727+20
END LEADFIELD TOWN SITE
STA. 740+54
ENTRY TO TITUS BOX CANYON
STA. 727+20
END LEADFIELD TOWN SITE
P18
P19P20
P21
P22
P23
P24 P25
P26
P27
P28
P29
P30
P31
P32 P33
P37
P34
P34 P17
P35
P36
P38
P39
P40
450+00
500+00
0+
0+
0+
700+00
STA. 444+78
WHITE PASS SUMMITSTA. 555+73
RED PASS SUMMIT
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
3_
IN
D
EX
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL C3
INDEX
0 2000 40002000
SCALE OF FEET
SEE INSET A
INSET A
0 1000 20001000
SCALE OF FEET
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
CP 1
1100.02
CP 2
1098.67
CP 3
1131.25
CP 4
1133.05
CP 5
1189.98
CP 6
1189.07
CP 8
1347.38
CP 7
1282.68
CP 9
1343.25
CP 10
1345.39
CP 11
1356.57
CP 12
1372.96
CP 13
1366.76
CP 14
1428.67
CP 15
1432.69
CP 16
1496.05
CP 17
1499.65
CP 18
1528.68
CP 19
1535.22
CP 20
1524.88
CP 21
1530.84
CP 22
1484.09
CP 23
1468.46
CP 24
1465.86
CP 25
1427.01
CP 26
1413.69
CP 27
1442.37
CP 28
1485.17
CP 29
1464.65
CP 30
1509.33
CP 31
1550.00
CP 32
1584.05
CP 33
1588.03
CP 34
1571.20
CP 35
1514.94
CP 36
1454.22
CP 37
1455.33
CP 38
1412.11
CP 39
1387.94
CP 40
1412.07
CP 41
1178.61CP 42
1152.19
SURVEY CONTROL POINT TABLE
POINT #
ELEVATION
1100.02
1098.67
1131.25
1133.05
1189.98
1189.07
1282.68
1347.38
1343.25
1345.39
1356.57
1372.96
1366.76
1428.67
NORTHING
2201471.44
2200934.20
2200066.18
2200441.75
2198751.14
2198240.37
2198345.01
2193889.44
2194225.98
2193674.51
2193240.56
2192762.48
2192356.02
2189664.90
EASTING
7182106.37
7182167.26
7177322.47
7177146.73
7168984.23
7169123.90
7160699.39
7158488.09
7158274.61
7157549.01
7157801.93
7156080.02
7156226.73
7153381.13
SURVEY CONTROL POINT TABLE
POINT #
ELEVATION
1432.69
1496.05
1499.65
1528.68
1535.22
1524.88
1530.84
1484.09
1468.46
1465.86
1427.01
1413.69
1442.37
1485.17
NORTHING
2190164.61
2189363.76
2189949.19
2191249.88
2191623.37
2191207.05
2191828.25
2191568.33
2191204.11
2190912.04
2190662.95
2189972.35
2189595.79
2188971.93
EASTING
7153121.22
7149637.70
7149814.54
7144126.61
7143791.51
7143709.74
7143173.28
7142132.46
7142305.49
7141748.75
7140383.11
7140802.04
7140132.01
7139480.42
SURVEY CONTROL POINT TABLE
POINT #
ELEVATION
1464.65
1509.33
1550.00
1584.05
1588.03
1571.20
1514.94
1454.22
1455.33
1412.11
1387.94
1412.07
1178.61
1152.19
NORTHING
2189809.22
2188743.62
2189559.95
2189818.48
2190694.23
2191456.11
2191996.65
2193295.25
2192949.45
2193649.90
2193287.69
2194186.59
2199451.75
2199289.61
EASTING
7139419.03
7139633.34
7138558.69
7137838.89
7136602.49
7137245.10
7136916.39
7135788.19
7135629.32
7134223.60
7133281.54
7134217.14
7128537.81
7127700.39
0+00 50+00
100+00150+00
0+
250+00
300+00
350+00
400+00
450+00
500+00
0+
0+
0+
700+00
TITUS CANYON RD
STA. 0+00.00
OFFSET: 0.00
N: 2201264.19 E: 7182184.90
TITUS CANYON RD
STA. 740+53.99
OFFSET: 0.00
N: 2199363.51 E: 7128533.89
MOUTH OF TITUS CANYON, END OF ONE WAY ROAD 10 MILES.
DEATH VALLEY NATIONAL PARK HIGHWAY (PAVED ROAD) 13 MILES
DEATH VALLEY NATIONAL PARK BOUNDARY
NEVADA
HIGHWAY #374
1.9 MILES
BEATTY, NV
8.1 MILES
STA. 324+17
APPROXIMATE CALIFORNIA/NEVADA STATE LINE
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
4_
SU
R
VE
Y.
D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL C4
SURVEY CONTROL
0 2000 40002000
SCALE OF FEET
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
0+00
50+00
100+00
150+00
0+
250+00
300+00
350+00
STA. 324+17
APPROXIMATE CALIFORNIA/NEVADA STATE LINE
STA. 268+55
APPROXIMATE STATE OF LEGISLATIVE
WILDERNESS WITH 100 FT WIDE
NON-WILDERNESS RD CORRIDOR
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
5_
AV
O
ID
AN
C
E.
D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL C5
AVOIDANCE AND
MONITORING AREAS
SHEET 1
0 1000 20001000
SCALE OF FEET
LEGEND
WILDERNESS BOUNDARY
AVOIDANCE AREA
PALEONTOLOGICAL MONITORING AREA
TORTOISE MONITORING AREA
SEE SH
EET C
NOTES
1. NO WORK, SALVAGE, OR ACCESS IS PERMITTED WITH THE WILDERNESS BOUNDARY.
2. CONTRACTOR MUST COORDINATE ACTIVITIES WITH NPS PALEONTOLOGICAL MONITORS. MONITORING WILL BE PERFORMED BY NPS OR ITS REPRESENTATIVES DURING ALL CONSTRUCTION ACTIVITIES FOR THE ENTIRE PROJECT AREA.
3. CONTRACTOR MUST COORDINATE ACTIVITIES WITH NPS CULTURAL RESOURCE MONITORS. MONITORING WILL BE PERFORMED BY NPS OR ITS REPRESENTATIVES DURING CONSTRUCTION ACTIVITIES FOR SELECT PROJECT AREAS AS INDICATED IN THE NPS LETTER OF COMPLIANCE CERTIFICATION (APPENDIX A). REFERENCE THE LETTER FOR SPECIFIC DETAILS ON THE SCOPE
OF MONITORING AND/OR AVOIDANCE REQUIRED.
4. COORDINATE WITH NPS CO FOR SPECIFIC LOCATIONS WHERE MONITORING MUST BE PROVIDED PRIOR TO STARTING
CONSTRUCTION ACTIVITIES.
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
350+00
400+00
450+00
500+00
0+
0+
0+
700+00
0+
STA. 444+78
WHITE PASS SUMMIT
STA. 555+73
RED PASS SUMMIT
STA. 705+00
BGN LEADFIELD TOWN SITE
STA. 727+20
END LEADFIELD TOWN SITE
STA. 740+54
ENTRY TO TITUS BOX CANYON
C6
AVOIDANCE AND
MONITORING AREAS
SHEET 2
0 1000 20001000
SCALE OF FEET
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
5_
AV
O
ID
AN
C
E.
D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
SEE SH
EET C
0 500 1000500
SCALE OF FEET
FALLS CANYON TRAILHEAD
NOTES
1. NO WORK, SALVAGE, OR ACCESS IS PERMITTED WITH THE WILDERNESS BOUNDARY.
2. CONTRACTOR MUST COORDINATE ACTIVITIES WITH NPS PALEONTOLOGICAL
MONITORS. MONITORING WILL BE PERFORMED BY NPS OR ITS REPRESENTATIVES
DURING ALL CONSTRUCTION ACTIVITIES FOR THE ENTIRE PROJECT AREA.
3. CONTRACTOR MUST COORDINATE ACTIVITIES WITH NPS CULTURAL RESOURCE
MONITORS. MONITORING WILL BE PERFORMED BY NPS OR ITS REPRESENTATIVES
DURING CONSTRUCTION ACTIVITIES FOR SELECT PROJECT AREAS AS INDICATED IN
THE NPS LETTER OF COMPLIANCE CERTIFICATION (APPENDIX A). REFERENCE THE
LETTER FOR SPECIFIC DETAILS ON THE SCOPE OF MONITORING AND/OR AVOIDANCE
REQUIRED.
4. COORDINATE WITH NPS CO FOR SPECIFIC LOCATIONS WHERE MONITORING MUST BE
PROVIDED PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
LEGEND
WILDERNESS BOUNDARY
AVOIDANCE AREA
PALEONTOLOGICAL MONITORING AREA
TORTOISE MONITORING AREA
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
D1
TEMPORARY TRUCK TURNAROUND
NOT TO SCALE
RESOURCE PROTECTION FENCING
NOTES:
1. CONTRACTOR TO STAKE LIMITS OF TURNAROUND DISTURBANCE AND TO HAVE
CONSTRUCTION OVERSIGHT ENGINEER/INSPECTOR CONFIRM/ACCEPT PRIOR TO ANY
CONSTRUCTION DISTURBANCE.
2. SALVAGE & STOCKPILE 4" - 6" SURFACE SOIL & CLEARED VEGETATION.
3. AFTER COMPLETION OF CONSTRUCTION EFFORTS AND TURNAROUND IS NO LONGER
REQUIRED, PERFORM THE FOLLOWING:
A. DECOMPACT ENTIRE TURNAROUND DISTURBED AREA; RIP SOIL TO 12" DEPTH. AFTER
RIPPING, REGRADE TO RESTORE PRE-PROJECT GRADES.
B. APPLY SALVAGED SURFACE MATERIAL AND WATER FOR RESTORATION OF
TURNAROUND.
C. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
D. RESTORE ROADSIDE BERM TO PERPETUATE EXISTING DRAINAGE PATTERN AS DIRECTED
BY NPS
4. SEE PLANS FOR STATIONING OF TURNAROUND CENTERLINE.
5. TEMPORARY TRUCK TURNAROUNDS LOCATED ON TOP OF PROPOSED INLET CHANNELS
SHALL BE RESTORED PER NOTE 3 UP TO THE LIMITS OF THE PROPOSED INLET CHANNEL.
ROCK BARRIERS SHALL NOT BE PLACED IN THESE LOCATIONS. SEE DETAIL 1/D8 FOR INLET
CHANNEL INFORMATION.
D2
48"
MIN
NOTES:
1. USE BLACK, GREEN, BROWN OR ORANGE FENCING MATERIALS.
2. CONSTRUCTION FENCING SHALL BE A MIN OF 48" HIGH. LEAVE 12" SPACING BETWEEN
CONSTRUCTION FENCING AND GROUND.
3. REMOVE CONSTRUCTION FENCING AFTER CONSTRUCTION HAS BEEN COMPLETED.
6. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
METAL FENCE POSTS @ 10' CC
LENGTH OF POST = 6' MIN
EMBEDDED DEPTH - 18' MIN
PLASTIC FENCING HEIGHT = 36" MIN
POST HEIGHT = 48" MIN
CONSTRUCTION FENCING
PERMANENT TRUCK TURNAROUND
NOTES:
1. CONTRACTOR TO STAKE LIMITS OF TURNAROUND DISTURBANCE AND TO HAVE
CONSTRUCTION OVERSIGHT ENGINEER/INSPECTOR CONFIRM/ACCEPT PRIOR
TO ANY CONSTRUCTION DISTURBANCE.
2. SALVAGE & STOCKPILE 4" - 6" SURFACE SOIL & CLEARED VEGETATION.
3. SEE PLANS FOR STATIONING OF TURNAROUND CENTERLINE.
4. SALVAGED SURFACE MATERIAL TO BE MOVED TO OTHER PROJECT AREAS AND
APPLIED AS NEEDED FOR REVEGETATION.
5. IDENTIFY FINISHED SURFACE MATERIAL FOR PERMANENT TRUCK TURNAROUND
ON OTHER SITES (EX: NATIVE SOIL, SALVAGED MATERIAL).
12' OR AS SHOWN ON PLANS
30'
OR AS SHOWN ON PLANS
30' RADIUS (MIN.)
UNDISTURBED DESERT
VEGETATION,
PROTECT IN PLACE
30' RADIUS (MIN.)
EXISTING TITUS CANYON ROAD
INSTALL ROCK BARRIERS AT EDGE OF
ROAD AFTER COMPLETION OF
CONSTRUCTION ACTIVITIES
LIMITS OF EXISTING ROADWAY, TYP.
UNDISTURBED DESERT
VEGETATION,
PROTECT IN PLACE
12'
OR AS SHOWN ON PLANS
30'
OR AS SHOWN ON PLANS
30' RADIUS (MIN.)
UNDISTURBED DESERT
VEGETATION,
PROTECT IN PLACE
30' RADIUS (MIN.)
EXISTING TITUS CANYON ROAD
LIMITS OF EXISTING ROADWAY, TYP.
UNDISTURBED DESERT
VEGETATION,
PROTECT IN PLACE
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
X_ D
ET
AI
LS
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL D1
DETAIL SHEET 1
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
ADJACENT ROCK
BARRIER
ROCK BARRIER, 3' TO 4' AVERAGE
DIAMETER, 2600 LB MIN.
SEE SPECIFICATIONS
1/3 ROCK HEIGHT MIN
1/2 ROCK HEIGHT MAX
1'-8"
TYP
2'-6"
MIN
BARRIER ROCK
ROCK APRON
PLAN
NOTES
1. SEE PLANS FOR WORK EXTENTS AND LOCATION.
2. SALVAGED AND NATIVE MATERIAL SHALL BE
COMPACTED PER SPECIFICATIONS.
RIPRAP BLANKET
PLAN
NOTES
1. SEE PLANS FOR RIPRAP SIZE AND LOCATION.
2. FINISHED ROAD SURFACE SHALL BE PASSABLE BY A
HIGH CLEARANCE VEHICLE AS DIRECTED BY NPS CO.
THICKNESS VARIES, SEE PLAN
2'-3'
3' MIN
4' MAX
4' MIN
5' MAX
APPLY SALVAGED MATERIAL, 3" MINUS,
OVER FINISHED ROCK APRON
PLACE SALVAGED MATERIAL,
6" TO 12", 2' TO 3' THICK,
SEE NOTE 2
UNDISTURBED
DESERT/VEGETATION
UNDISTURBED
DESERT/VEGETATION
LIMITS OF EXISTING ROADWAY, TYP.
EXISTING ROADWAY BENCH
PLACE SALVAGED
MATERIAL, 6" TO 12",
2' TO 3' THICK
SEE NOTE 2
EXISTING ROADWAY
BENCH
2% SLOPE MINIMUM, 50% SLOPE MAXIMUM
ROCK APRON TO BE FIELD FITTED TO EXISTING
SURFACE AS DIRECTED BY NPS CO
ANCHOR TRENCH OR TOE
BENCH FOOTING EXCAVATION
AS DIRECTED BY NPS CO
INSTALL GEOTEXTILE FABRIC,
SEE SPECIFICATIONS
EXCAVATE ERODED GULLY SLOPE
TO UNIFORM SOIL SLOPE
KEY IN GEOTEXTILE FABRIC 1' MIN
PLACE IMPORTED RIPRAP MATERIAL,
SEE PLANS FOR RIPRAP CLASS AND BLANKET EXTENTS
SEE SPECIFICATIONS FOR RIPRAP CLASS GRADATIONS
UNDISTURBED
DESERT/VEGETATION
UNDISTURBED
DESERT/VEGETATION
LIMITS OF EXISTING ROADWAY, TYP.
PLACE IMPORTED RIPRAP MATERIAL,
SEE PLANS FOR RIPRAP CLASS AND
BLANKET EXTENTS SEE DETAILED GRADING PLANS
FOR RIPRAP BLANKET SLOPES
ANCHOR TRENCH OR TOE
BENCH FOOTING EXCAVATION
AS DIRECTED BY NPS CO
INSTALL GEOTEXTILE FABRIC,
SEE SPECIFICATIONS
EXCAVATE EXISTING MATERIAL
TO UNIFORM SOIL SLOPE
KEY IN GEOTEXTILE FABRIC 1' MIN
PLACE RIPRAP BLANKET ACROSS ENTIRE WIDTH OF ROAD.
SEE PLANS FOR LIMITS.
2' MIN.
2' MIN.
2' MIN.
2' MIN.
BOULDER TO BE BACKFILLED TO
PROVIDE A NATURAL APPEARANCE,
TYP
0.5' TO 2'
1' MIN
2' MIN
2'
1'
EDGE OF PROPOSED ROADWAY
EDGE OF PROPOSED ROADWAY
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
X_ D
ET
AI
LS
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL D2
DETAIL SHEET 2
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
D3
PROPOSED TYPICAL "FOOTHILL" ROAD SECTION
D3
PROPOSED TYPICAL "MOUNTAIN" ROAD SECTION
NOTES:
1. SALVAGED AND NATIVE MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS.
2. BERM SALVAGE IS INTENDED AS A LOCAL MATERIAL SOURCE AND IS NOT
REQUIRED UNLESS NEEDED TO ESTABLISH MINIMUM 12' ROAD WIDTH.
RESTORE MINIMUM 12' ROAD WIDTH.
SEE PLANS FOR ROAD WIDTHS AND
OTHER ROADWAY DESIGN ELEMENTS
RESTORE MINIMUM 12' ROAD WIDTH
SEE CUT SLOPE DETAILS
VARIES
AS DIRECTED
BY NPS CO
EG
SALVAGE AND STOCKPILE EXISTING ROADWAY BERM
SEE NOTES 1 AND 2
SEE PLANS FOR SPECIFIC CONSTRUCTION EFFORTS;
WHERE EXISTING, SALVAGE OUTBOARD BERM.
SEE NOTE 1
FG
EG
FG
EDGE OF EMBANKMENT
SLOPE SCALING OF ROCK EMBANKMENT,
SEE SPECIFICATIONS
EXISTING ROADWAY TYPICAL WIDTH 10' - 25'
SEE PLANS
EXISTING OUTBOARD EXCESS GRADED MATERIAL BERMS
EXISTING CUT SLOPES
1/2H:1V TO 3H:1V
EXISTING FILL SLOPES (1/2 H:1V TO 3H:1V) AND HISTORIC
STACKED STONE RETAINING WALLS ON WESTERN PORTION
OF ROAD.
PROTECT ROCK WALLS IN PLACE/DO NOT DISTURB.
SEE PLAN VIEW FOR MORE INFORMATION AND LOCATIONS.
PROTECT EXISTING VEGETATION OUTSIDE OF
EXISTING ROADWAY BERMS TYP.
REMOVAL OF SMALL VEGETATION (<5' TOTAL SHRUB DIAMETER);
REMOVAL VEGETATION TO BE IDENTIFIED PRIOR TO BERM SALVAGE BY
CONSTRUCTION ENGINEER.
SEE SPECIFICATIONS.
PROTECT EXISTING LARGER VEGETATION (>5' TOTAL
SHRUB DIAMETER) IN PLACE; NO MATERIAL SALVAGE
OUTSIDE OF BERM PAST THIS VEGETATION; VEGETATION
TO BE PROTECTED TO BE IDENTIFIED PRIOR TO BERM
SALVAGE BY CONTRACTING NPS CO.
SEE SPECIFICATIONS.
EXISTING ROADWAY TYPICAL WIDTH 10' - 25'
SEE PLANS
SALVAGE AND STOCKPILE EXISTING SCATTERED
BOULDERS AND ROCK OUTSIDE OF ROADWAY,
SEE SPECIFICATIONS.
REMAINING WIDTH BEYOND 12- 14' WILL BE "ABANDONED" AND
PROTECTED WITH ROCK BARRIER
RESTORATION AREA OF ROAD NOT TO BE USED - SCARIFY,
AND ROCK BARRIER FOR AREAS CALLED OFF ON PLANS.
RESTORATION AREA OF ROAD NOT TO BE USED - SCARIFY,
AND ROCK BARRIER FOR AREAS CALLED OFF ON PLANS.
PLACE SALVAGED ROADWAY AND BERM MATERIAL,
3" MINUS, SEE NOTE 1
ROADWAY SURFACE FINISHED CONDITION SHALL NOT BE A "SMOOTH"
ROADWAY. ROADWAY SHALL BE FINISHED TO MEET A "HIGH-CLEARANCE
VEHICLE ROAD" AND "REMOTE" ROAD FEEL AND APPEARANCE.
SEE SPECIFICATIONS
SALVAGE AND STOCKPILE EXISTING BOULDERS AND ROCK WITHIN
ROADWAY,
SEE SPECIFICATIONS
EXISTING NATIVE SOIL SURFACE WITH EROSION DAMAGE
(1.0' - 8.0' BELOW SURROUNDINGS)
PLACE SALVAGED ROADWAY AND BERM MATERIAL,
3" MINUS, SEE NOTE 1
ROADWAY SURFACE FINISHED CONDITION SHALL NOT BE A "SMOOTH"
ROADWAY. ROADWAY SHALL BE FINISHED TO MEET A "HIGH-CLEARANCE
VEHICLE ROAD" AND "REMOTE" ROAD FEEL AND APPEARANCE.
SEE SPECIFICATIONS
SALVAGE AND STOCKPILE EXISTING BOULDERS AND ROCK WITHIN
ROADWAY, SEE SPECIFICATIONS
EXISTING NATIVE SOIL SURFACE WITH EROSION DAMAGE
(1.0' - 8.0' BELOW SURROUNDINGS)
TOE EXCAVATION
12' MIN.
EG
2' MAX. CUT
2' MAX. CUT
EG
12' MIN.
ROCK SCALING AS
DIRECTED BY NPS CO,
SEE SPECIFICATIONS
EXAMPLE OF POTENTIAL
ROCK SCALING
CUT SLOPE TO RESTORE MINIMUM 12' ROADWAY WIDTH
NOTES:
1. SALVAGED AND NATIVE MATERIAL SHALL
BE COMPACTED PER SPECIFICATIONS.
2. BERM SALVAGE IS INTENDED AS A LOCAL
MATERIAL SOURCE AND IS NOT REQUIRED
UNLESS NEEDED TO ESTABLISH MINIMUM
12' ROAD WIDTH.
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
X_ D
ET
AI
LS
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL D3
DETAIL SHEET 3
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
B, SEE NOTE
3.A AND 3.B
A, SEE NOTE
3.A AND 3.B
NOTES:
1. CUT 12' - WIDE OUTLET IN ROADSIDE BERM, UNLESS NOTED OTHERWISE ON PLANS
2. SEE PLANS FOR OUTLET CHANNEL EXCAVATION WIDTHS AND LENGTHS
3. DRAIN DIP FLOWLINE / CREST ANGLES:
A. 10% ROAD PROFILE GRADE = 60°/120° (A/B) FLOWLINE ANGLE OFF ℄
B. 5% ROAD PROFILE = 30°/150° (A/B) FLOWLINE ANGLE OFF ℄
C. 5% DIP FLOWLINE GRADE IS DESIRED (3.5% MIN)
4. PROPOSED GRADES INTO AND OUT OF THE DIP SHOWN ON THE DETAIL ARE BASED ON A 10% EXISTING ROADWAY PROFILE. GRADES FLATTER OR STEEPER THAN 10% WILL BE ADJUSTED TO MEET OR TIE IN LOCATIONS TO THE EXISTING
ROADWAY PROFILE (LENGTH BASED % GRADES WILL BE LOWER OR HIGHER ACCORDINGLY)
5. LOCATE OUTLET CHANNEL MARKER POSTS AT THE HUMP CREST AND OPPOSITE SIDE OF THE OUTLET CHANNEL. FOR OUTLET CHANNELS 10' OR LESS IN LENGTH, USE 6' METAL FENCE T POSTS AS MARKERS. FOR CHANNELS GREATER THAN 10' IN LENGTH, USE NDOT 6"x8"x8' GUARDRAIL POSTS WITH 3/8" CABLE CLOSURES AND EYE BOLTS AND 6"x8" REFLECTIVE
PLACARD ON CABLE PER DETAIL 2/D10.
6. DRAIN EXTENTS FROM EDGE OF ROAD TO EDGE OF ROAD
7. SALVAGED AND NATIVE MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS.
8. WHERE ROAD FILLING IS SPECIFIED, THE FILL SHALL BE PLACED BEFORE THE DRAINAGE STRUCTURES ARE
CONSTRUCTED ON THE ROAD.
9. ALL EXCAVATED FILL MATERIAL SHALL BE SALVAGED FOR REUSE ON THE PROJECT. NO SIDE CASTING OF MATERIAL
WILL BE ALLOWED.
0' 20' 40' 60' 80' 100' 120'
BERM
D4
TYPE 'A' DRAIN
PROPOSED CENTERLINE SECTION
PLAN
TAPER FILL EDGE
MAXIMUM 12' - WIDE OUTLET
EXCAVATION PLUS SIDE SLOPES
PROP. ROAD WIDTH VARIES,
SEE PLANS
END FILL
START CUT
40' 10' 10' 60'
120'
APPROX 1.5' CUTAPPROX 1.0' FILL
FILL EXCAVATION/CUT
TIE CREST INTO BERM OR CUT BANK
DIP FLOWLINE
SEE NOTE 3.C
14.5%EXIST 2% 12.5% EXIST
APPROX. 15%
EXIST. BERM
TYP
14.5% SEE NOTE 4
2% 15% 12.5% SEE
NOTE 4
PRIOR TO PLACEMENT OF ROADWAY FILL
EXISTING ROADWAY SHALL BE SCARIFIED
TO 4" TO 6" DEPTH,
SEE NOTE 7
ROAD PROFILE
(10% GRADE SHOWN)
SEE NOTE 3.A AND 3.B FOR
DRAIN DIP CONSTRUCTION
INFORMATION
EG
GRADE ROAD SO HUMP
CREST MATCHES DIP ANGLE UPGRADE DIP EXCAVATION
MEET EXISTING ROAD
PROFILE ELEVATION
APPROX 1.5' FILL
MEET EXISTING ROAD
PROFILE ELEVATION
PLACE SALVAGED ROADWAY
AND BERM MATERIAL, 3" MINUS,
SEE NOTE 7
SALVAGE AND STOCKPILE
EXISTING ROADWAY
SURFACING/CUT,
SEE SPECIFICATIONS
AFTER EXCAVATION OF CUT,
EXISTING SUBGRADE SHALL BE
SCARIFIED TO 4" TO 6" DEPTH,
SEE NOTE 7
CENTERLINE OF DIP FLOWLINE
AT CENTER OF ROADWAY
PROPOSED ROADWAY CENTERLINE
TYP
DIP FLOWLINE TO TERMINATE
PER PLANS WITH POSITIVE
DRAINAGE AWAY FROM
ROADWAY TO NATURAL TERRAIN
SEE NOTE 3.C
STA
FG
EG
FG
OUTLET CHANNEL MARKER POST,
TYP
SEE NOTE 5
STA/OFF BASED ON
12' ROADWAYWIDTH
HUMP CREST
TOE OF FILL
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
X_ D
ET
AI
LS
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL D4
DETAIL SHEET 4
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
0' 20' 40' 60' 80' 100' 120'110'
BERM
D5
TYPE 'B' DRAIN
PROPOSED CENTERLINE SECTION
PLAN
NOTES:
1. CUT 12' - WIDE OUTLET IN ROADSIDE BERM, UNLESS NOTED OTHERWISE ON PLANS
2. SEE PLANS FOR OUTLET CHANNEL EXCAVATION WIDTHS AND LENGTHS
3. DRAIN DIP FLOWLINE / CREST ANGLES:
A. 10% ROAD PROFILE GRADE = 60°/120° (A/B) FLOWLINE ANGLE OFF ℄
B. 5% ROAD PROFILE = 30°/150° (A/B) FLOWLINE ANGLE OFF ℄
C. 5% DIP FLOWLINE GRADE IS DESIRED (3.5% MIN)
4. PROPOSED GRADES INTO AND OUT OF THE DIP SHOWN ON THE DETAIL ARE BASED ON A 10% EXISTING ROADWAY PROFILE. GRADES FLATTER OR STEEPER THAN 10% WILL BE ADJUSTED TO MEET OR TIE IN LOCATIONS TO THE EXISTING ROADWAY PROFILE (LENGTH BASED % GRADES WILL BE
LOWER OR HIGHER ACCORDINGLY)
5. LOCATE OUTLET CHANNEL MARKER POSTS AT THE HUMP CREST AND OPPOSITE SIDE OF THE OUTLET CHANNEL. FOR OUTLET CHANNELS 10' OR LESS IN LENGTH, USE 6' METAL FENCE T POSTS AS MARKERS. FOR CHANNELS GREATER THAN 10' IN LENGTH, USE NDOT 6"x8"x8' GUARDRAIL POSTS WITH 3/8" CABLE CLOSURES AND EYE BOLTS AND 6"x8" REFLECTIVE PLACARD ON CABLE PER DETAIL 2/D10.
6. DRAIN EXTENTS FROM EDGE OF ROAD TO EDGE OF ROAD.
7. SALVAGED AND NATIVE MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS.
8. WHERE ROAD FILLING IS SPECIFIED, THE FILL SHALL BE PLACED BEFORE THE DRAINAGE STRUCTURES ARE CONSTRUCTED ON THE ROAD.
9. ALL EXCAVATED FILL MATERIAL SHALL BE SALVAGED FOR REUSE ON THE PROJECT. NO SIDE CASTING OF MATERIAL WILL BE ALLOWED.
END FILL
START CUT
PROP ROAD WIDTH VARIES,
SEE PLANS
TAPER FILL EDGE
FILL EXCAVATION/CUT
APPROX 2.0' FILL
APPROX 2.0' FILL
30' 22' 8' 30'
90'
TOE OF FILL
TIE HUMP CREST INTO BERM OR CUT BANK
GRADE TO MATCH "ROLLING" PROFILE
EXIST
12' MAX WIDE OUTLET EXCAVATION AND SIDE SLOPES
5%
EXIST. BERM
TYP
4" SCARIFICATION UNDER FILL
MEET EXISTING ROAD
AND PROFILE ELEVATION
MATCH EXISTING GRADE
HUMP CREST
DIP FLOWLINE
SEE NOTE 3.C
FLOWLINE GRADE
GRADE ROAD TO OBTAIN "ROLLING" PROFILE
EG
FG
DIP FLOWLINE TO TERMINATE
PER PLANS WITH POSITIVE
DRAINAGE AWAY FROM
ROADWAY TO NATURAL TERRAIN
SEE NOTE 3.C
14% TYP PROFILEEXIST
PROPOSED ROADWAY CENTERLINE
TYP
STA/OFF
BASED OFF 12' ROADWAY WIDTH
STA
MEET EXISTING ROAD
PROFILE ELEVATION
PRIOR TO PLACEMENT OF ROADWAY FILL
EXISTING ROADWAY SHALL BE SCARIFIED
TO 4" TO 6" DEPTH,
SEE NOTE 7
PLACE SALVAGED ROADWAY AND
BERM MATERIAL, 3" MINUS,
SEE NOTE 7
AFTER EXCAVATION OF CUT,
EXISTING SUBGRADE SHALL BE
SCARIFIED TO 4" TO 6" DEPTH,
SEE NOTE 7
0.75' MAX CUT
ROAD PROFILE
SEE NOTE 3.A AND 3.B FOR
DRAIN DIP CONSTRUCTION
INFORMATION
OUTLET CHANNEL MARKER POST,
TYP
SEE NOTE 5
SALVAGE AND STOCKPILE
EXISTING ROADWAY
SURFACING/CUT,
SEE SPECIFICATIONS
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
X_ D
ET
AI
LS
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL D5
DETAIL SHEET 5
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
D6
ROADWAY HUMP
D6
ROADWAY DIP
PLAN
PLAN
0' 20' 40' 60'
PROPOSED CENTERLINE SECTION
0' 15' 30'
PROPOSED CENTERLINE SECTION
NOTES:
1. PROPOSED GRADES INTO AND OUT OF THE DIP SHOWN ON THE DETAIL ARE BASED
ON A 10% EXISTING ROADWAY PROFILE. GRADES FLATTER OR STEEPER THAN 10%
WILL BE ADJUSTED TO MEET OR TIE IN LOCATIONS TO THE EXISTING ROADWAY
PROFILE (LENGTH BASED % GRADES WILL BE LOWER OR HIGHER ACCORDINGLY)
2. EXISTING BEDROCK MAY BE PRESENT IN LOCATIONS WHERE ROADWAY DIP IS
PROPOSED. WHERE BEDROCK IS PRESENT, ROADWAY DIP SHOULD NOT EXTEND
DEEPER THAN THE EXISTING BEDROCK. DO NOT REMOVE BEDROCK AND
COORDINATE WITH ON-SITE FIELD REPRESENTATIVE TO MODIFY DESIGN, AS
APPROPRIATE, WHERE BEDROCK IS ENCOUNTERED.
3. DIP EXTENDS FROM EDGE OF ROAD TO EDGE OF ROAD.
4. LENGTH OF DIP VARIES WITH HEIGHT, SEE BELOW.
A. 3 FT DIP = 90 FT LENGTH
B. 2 FT DIP = 60 FT LENGTH
C. 18 IN DIP = 45 FT LENGTH
D. 1 FT DIP = 30 FT LENGTH
5. MATERIAL WILL BE SALVAGED ON SITE AND SCREENED.
6. SALVAGED AND NATIVE MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS.
7. WHERE ROAD FILLING IS SPECIFIED, THE FILL SHALL BE PLACED BEFORE THE
DRAINAGE STRUCTURES ARE CONSTRUCTED ON THE ROAD.
8. ALL EXCAVATED FILL MATERIAL SHALL BE SALVAGED FOR REUSE ON THE
PROJECT. NO SIDE CASTING OF MATERIAL WILL BE ALLOWED.
NOTES:
1. DIP EXTENDS FROM EDGE OF ROAD TO EDGE OF ROAD.
2. LENGTH OF HUMP VARIES WITH HEIGHT, SEE BELOW.
A. 3 FT HUMP = 90 FT LENGTH
B. 2 FT HUMP = 60 FT LENGTH
C. 18 IN HUMP = 45 FT LENGTH
D. 1 FT HUMP = 30 FT LENGTH
3. GREATER THAN 3" MATERIAL WILL BE SALVAGED ON SITE AND SCREENED.
4. SALVAGED AND NATIVE MATERIAL SHALL BE COMPACTED PER
SPECIFICATIONS.
5. WHERE ROAD FILLING IS SPECIFIED, THE FILL SHALL BE PLACED BEFORE
THE DRAINAGE STRUCTURES ARE CONSTRUCTED ON THE ROAD.
6. LOCATE HUMP MARKER POSTS AT THE HUMP CREST AND TOE OF FILL.
USE 6' METAL FENCE T POSTS AS MARKERS.
END FILL
PROP ROAD WIDTH VARIES,
SEE PLANS
FILL
HEIGHT VARIES,
SEE PLAN
L/2 11/30 L 2/15 L
LENGTH VARIES, SEE NOTE 2
TOE OF FILL
GRADE TO MATCH
"ROLLING" PROFILE
EXIST
EXIST. BERM
TYP
4" SCARIFICATION UNDER FILL
MEET EXISTING ROAD
AND PROFILE ELEVATION
EGFG
14% TYP PROFILE
PROPOSED ROADWAY
CENTERLINE, TYP
MEET EXISTING ROAD
PROFILE ELEVATION
PRIOR TO PLACEMENT OF ROADWAY FILL
EXISTING ROADWAY SHALL BE SCARIFIED
TO 4" TO 6" DEPTH,
SEE NOTE 3
PLACE SALVAGED ROADWAY AND BERM MATERIAL, 3" MINUS.
SEE NOTE 4
EXIST. BERM
TYP
EXIST
EXCAVATION/CUT
LENGTH VARIES,
SEE NOTE 4
MEET EXISTING ROAD
AND PROFILE ELEVATION
MATCH EXISTING GRADE
EG
FG
MEET EXISTING ROAD
AND PROFILE ELEVATION
SALVAGE AND STOCKPILE EXISTING
ROADWAY SURFACING / CUT.
SEE SPECIFICATIONS
AFTER EXCAVATION OF CUT,
EXISTING SUBGRADE SHALL BE
SCARIFIED TO 4" TO 6" DEPTH,
SEE NOTE 5
DEPTH VARIES, SEE PLAN
MATCH EXISTING GRADE
GRADE TO MATCH
"ROLLING" PROFILE
EXIST
EXIST. BERM
TYP
14% TYP PROFILE
PROPOSED ROADWAY
CENTERLINE, TYP
EXIST. BERM
TYP
START CUTEND CUT
PROP ROAD WIDTH VARIES,
SEE PLANS
EXIST
BEDROCK EXISTS IN VARIOUS
LOCATIONS. SEE NOTE 2.
PLACE SALVAGED MATERIAL,
FLUSH AT THE EDGE OF ROAD
6" TO 12" DIAMETER MATERIAL,
18" THICK MIN.
SEE NOTE 6
10' 10'
5'
TIE HUMP CREST INTO BERM OR CUT BANK
HUMP CREST
10' 10'
5'
PLACE SALVAGED MATERIAL,
FLUSH AT THE EDGE OF ROAD
6" TO 12", 18" THICK MIN.
SEE NOTE 4.
HUMP MARKER POST, TYP
SEE NOTE 6
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
X_ D
ET
AI
LS
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL D6
DETAIL SHEET 6
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
FILL BANK OR
BERM
CUT BANK
ROAD EDGE
ROAD EDGE
0' 20' 40' 60' 80' 100' 110'
D7
PRECAST CONCRETE BARRIER CORE DRAIN HUMP
CENTERLINE SECTION
PLAN
DETAIL A
NOTES:
1. CUT 12' WIDE OUTLET IN ROADSIDE BERM, UNLESS NOTED OTHERWISE ON PLANS
2. SEE PLANS FOR OUTLET CHANNEL EXCAVATION WIDTHS AND LENGTHS
3. DRAIN DIP FLOWLINE / CREST ANGLES:
A. 10% ROAD PROFILE GRADE = 60°/120° (A/B) FLOWLINE ANGLE OFF ℄
B. 5% ROAD PROFILE = 30°/150° (A/B) FLOWLINE ANGLE OFF ℄
C. 5% DIP FLOWLINE GRADE IS DESIRED (3.5% MIN)
4. PROPOSED GRADES INTO AND OUT OF THE DIP SHOWN ON THE DETAIL ARE BASED ON A 10% EXISTING ROADWAY PROFILE.
GRADES FLATTER OR STEEPER THAN 10% WILL BE ADJUSTED TO MEET OR TIE IN LOCATIONS TO THE EXISTING ROADWAY
PROFILE (LENGTH BASED % GRADES WILL BE LOWER OR HIGHER ACCORDINGLY)
5. DIP EXTENDS FROM EDGE OF ROAD TO EDGE OF ROAD.
6. LOCATE OUTLET CHANNEL MARKER POSTS AT THE HUMP CREST AND OPPOSITE SIDE OF THE OUTLET CHANNEL. FOR OUTLET
CHANNELS 10' OR LESS IN LENGTH, USE 6' METAL FENCE T POSTS AS MARKERS. FOR CHANNELS GREATER THAN 10' IN LENGTH, USE NDOT 6"x8"x8' GUARDRAIL POSTS WITH 3/8" CABLE CLOSURES AND EYECBOLTS AND 6"x8" REFLECTIVE PLACARD ON CABLE
PER DETAIL 2/D10.
7. GREATER THAN 6" MATERIAL WILL BE SALVAGED ON SITE AND SCREENED.
8. SALVAGED AND NATIVE MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS.
9. WHERE ROAD FILLING IS SPECIFIED, THE FILL SHALL BE PLACED BEFORE THE DRAINAGE STRUCTURES ARE CONSTRUCTED ON
THE ROAD.
10. ALL EXCAVATED FILL MATERIAL SHALL BE SALVAGED FOR REUSE ON THE PROJECT. NO SIDE CASTING OF MATERIAL WILL BE
ALLOWED.
B, SEE NOTE 3.A AND 3.B
A, SEE NOTE
3.A AND 3.B
0.5' MIN FILL
0.5' MIN FILL
8.0'
0.75' MIN BELOW EG
4.0' BELOW EG
1.0' BELOW EG
1.0' BELOW EG
12.0' OUTLET WIDTH,
TYP
4.0' MIN
30' 22' 8' 30'
90'
PROPOSED ROADWAY FILL
TYP
PLACE SALVAGED MATERIAL, 3" TO 6".
SEE NOTE 8
GRADE TO MATCH ROLLING PROFILEBERM TYP
4" SCARIFICATION UNDER FILL
SEE NOTE 7
MATCH EXISTING GRADE
EG
FG
INSTALL PRECAST CONCRETE BARRIER,
SEE SPECIFICATIONS
SEE DETAIL 'A' FOR PRECAST CONCRETE BARRIER DETAILS
PROPOSED ROADWAY
CENTERLINE
TYP
STA
STA/OFF
BASED ON 12' ROADWAY WIDTH
MEET EXISTING ROAD
AND PROFILE ELEVATION
PLACE SALVAGED ROADWAY AND BERM MATERIAL, 3" MINUS,
SEE NOTE 8
DIP FLOWLINE TO TERMINATE PER PLANS
WITH POSITIVE DRAINAGE AWAY FROM
ROADWAY TO NATURAL TERRAIN
SEE NOTE 3.C DIP FLOWLINE
SEE NOTE 3.C
FLOWLINE GRADE
ROAD PROFILE
(10% GRADE SHOWN)
SEE NOTE 3.A AND 3.B FOR
DRAIN DIP CONSTRUCTION
INFORMATION
SALVAGE AND STOCKPILE
EXISTING ROADWAY
SURFACING/CUT, SEE
SPECIFICATIONS
AFTER EXCAVATION OF CUT,
EXISTING SUBGRADE SHALL BE
SCARIFIED TO 4" TO 6" DEPTH,
SEE NOTE 7
CENTERLINE OF DIP FLOWLINE
AT CENTER OF ROADWAY
BERM TYP
4" SCARIFICATION UNDER FILL
SEE NOTE 7
PLACE SALVAGED MATERIAL, 3" TO 6".
SEE NOTE 8
INSTALL PRECAST CONCRETE BARRIER,
SEE SPECIFICATIONS
APPROX 2.0' FILL
APPROX 2.5' FILL
DESIGNED: SUB SHEET NO. TITLE OF SHEET
09/12/2025 DEATH VALLEY NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
2/
1:
A M
U
SE
R : S
AC
KE
TT
, A
BB
Y
C :\U
SE
R
S\
AS
AC
KE
TT
\S
TA
N
TE
C
\D
EV
A
TI
TU
S
C
AN
YO
N
R O
AD
R
EP
AI
R
D O
C U
M
EN
TS
\0
3_ D
AT
A\
C
AD
\R
EV
0\ R
EV
A_
P1 0\
D
EV
A\
\C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\C
X_ D
ET
AI
LS
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
335272
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
RENO, NV
GS/PJ
SP
193327
AS
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL D7
DETAIL SHEET 7
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/15/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.: 12/31/2025
No. 016993
STEPHEN H.
PECK
PROF
ES
S I
ON
A L ENGINEER-STATE OF NEVADACIVIL
09/12/2025
EXP.:…
This is the start of the file's text. The full file is on GovTribe.