B08_Attachment_2_Bid_Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- WABA REPLACE HVAC UNITS
- Solicitation number
- 140P1325Q0034
About this file
The document is a Bid Schedule for the Washita Battlefield National Historic Site HVAC replacement project, specifically detailing the replacement of six roof-mounted package A/C units with heat pumps. The solicitation (140P1325Q0034) is issued by the Department of the Interior National Park Service Intermountain Region, seeking a contractor to install 5-ton R410a heat pump package units with 20kW electric heat strips.
The bid schedule breaks down the project costs into three main categories: Materials/Equipment (including 5-ton roof-mounted 240VAC heat pump units, heater strips, crane rental, ducting, and electrical parts), Labor (HVAC technician, laborer, equipment operator, and electrician hours), and Waste Management/Disposal (freon drainage and unit disposal/recycling). Notably, all line items currently show $0 estimated costs, suggesting the contractor will need to populate the pricing details. The quote is valid for 60 days from the date of submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1325Q0034_Amd_0002.pdf | ||
| B09_Amendment_0002_Answers_to_RFIs_6_2_25_0002.docx | DOCX document | |
| B09_Amendment_0002_Attachment_2_Bid_Schedule_0002.xlsx | XLSX spreadsheet | |
| Sol_140P1325Q0034_Amd_0001.pdf | ||
| B08_Attachment_3_CM16-Submittal_Form.pdf | ||
| Sol_140P1325Q0034.pdf | ||
| B08_Attachment_1_DOL_WD_OK20250070_5_16_25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Schedule | Park: WABA | Date of Quote: | |||
| Contractor: | |||||
| Contractor UEI#: | |||||
| Washita Battlefield National Historic Site- Replace 6 roof Mounted Package A/C units with Heat Pumps | Quote is valid for 60-days | ||||
| Item | Type | Quantity | UOM | Estimated Cost / UOM | Total Estimated Cost |
| Building Materials/ Equipment | |||||
| 5 Ton Package Units - Roof Mounted 240VAC W/ heat Pump 36,000btu | Equipment | each | $ - 0 | ||
| 20 kW Heater strips | Materials | each | $ - 0 | ||
| Crane Rental | Equipment | day | $ - 0 | ||
| Miscellaneous ducting, fittings | Materials | lump | $ - 0 | ||
| Miscellaneous electrical parts | Materials | lump | $ - 0 | ||
| Crane Rigging- straps/ slings | Materials | lump | $ - 0 | ||
| Total Materials and Equipment | $ - 0 | ||||
| Labor | |||||
| HVAC Technician | labor | hr | $ - 0 | ||
| Laborer | labor | hr | $ - 0 | ||
| Equipment Operator | labor | hr | $ - 0 | ||
| Elecrician | labor | hr | $ - 0 | ||
| Total Labor | $ - 0 | ||||
| Waste Management/ Disposal Costs | |||||
| Drain Freon from old units | waste mgt | each | $ - 0 | ||
| Disposal/ recycle old units | waste mgt | each | $ - 0 | ||
| Total Waste Management/Disposal | $ - 0 | ||||
| Total Price: | $ - 0 |