B08_Attachment_12-Title_24_Outdoor_Lighting.pdf
PDF 182 KB Posted
- Attached to
- GOGA CONSTRUCT STINSON LG TOWER & CAFE Federal contract opportunity
- Solicitation number
- 140P8526R0007
About this file
This is a California Energy Commission Certificate of Compliance for outdoor lighting demonstrating adherence to the 2022 California Building Energy Efficiency Standards (Title 24).
The project involves a new outdoor lighting system at NPS GOGA Stinson Beach in Stinson Beach, California (Climate Zone 3, Lighting Zone LZ-1: Low - Rural Areas). The illuminated hardscape area totals 582 square feet. The project consists of three downlight linear luminaires (D1/D1EM model), each rated at 18 watts, for a total design wattage of 54 watts. The lighting system demonstrates full compliance with mandatory requirements, including controls specifications and power allowance calculations. The total allowed lighting power is 172.57 watts (comprising 9.31 watts from area wattage allowance and 13.26 watts from linear wattage allowance, plus a 150-watt initial wattage allowance), which exceeds the actual design wattage of 54 watts. Controls compliance is achieved through an astronomical timer for shut-off control, with no motion sensor requirement due to each luminaire being rated at 40 watts or less. Shielding requirements do not apply as the luminaires are under 6,200 initial lumens. The documentation was prepared on February 20, 2024, by Brian Flynn of AE Design and requires submission of form NRCI-LTO-E (Certificate of Installation) and NRCA-LTO-02-A (Certificate of Acceptance for controls verification) to the building inspector.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Generated Date/Time: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101
Compliance ID: 177993-0224-0008 Report Generated: 2024-02-20 12:47:27
STATE OF CALIFORNIA
Outdoor Lighting CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-E
This document is used to demonstrate compliance with requirements in 110.9, 130.0, 130.2, 140.7, and 141.0(b)2L for outdoor lighting scopes using the prescriptive path for nonresidential and hotel/motel occupancies. It is also used to document compliance with requirements in 160.5, 170.2(e)6, 180.1(a) and 180.2(b)4Bv for outdoor lighting scopes using the prescriptive path for multifamily and mixed-use occupancies. Multifamily includes dormitory and senior living facilities.
Project Name: NPS GOGA Stinson Beach Report Page: (Page 1 of 7) Project Address: Date Prepared: 2024-02-20T15:47:25-05:00
A. GENERAL INFORMATION
01 Project Location (city) Stinson Beach
04 Total Illuminated Hardscape Area (ft2) 582 02 Climate Zone 3 03 Outdoor Lighting Zone per Title 24 Part 1 10.114 or as designated by Authority Having Jurisdiction (AHJ):
LZ-0: Very Low - Undeveloped Parkland LZ-2: Moderate - Urban Clusters LZ-4: High - Must be reviewed by CA Energy Commission for Approval LZ-1: Low - Rural Areas LZ-3: Moderately High - Urban Areas
05 Occupancy Types within Project
● All Other Occupancies ●
B. PROJECT SCOPE
This table includes outdoor lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in 140.7 / 170.2(e)6 or 141.0(b)2L / 180.2(b)4Bv for alterations.
My Project Consists of:
01 02 New Lighting System Must Comply with Allowances from 140.7 / 170.2(e)6 Altered Lighting System Is your alteration increasing the connected lighting load (Watts)? Yes No
03 04 05 % of Existing Luminaires Being Altered1 Sum Total of Luminaires Being Added or Altered Calculation Method
< 10% >= 10% and < 50% >= 50% Please proceed to Table F. Outdoor Lighting Fixture Schedule to define the project's luminaires.
1 FOOTNOTES: % of Existing Luminaires Being Altered = (Sum Total of Luminaires Being Added or Altered / Existing Luminaires within the Scope of the Permit Application) x 100.
STATE OF CALIFORNIA
Outdoor Lighting CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-E
Project Name: NPS GOGA Stinson Beach Report Page: (Page 2 of 7)
Date Prepared: 2024-02-20T15:47:25-05:00
Generated Date/Time: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101
Compliance ID: 177993-0224-0008 Report Generated: 2024-02-20 12:47:27
C. COMPLIANCE RESULTS
Results in this table are automatically calculated from data input and calculations in Tables F through N. Note: If any cell on this table says "COMPLIES with Exceptional Conditions" refer to Table D. Exceptional Conditions for guidance or see applicable Table referenced below.
Calculations of Total Allowed Lighting Power (Watts) 140.7 / 170.2(e)6 or 141.0(b)2L / 180.2(b)4Bv Compliance Results
OR
08 09 General
Hardscape Allowance 140.7(d)1 / 170.2(e)6 (See Table I)
Per Application 140.7(d)2 / 170.2(e)6
(See Table J)
Sales Frontage 140.7(d)2
(See Table K)
Ornamental 140.7(d)2 / 170.2(e)6
(See Table L)
Per Specific Area
140.7(d)2 / 170.2(e)6
(See Table M)
Existing Power
Allowance 141.0(b)2L / 180.2(b)4Bv (See Table N)
Total Allowed (Watts)
Total Actual (Watts) 07 must be >= 08
172.57 + --- + --- + --- + --- OR --- = 172.57 ≥ 54 COMPLIES
Shielding Compliance (See Table G for Details) N/A Controls Compliance (See Table H for Details) COMPLIES
D. EXCEPTIONAL CONDITIONS
This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form.
E. ADDITIONAL REMARKS
This table includes remarks made by the permit applicant to the Authority Having Jurisdiction.
CERTIFICATE OF COMPLIANCE NRCC-LTO-E
Project Name: NPS GOGA Stinson Beach Report Page: (Page 3 of 7)
Date Prepared: 2024-02-20T15:47:25-05:00
Generated Date/Time: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101
Compliance ID: 177993-0224-0008 Report Generated: 2024-02-20 12:47:27
F. OUTDOOR LIGHTING FIXTURE SCHEDULE
For new or altered lighting systems demonstrating compliance with 140.7 / 170.2(e)6 all new luminaires being installed and any existing luminaires remaining or being moved within the spaces covered by the permit application are included in the Table below. For altered lighting systems using the Existing Power method per 141.0(b)2L only new luminaires being installed and replacement luminaires being installed as part of the project scope are included (ie, existing luminaires remaining or existing luminaires being moved are not included).
Outdoor lighting attached to multifamily buildings and controlled from the inside of a dwelling unit are included in Table H. and are not included here. All other multifamily outdoor lighting is included here.
Designed Wattage:
01 02 03 04 05 06 07 08 09 10
Name or Item Tag Complete Luminaire Description Watts per luminaire1, 2 How is Wattage determined
Total Number Luminaires 2
Luminaire Status3
Excluded per 140.7(a) / 170.2(e)6A
Design Watts
Cutoff Req. > 6,200 initial lumen output 130.2(b) / 160.5(c)14
Field Inspector
Pass Fail
D1/D1EM Downlight Linear 18 Mfr. Spec 3 New 54 NA: < 6200 lumens
Total Design Watts: 54
* NOTES: Selections with a * require a note in the space below explaining how compliance is achieved.
EX: Luminaire is lighting a statue; EXCEPTION 2 to 130.2(b) 1FOOTNOTES: Authority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per 130.0(c) / 160.5(b) 2 For linear luminaires, wattage should be indicated as W/lf instead of Watts/luminaire. Total linear feet should be indicated in column 05 instead of number of luminaires.
3 Select "New" for new luminaires in a new outdoor lighting project, or for added luminaires in an alteration. Select "Altered" for replacement luminaires in an alteration. Select "Existing to Remain" for existing luminaires within the project scope that are not being altered and are remaining. Select "Existing Reinstalled" for existing luminaires which are being removed and reinstalled as part of the project scope.
4 Compliance with mandatory shielding requirements is required for luminaires with initial lumen output >= 6,200 unless exempted by 130.2(b)/ 160.5(c)
G. SHIELDING REQUIREMENTS (BUG)
This section does not apply to this project.
CERTIFICATE OF COMPLIANCE NRCC-LTO-E
Project Name: NPS GOGA Stinson Beach Report Page: (Page 4 of 7)
Date Prepared: 2024-02-20T15:47:25-05:00
Generated Date/Time: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101
Compliance ID: 177993-0224-0008 Report Generated: 2024-02-20 12:47:27
H. OUTDOOR LIGHTING CONTROLS
This table demonstrates compliance with controls requirements for all new or altered luminaires installed as part of the permit application. For alteration projects, luminaires which are existing to remain (ie untouched) and luminaires which are removed and reinstalled (wiring only) do not need to be included in this table even if they are within the spaces covered by the permit application.
Outdoor lighting for nonresidential buildings, parking garages and common service areas in multifamily buildings must be documented separately from outdoor lighting attached to multifamily buildings and controlled from the inside of a dwelling unit Mandatory Controls for Nonresidential Occupancies, Parking Garages & Common Areas in Multifamily Buildings
01 02 03 04 05
Area Description Shut-Off 130.2(c)1 / 160.5(c)
Auto-Schedule 130.2(c)2 / 160.5(c)
Motion Sensor 130.2(c)3 / 160.5(c)
Field Inspector
Pass Fail Deck: "D1/D1EM" Astronomical Timer Provided NA: Each Luminaire <= 40 Watts
1FOOTNOTE: Text has been abbreviated, please refer to Table 160.5-A to confirm compliance with the specific light source technologies listed.
2Authority having jurisdiction may ask for cutsheets or other documentation to confirm compliance of light source.
3Recessed luminaires marked for use in fire-rated installations, and recessed luminaires installed in non-insulated ceilings are excepted from ii and iii.
CERTIFICATE OF COMPLIANCE NRCC-LTO-E
Project Name: NPS GOGA Stinson Beach Report Page: (Page 5 of 7)
Date Prepared: 2024-02-20T15:47:25-05:00
Generated Date/Time: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101
Compliance ID: 177993-0224-0008 Report Generated: 2024-02-20 12:47:27
I. LIGHTING POWER ALLOWANCE (per 140.7 / 170.2(e)) This table includes areas using allowance calculations per 140.7 / 170.2(e). General Hardscape Allowance is per Table 140.7-A/Table 170.2-R while "Use it or lose it" Allowances are per Table 140.7-B /Table 170.2-S. Indicate which allowances are being used to expand sections for user input. Luminaires that qualify for one of the "Use it or lose it" allowances shall not qualify for another "Use it or lose it" allowance.
Outdoor lighting attached to multifamily buildings and controlled from the inside of a dwelling unit are included in Table H. and are not included here. All other multifamily outdoor lighting is included here.
General Hardscape Allowance
Table I (below)
"Use it or lose it" Allowance (select all that apply) (select all that apply)
Per Application Table J
Sales Frontage Table K
Ornamental Table L
Per Specific Area
Table M
Calculated General Hardscape Lighting Power Allowance per Table 140.7-A for Nonresidential & Hotel/Motel 02 03 04 05 06 07 08 09
Area Description Area Wattage Allowance (AWA) Linear Wattage Allowance (LWA) Total General
AWA + LWA
(Watts)
Illuminated Area (ft2)
Allowed Density (W/ft2)
Area Allowance (Watts)
Perimeter Length (lf)
Allowed Density (W/lf)
Linear Allowance (Watts)
Deck 582 0.016 9.31 102 0.13 13.26 22.57 Initial Wattage Allowance for Entire Site (Watts): 150
Instances of Initial Wattage Allowance (LZ 0 only)1
Total General Hardscape Allowance (Watts): 172.57
J. LIGHTING ALLOWANCE: PER APPLICATION
This section does not apply to this project.
K. LIGHTING ALLOWANCE: SALES FRONTAGE
This section does not apply to this project.
L. LIGHTING ALLOWANCE: ORNAMENTAL
This section does not apply to this project.
CERTIFICATE OF COMPLIANCE NRCC-LTO-E
Project Name: NPS GOGA Stinson Beach Report Page: (Page 6 of 7)
Date Prepared: 2024-02-20T15:47:25-05:00
Generated Date/Time: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101
Compliance ID: 177993-0224-0008 Report Generated: 2024-02-20 12:47:27
M. LIGHTING ALLOWANCE: PER SPECIFIC AREA
This section does not apply to this project.
N. EXISTING CONDITIONS POWER ALLOWANCE (alterations only) This section does not apply to this project.
O. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION
Selections have been made based on information provided in this document. If any selection has been changed by permit applicant, an explanation should be included in Table E.
Additional Remarks. These documents must be provided to the building inspector during construction and can be found online
Form/Title
NRCI-LTO-E - Must be submitted for all buildings
P. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE
Selections have been made based on information provided in this document. If any selection has been changed by permit applicant, an explanation should be included in Table E.
Additional Remarks. These documents must be provided to the building inspector during construction and must be completed through an Acceptance Test Technician Certification Provider (ATTCP). For more information visit: http://www.energy.ca.gov/title24/attcp/providers.html
Form/Title Systems/Spaces To Be Field Verified
NRCA-LTO-02-A - Must be submitted for all outdoor lighting controls except for alterations where controls are added to <= 20 luminaires. Deck: "D1/D1EM"
CERTIFICATE OF COMPLIANCE NRCC-LTO-E
Project Name: NPS GOGA Stinson Beach Report Page: (Page 7 of 7) Project Address: Date Prepared: 2024-02-20T15:47:25-05:00
Generated Date/Time: Documentation Software: Energy Code Ace
CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101
Compliance ID: 177993-0224-0008 Report Generated: 2024-02-20 12:47:27
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Brian Flynn
Documentation Author Signature:
Company:
AE Design
Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer)
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company: Date Signed:
Address: License:
City/State/Zip: Phone:
| Section A - A. GENERAL INFORMATION |
| Section B - B. PROJECT SCOPE |
| Section C - C. COMPLIANCE RESULTS |
| Section D - D. EXCEPTIONAL CONDITIONS |
| Section E - E. ADDITIONAL REMARKS |
| Section F - F. OUTDOOR LIGHTING FIXTURE SCHEDULE |
| Section G - G. SHIELDING REQUIREMENTS (BUG) |
| Section H - H. OUTDOOR LIGHTING CONTROLS |
| Section I - I. LIGHTING POWER ALLOWANCE (per 140.7 /170.2(e)) |
| Section J - J. LIGHTING ALLOWANCE: PER APPLICATION |
| Section K - K. LIGHTING ALLOWANCE: SALES FRONTAGE |
| Section L - L. LIGHTING ALLOWANCE: ORNAMENTAL |
| Section M - M. LIGHTING ALLOWANCE: PER SPECIFIC AREA |
| Section N - N. EXISTING CONDITIONS POWER ALLOWANCE (alterations only) |
| Documentation Author's Declaration Statement |
File details come from the government source that posted it. Updated .