This document is a Contract Price Schedule for Solicitation Number 140P8524R0002 for the replacement of a comfort station at Devils Postpile National Monument in California. The solicitation is set-aside for Small Business concerns, with a NAICS code of 236220 and a small business size standard of $45.0 million. The construction magnitude is between $1,000,000 and $5,000,000.
The Contract Price Schedule includes four base line items for the demolition of the existing comfort station, construction of a new prefabricated comfort station building, utility work, and site work. There are also three option line items for replacing the existing water line, tree removal, and building insulation. Offerors are required to submit pricing for the base line items and all option line items. All questions for this requirement must be submitted by April 10, 2024, and will be answered in a future amendment posted on www.SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| CONTRACT PRICE SCHEDULE | |||||
| SOLICITATION NUMBER: 140P8524R0002 | |||||
| PARK - PMIS: DEPO 230327 | |||||
| LOCATION: Devils Postpile National Monument, California | |||||
| PROJECT TITLE: Comfort Station Replacement | |||||
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | |||||
| In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation. | |||||
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 1 | Phase 1 Building and utilities demolition, associated backfilling, and flow and pressure test of existing 1" water line | 1 | LS | $0.00 | |
| 2 | Phase 2 pre-engineered restroom building including floor slab and foundation and all building plumbing and electrical work | 1 | LS | $0.00 | |
| 3 | Phase 2 utility work including trenching, new lines, and backfilling | 1 | LS | $0.00 | |
| 4 | Phase 2 sitework including grading and hardscape | 1 | LS | $0.00 | |
| TOTAL BASE PRICE - (CLINS 1 through 4) ------------------------------------------------------------- | $0.00 | ||||
| 5 | Option 1: Replace 1" existing water line with 3" line | 1 | LS | $0.00 | |
| 6 | Option2: Tree Removal | 1 | LS | $0.00 | |
| 7 | Option 3: Building Insulation | 1 | LS | $0.00 | |
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (CLINS 1 through 7) ----------------------- | $0.00 | ||||
| All measurement and payment information is included in the project specifications, Section 012700. |