This document appears to be a Questions and Answers (Q&A) file related to a federal contract opportunity for the replacement of a comfort station at Devils Postpile National Monument.

The key details are:

  • The original projected completion date for the Reds Meadow Road Project was Fall 2024, but is now estimated for Fall 2025 due to a short field season in 2023.
  • Tree removal shall include grinding the stumps.
  • A geotechnical report dated 6/9/09 will be included in the solicitation amendment attachments.
  • The existing unisex bathroom structure is 100% concrete.
  • Grout cove base, not tile, will be used on interior walls.
  • No hazardous materials report is available for the existing comfort station.
  • 4'x8' or 4'x10' fiber-cement sheets are approved as substitutes for 12"x12' planks.
  • No illuminated exit signs are required.
  • Wall-mounted occupancy sensors will be used for motion-controlled fixtures.
  • The electrical service upgrade will be 100 amps, provided by SoCal Edison, with no additional pre-solicitation specifications.
  • No water heater or hot water piping is required.

View the file

Other files for this federal contract opportunity

Other files attached to DEPO-REPLACE COMFORT STATION, newest first.
File Type Posted
B08_Attachment_4_Wage_Determination_CA20240018_5-24-2024_0010.pdf PDF
Sol_140P8524R0002_Amd_0010.pdf PDF
B08_Attachment_3_DEPO230327_CD100Dwg_R1_06_25_2024_0010.pdf PDF
B08_Updated_Solicitation_6-25-24_0010.pdf PDF
B08_Attachment_2_DEPO230327_CD100Specs_R3_06_25_2024_0010.pdf PDF
Sol_140P8524R0002_Amd_0009.pdf PDF
Sol_140P8524R0002_Amd_0008.pdf PDF
Sol_140P8524R0002_Amd_0007.pdf PDF
Sol_140P8524R0002_Amd_0006.pdf PDF
Sol_140P8524R0002_Amd_0005.pdf PDF
Sol_140P8524R0002_Amd_0004.pdf PDF
Sol_140P8524R0002_Amd_0003.pdf PDF
B08_Attachment_11_Electrical_Asbuilts_0003.pdf PDF
B08_Attachment_12_Geotech_Report_0003.pdf PDF
DEPO_Virtual_Site_Visit_Attendance_and_Notes_0002.docx DOCX document
Sol_140P8524R0002_Amd_0002.pdf PDF
Sol_140P8524R0002_Amd_0001.pdf PDF
B08_Attachment_3_Drawings.pdf PDF
B08_Attachment_4_Wage_Determination_CA20240018.pdf PDF
B08_Attachment_5_DEPO_Comfort_Station_Site_Video.mov MOV file
B08_Attachment_9_General_References.pdf PDF
B08_Attachment_8_Limitations_On_Subcontracting_Report.xlsx XLSX spreadsheet
B08_Attachment_2_Specs.pdf PDF
B08_Attachment_10_Past_Performance_Questionnaire.pdf PDF
Sol_140P8524R0002.pdf PDF
B08_Attachment_6_DEPO_New_Site_Pictures.pdf PDF
B08_Attachment_7_Existing_Comfort_Station_Pictures.pdf PDF
B08_Attachment_1_ContractPriceSchedule.xls XLS spreadsheet
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. What is the expected completion date of the Reds Meadow Road Project?

(Answer) Completion of FHWA contract for Reds Meadow Road work was originally proposed for the fall of 2024 but due to the short field season in 2023, project completion is currently estimated for the fall of 2025. The construction schedule and associated road closures have not been finalized for 2025.

2. For Tree removal, what is to be done with the stumps?

(Answer)Tree removal shall include grinding the stumps.

3. Is the Geotech report dated 06/09/09 available to the contractor and has it been made available to Romtec?

(Answer) The report will be included in the solicitation amendment attachments.

4. Is the existing all-gender structure constructed of wood framing or CMU block?

(Answer)The unisex (all-gender) bathroom is 100% concrete.

5. Is cove base tile intended to be installed on interior walls?

(Answer)At interior walls, provide a grout cove base. No tile base.

6. Is a hazardous materials report available for the existing comfort station?

(Answer)No.

7. Are 4’x8’ or 4’x10’ fiber-cement sheets an approved substitution for 12”x12’ planks?

(Answer)Yes.

8. Should there be illuminated exit signs?

(Answer)No illuminated exit signs.

9. Are motion-controlled fixtures to be wall-mounted occupancy sensor or integrated with the fixture?

(Answer)For motion-controlled fixtures, provide wall-mounted occupancy sensors.

10. This building calls for a 100 amp meter and new service from existing pull box. Is there a grounding detail for this work and meter enclosure spec available?

(Answer)No. The capacity is 100 amp. There are asbuilts included as amendment attachments for the electric upgrade at DEPO. No further pre-solicitation specifications for this.

11. Is the project site in jurisdiction of So Cal Edison or PG&E?

(Answer)SoCal Edison.

12. Please confirm that a water heater and hot water piping are not a requirement of this project.

(Answer) Confirmed. No water heater and no hot water piping.

13. Will water piping require insulation?

(Answer) No water piping insulation required.

File details come from the government source that posted it. Updated .