Sol_140P8524R0002_Amd_0010.pdf

PDF 140 KB Posted

Attached to
DEPO-REPLACE COMFORT STATION Federal contract opportunity
Solicitation number
140P8524R0002
Issued by
Department of the Interior National Park Service

About this file

This document is an amendment to a solicitation (RFP) for the demolition and construction of a new comfort station at Devils Postpile National Monument. The key changes in this amendment include:

  1. Updates to Sections L and M of the solicitation to revise the required information for the Project/Technical Approach and the evaluation criteria for the prefabricated building and supplier.

  2. Revisions to the technical specifications, including changes to the contractor's site access, pre-engineered restroom building requirements, and electrical work.

  3. Replacement of the attached drawings to shorten electrical conduit and wiring distances and update the electrical panel requirements.

  4. Inclusion of an updated Wage Determination.

The solicitation closing date and time remains 9 July, 2024, at 12:00pm PDT. This is a set-aside for Small Business concerns, under NAICS code 236220 with a $45.0 million size standard. The construction magnitude is estimated between $1,000,000 and $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to DEPO-REPLACE COMFORT STATION, newest first.
File Type Posted
B08_Updated_Solicitation_6-25-24_0010.pdf PDF
B08_Attachment_3_DEPO230327_CD100Dwg_R1_06_25_2024_0010.pdf PDF
B08_Attachment_4_Wage_Determination_CA20240018_5-24-2024_0010.pdf PDF
B08_Attachment_2_DEPO230327_CD100Specs_R3_06_25_2024_0010.pdf PDF
Sol_140P8524R0002_Amd_0009.pdf PDF
Sol_140P8524R0002_Amd_0008.pdf PDF
Sol_140P8524R0002_Amd_0007.pdf PDF
Sol_140P8524R0002_Amd_0006.pdf PDF
Sol_140P8524R0002_Amd_0005.pdf PDF
Sol_140P8524R0002_Amd_0004.pdf PDF
B08_Attachment_11_Electrical_Asbuilts_0003.pdf PDF
Questions_and_Answers_0003.docx DOCX document
Sol_140P8524R0002_Amd_0003.pdf PDF
B08_Attachment_12_Geotech_Report_0003.pdf PDF
Sol_140P8524R0002_Amd_0002.pdf PDF
DEPO_Virtual_Site_Visit_Attendance_and_Notes_0002.docx DOCX document
Sol_140P8524R0002_Amd_0001.pdf PDF
B08_Attachment_2_Specs.pdf PDF
B08_Attachment_10_Past_Performance_Questionnaire.pdf PDF
B08_Attachment_5_DEPO_Comfort_Station_Site_Video.mov MOV file
B08_Attachment_9_General_References.pdf PDF
B08_Attachment_8_Limitations_On_Subcontracting_Report.xlsx XLSX spreadsheet
B08_Attachment_3_Drawings.pdf PDF
B08_Attachment_4_Wage_Determination_CA20240018.pdf PDF
Sol_140P8524R0002.pdf PDF
B08_Attachment_6_DEPO_New_Site_Pictures.pdf PDF
B08_Attachment_7_Existing_Comfort_Station_Pictures.pdf PDF
B08_Attachment_1_ContractPriceSchedule.xls XLS spreadsheet
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8524R0002 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPO

San Francisco CA 94104 Suite 500 333 Bush Street

DOI, NPS, PWR - SF/SEA MABO

PPO

San Francisco CA 94104 Suite 500 333 Bush Street

NPS, PWR - SF/SEA MABO

06/26/20240010

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/20/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Eric Jordan

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P8524R0002 Amendment 0010

The purpose of this amendment is to include updated specifications/drawings and to update sections L & M of the solicitation, based on questions about the pre-engineered building and questions about the electrical requirements. Additionally, this amendment includes an updated Wage Determination. The following changes are hereby made:

A. Replace the solicitation with the attached revised solicitation. The following changes were made:

1. Solicitation Section L.1 a. 3. Has been updated to revise the required information to be submitted under Project/Technical Approach.

2. Solicitation Section L.1 a. 3.iii. Has been revised to update the performance period ending on 26 October 2026.

3. Solicitation Section M.1 a. 3. Evaluation Factor 2 – Technical Capabilities. Has been revised to address evaluation of the prefabricated building and the supplier.

B. Replace the attachment 2 of the solicitation, Specification, with the attached revised Specification. The following changes were made:

1. SECTION 01 11 00 SUMMARY OF WORK; 1.4 CONTRACTOR USE OF SITE; Item H.

a. Revises information on contractor access in coordination with the Reds Meadow Road Improvement Project.

2. SECTION 13 34 23 PRE-ENGINEERED RESTROOM BUILDING; 2.1 PRE-ENGINEERED

RESTROOM BUILDING;

a. Item C. Clarifies requirements for the pre-engineered restroom building.

3. SECTION 011100 SUMMARY OF WORK; 1.1 WORK COVERED BY CONTRACT DOCUMENTS;

a. The Work Consists of: Eliminated phasing of demolition and construction. Contractor will provide their approach to project execution for demolition and new construction with the submittal of the Non-Price portion of their proposal (3ii. Project Technical Approach; 3iii. Project Schedule).

4. SECTION 011100 SUMMARY OF WORK; 1.4 CONTRACTOR USE OF SITE;

a. 1.4B Construction Time Period: Revised construction schedule. Eliminated phasing of demolition and construction.

C. Replace the attachment 3 of the solicitation, Specification, with the attached revised drawings.

The following changes were made:

5. SHEET E1 Electrical Plan View:

140P8524R0002 Amendment 0010

a. Revised electrical alignment to shorten the distances of electrical conduit and wiring.

The routing goes more directly over to the incoming utility service. The contractor is to install new buried electrical conduit and a buried pull-box at locations indicated. A portion of existing conduit which crosses under the road will be re-used after the pull-box. The contractor will pull appropriate wiring through both the re-used conduit and new conduit to power the comfort station to become operational. 100 Amp panel is not required, 60 Amp panel using existing power will suffice.

6. SHEET A15 Schedules:

a. Revised electric hand dryers.

D. Replace attachment 4 of the solicitation, with the updated attached Wage Determination CA20240018 dated 24 May, 2024.

E. The solicitation closing date and time remains 9 July, 2024, at 12:00pm PDT.

File details come from the government source that posted it. Updated .