B08_Attachment_1_CHIC_240631_POR.pdf
PDF 7 MB Posted
- Attached to
- CHIC 240631 WTP AND MAINTENANCE BUILDING Federal contract opportunity
- Solicitation number
- 140P2025R0014
About this file
This Program of Requirements (POR) details a project by the National Park Service to replace critical utility systems at Chickasaw National Recreation Area in Oklahoma, involving two primary elements: a new water treatment plant and a new maintenance building. The water treatment facility will replace an existing 1970s plant, upgrading from 25,000 to 43,000 gallons per day capacity using ultrafiltration membrane technology. The project includes options for additional water treatment methods like granular activated carbon filtration and UV oxidation, a new 30,000-gallon water storage tank, and a new raw water supply pipe.
The 3,490 square-foot maintenance building will replace existing structures damaged by a 2024 tornado, housing functions like fire cache, carpentry, storage, and janitorial areas. The building will be a pre-engineered metal structure with specific requirements for HVAC, electrical, plumbing, and accessibility. The project is scheduled for completion in January 2025, with design-build procurement anticipated. Environmental compliance will be managed through a Categorical Exclusion process, with permits required from Oklahoma Department of Environmental Quality for water systems and potential coordination with US Fish and Wildlife Service for environmental considerations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2025R0014_Amd_0005.pdf | ||
| B09_Amendment_5_Questions_and_Answers_0005.pdf | ||
| Sol_140P2025R0014_Amd_0004.pdf | ||
| Sol_140P2025R0014_Amd_0003.pdf | ||
| B09_Amendment_3_Questions_and_Answers_0003.pdf | ||
| Sol_140P2025R0014_Amd_0002.pdf | ||
| B09_Amendment_2_Questions_and_Answers_0002.pdf | ||
| B09_Amendment_01_Questions_and_Answers_0001.pdf | ||
| Sol_140P2025R0014_Amd_0001.pdf | ||
| Sol_140P2025R0014.pdf | ||
| B08_Attachment_6_General_References.docx | DOCX document | |
| B08_Attachment_4_SF330.pdf | ||
| B08_Attachment_7_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Attachment_2_POR_Appendices.pdf | ||
| B08_Attachment_5__Past_Performance_Questionnaire.docx | DOCX document | |
| B08_Attachment_3_Wage_Determination.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 1 -
National Park Service Chickasaw National Recreation Area U.S. Department of the Interior January 2025
PROGRAM OF REQUIREMENTS TO CONSTRUCT WATER TREATMENT
PLANT AND MAINTENANCE BUILDING
Denver Service Center 12795 West Alameda Parkway
Denver, CO 80225
Water Treatment Facility
Maintenance Building
Chickasaw National Recreation Area - 2 -
PROJECT TEAM
CONTRACTUAL
Contracting Officer (CO): Timothy Burger Contract Specialist (CS): Jeanna Manseau
TECHNICAL
Project Manager (PM) and Contracting Officer’s Representative (COR): Kris Neset
Project Specialist (PS) and Alternate COR: Matthew Shafer
PARK
Chickasaw National Recreation Area Project Manager: Linda Richards
Chickasaw National Recreation Area Chief of Maintenance: Jeremie Johnson Chickasaw National Recreation Area Chief Ranger: Kane Seitz
REGION
Legacy Restoration Fund Program Coordinator: Michael Hogan
Cultural Resources Manager: Amy Cole
PROJECT TEAM
Otak: Project Management, Civil Engineering, Landscape Architecture, Architecture, Survey
Martin/Martin: Water Treatment Plant AE Design: Electrical Design
360 Engineering: Mechanical and Plumbing Engineering WSP: Geotechnical
Landmark Environmental, Inc.: Hazardous Materials ACC: Cost Estimation
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 3 -
TABLE OF CONTENTS
PROJECT TEAM
TABLE OF CONTENTS
DEFINITIONS
1.0 INTRODUCTION
2.0 EXECUTIVE SUMMARY
2.1 WATER TREATMENT FACILITY
2.2 MAINTENANCE FACILITY
3.0 PROJECT ANALYSIS
3.1 REPLACE WATER TREATMENT PLANT
3.1.1 PROJECT DESCRIPTION
3.1.2 ALTERNATIVES CONSIDERED
3.2 NEW MAINTENANCE BUILDING
3.3 EXISTING DOCUMENTATION
3.4 NPS CONTACTS
3.5 IMPLEMENTATION STRATEGY
3.6 DELIVERABLES
3.7 SCHEDULE
3.8 CODES AND STANDARDS
3.8.1 NATIONAL PARK SERVICE STANDARDS
3.8.2 CODE PATHWAYS
3.8.3 STRUCTURAL DESIGN STANDARDS
3.8.4 WATER TREATMENT CODES AND STANDARDS
3.8.5 STANDARDS
4.0 PROGRAM ANALYSIS
4.1 PROJECT ELEMENT 1 – WATER TREATMENT
4.1.1 OVERVIEW
4.1.2 SCHEDULE CONSTRAINTS
4.1.3 SITE PLANNING
4.1.4 SECURITY AND ACCESS
4.1.5 ARCHITECTURE
4.1.6 ACCESSIBILITY
4.1.7 FIRE SUPPRESSION AND FIRE ALARM SYSTEMS
4.1.8 PLUMBING
4.1.9 HVAC SYSTEMS
4.1.10 ELECTRICAL SYSTEMS
4.1.11 TELECOMMUNICATIONS AND DATA CONNECTION REQUIREMENTS
4.1.12 WATER TREATMENT EQUIPMENT
4.1.13 PROPOSED WATER STORAGE TANK
4.1.14 REJECT WATER FACILITY
Chickasaw National Recreation Area - 4 -
4.1.15 WATER SUPPLY LINES
4.1.16 GEOTECHNICAL
4.1.17 RENDERINGS OF WATER TREATMENT PLANT AREA
4.1.18 SITE PICTURES
4.2 PROJECT ELEMENT 2 – MAINTENANCE AREA
4.2.1 OVERVIEW
4.2.2 SCHEDULE CONSTRAINTS
4.2.3 SITE PLANNING
4.2.4 SECURITY AND ACCESS
4.2.5 UTILITY INFRASTRUCTURE
4.2.6 ARCHITECTURE
4.2.7 ACCESSIBILITY
4.2.8 FIRE SUPPRESSION AND FIRE ALARM SYSTEMS
4.2.9 PLUMBING
4.2.10 HVAC SYSTEMS
4.2.11 ELECTRICAL SYSTEMS
4.2.12 TELECOMMUNICATIONS AND DATA COMMUNICATIONS REQUIREMENTS
4.2.13 GEOTECHNICAL
4.2.14 SITE PICTURES
5.0 OPTIONS
5.1 WATER TREATMENT FACILITY OPTIONS
5.1.1 WATER TREATMENT OPTION 1 – GRANULAR ACTIVATED CARBON
5.1.2 WATER TREATMENT OPTION 2 – UV OXIDATION
5.1.3 WATER TREATMENT OPTION 3 – REPLACE RAW WATER SUPPLY PIPE
5.1.5 WATER TREATMENT OPTION 5 – GLASS LINED WATER STORAGE TANK
5.2 MAINTENANCE BUILDING OPTIONS
5.2.1 MAINTENANCE BUILDING OPTION 1
5.3 MISCELLANEOUS OPTIONS
6.0 GENERAL SITE ENVIRONMENTAL
7.0 COMPLIANCE
7.1 NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)
7.2 THE COUNCIL ON ENVIRONMENTAL QUALITY REGULATIONS (40 CFR 1500-
1508)
7.3 THE DEPARTMENT OF INTERIOR NEPA REGULATIONS (43 CFR SUBTITLE A,
PART 46)
7.4 NPS DIRECTOR’S ORDER #12, CONSERVATION PLANNING, ENVIRONMENTAL
IMPACT ANALYSIS, AND DECISION MAKING (DO-12), AND ACCOMPANYING DO-12
HANDBOOK (2015)
7.5 ENDANGERED SPECIES ACT (ESA)
7.6 CLEAN WATER ACT (CWA)
7.7 NATIVE AMERICAN GRAVES PROTECTION AND REPATRIATION ACT
7.8 ADDITIONAL COMPLIANCE NEEDS
8.0 PERMITTING
Chickasaw National Recreation Area - 5 -
LIST OF APPENDICES
APPENDIX A – Site Surveys APPENDIX B – Geotechnical Report APPENDIX C – Hazardous Materials Report APPENDIX D – Historical Records APPENDIX E – Natural Resource Records APPENDIX F – Cultural Resource Records APPENDIX G – Permit Assessment Form APPENDIX H – Code Summary APPENDIX I – Fire Suppression Waivers APPENDIX J – Clearance Status for Project Compliance APPENDIX K – Water Treatment Presentation APPENDIX L – Water Treatment Memo APPENDIX M – Site Exhibits – Water Treatment Facility APPENDIX N – Architectural Exhibits – Water Treatment Facility APPENDIX O – Water Treatment Technical Drawings APPENDIX P – Site Exhibits – Maintenance Area APPENDIX Q – Architectural Exhibits – Maintenance Area APPENDIX R – Division 1 Specifications APPENDIX S – Class B Cost Estimate APPENDIX T – Meeting Minutes APPENDIX U – Comment Response Spreadsheet
LIST OF TABLES
TABLE 1 – Deliverable Document Requirements TABLE 2 – Conformed Construction Documents TABLE 3 – Project Schedule
LIST OF FIGURES
FIGURE 1 – Program of Requirements Project Elements within Chickasaw National Recreation Area FIGURE 2 – Water Treatment Plant Location FIGURE 3 – Water Treatment Plant Site Study FIGURE 4 – Phase 1 Diagram FIGURE 5 – Phase 2 Diagram FIGURE 6 – Phase 3 Diagram FIGURE 7 – Water Treatment Building Phasing Diagram FIGURE 8 – Water Treatment Plant Conceptual Elevations and Plans FIGURE 9 – Water Treatment Building Accessibility Plan FIGURE 10 – WTP Improvements One-Line Diagram FIGURE 11 – WTP Equipment Layout Diagram FIGURE 12 – Enlargement of the Water Treatment Plant
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 6 -
FIGURE 13 – View to the Water Treatment Plant from dock at The Point boat ramp FIGURE 14 – Enlargement showing the Water Treatment Plant painted: Pantone 5763 C FIGURE 15 – Enlargement showing the Water Treatment Plant painted: Pantone 5743 C FIGURE 16 – Maintenance Area Location FIGURE 17 – Maintenance Area Site Study FIGURE 17 – Maintenance Area Site Study FIGURE 19 – Covered parking / storage area between buildings to be retained FIGURE 20 – Maintenance Building Floorplan FIGURE 21 – Maintenance Area Building Elevations FIGURE 22 – Maintenance Building Accessibility Plan
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 7 -
DEFINITIONS
ABAAS Architectural Barriers Act Accessibility Standards AE Architectural/Engineering AFF Above Finished Floor (elevation) ANSI American National Standards Institute AWWA American Water Works Association BMP Best Management Practice CFM Cubic feet per min CFR Code of Federal Regulations CHIC Chickasaw National Recreation Area CO Contracting Officer COR Contracting Officer’s Representative CS Contract Specialist CSI Construction Specifications Institute DB Design-Build DBE Design-Build Entity DOC Dissolved Organic Carbon DO-12 Director’s Order #12 DSC Denver Service Center of the National Park Service EPA Environmental Protection Agency ESA Endangered Species Act GAC Granular Activated Carbon GPR Ground Penetrating Radar HVAC Heating, Ventilation, and Air Conditioning HVLS High Velocity Low Speed IBC International Building Code IEBC International Existing Building Code IECC International Energy Conservation Code IFC International Fire Code IFGC International Fuel Gas Code IMC International Mechanical Code IPC International Plumbing Code MCE Maximum Considered Earthquake MCL Maximum Contaminant Level METF Maximum Extent Technically Feasible MPH Miles per hour NEPA National Environmental Policy Act NHL National Historic Landmark
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 8 -
NPS National Park Service NSF National Sanitation Foundation NTP Notice To Proceed OAC Oklahoma Administrative Code OKDEQ Oklahoma Department of Environmental Quality OPDES Oklahoma Pollutant Discharge Elimination System PAF Permit Assessment Form PCF Pounds per cubic foot PEMB Pre-Engineered Metal Building PM Project Manager POR Program of Requirements PS Project Specialist PSF Pounds per square foot PTAC Packaged Terminal Air Conditioning S1 the mapped MCE spectral response acceleration parameter at 1-second SCADA Supervisory Control and Data Acquisition Sds the design spectral acceleration parameter at short periods SF Square foot Ss the mapped MCE spectral response acceleration parameter at short periods SWPPP Stormwater Pollution Prevention Plan TOC Total Organic Carbon UF Ultrafiltration UL Underwriters Laboratories UV Ultraviolet WTP Water Treatment Plant
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 9 -
1.0 INTRODUCTION
Chickasaw National Recreation Area (CHIC), located near Sulphur, Oklahoma in Murray County, lies in the foothills of the Arbuckle Mountains. CHIC is situated between the Lake of the Arbuckles and the Platt Historic District and encompasses approximately 10,000 acres. The park is composed of lakes and partially forested rolling hills, and is named to honor the Chickasaw Indian Nation, who were relocated to this area from the Southeastern United States during the 1830s. Numerous recreation and educational opportunities exist throughout the park. The 2024 Sulphur tornado damaged several areas of the park, requiring various rehabilitation efforts throughout the park.
This document is the Program of Requirements (POR) to construct a new water treatment plant and maintenance building within CHIC. It is intended to be a comprehensive requirements package that clearly communicates the required work necessary to complete the construction of the Chickasaw National Recreation Area Water Treatment Plant and Maintenance Area. This POR provides information about the various items relevant to both the water treatment plant (Project Element 1) and the new maintenance building (Project Element 2), including information related to permitting and compliance
Figure 1: Program of Requirements Project Elements within Chickasaw National Recreation Area
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 10 -requirements. This POR document supersedes and takes precedence over all Division One specifications (Appendix R). Environmental and cultural considerations for the improvements are reviewed and assessed to establish likely compliance and permitting needs, based on a general understanding of the project implementation to identify changes that trigger additional compliance and permitting needs.
Compliance is required in accordance with federals programs, such as the National Environmental Policy Act (NEPA), the National Historic Preservation Act of 1966, as amended (NHPA), and the Archaeological Resource Protection Act of 1979 (ARPA).
Chickasaw National Recreation Area - 11 -
2.0 EXECUTIVE SUMMARY
2.1 WATER TREATMENT FACILITY
The existing water treatment plant (WTP) is north of the Buckhorn campground and services that campground, boat ramp, and pavilion. The WTP also serves the Point boat ramp and campground via a pipe crossing underneath the lake. The WTP was constructed in the 1970s and cannot reliably provide treated water to the area served. Several maintenance issues are noted, including difficulty repairing or replacing aging appurtenances, and the need for manual operation due to non-functional automatic controls which were damaged by lightning and water leaks.
The plant was originally designed to produce 25,000 gallons per day (gpd) of potable water. The new design capacity will be 43,000 gallons per day. The existing system contains aged components which have become increasingly difficult to repair or replace as modern components are no longer compatible with the existing system. The automatic operational controls have failed or are failing, leading to higher operational costs because the water operator is required to remain on-site while the plant cycles through its operations. Water from the county is purchased at various times to supplement the volume needed for the campground, increasing overall utility costs. Municipal water is undesirable because it conflicts with the original mission of the land donation establishing a public park. Replacing the plant will greatly reduce the costs associated with manual operation, loss of water during certain processes, and purchases of water from outside sources when the plant is not able to meet water demands. A new WTP helps the Park address significantly deferred maintenance and provides new facilities with low life cycle costs.
Construction of the new plant will be phased to maintain operational use during construction, minimize impacts of park operations, and maintain functionality during peak visitor seasons, with the existing facility remaining operational during the process. A 30-foot buffer zone around the water tanks and building is established for fire protection. Special care should be taken to minimize the visibility of the water tanks from other park locations by utilizing paint color and preserving trees.
2.2 MAINTENANCE FACILITY
Located off Highway 177, the park’s maintenance area lies within the boundary of a National Historic Landmark (NHL) district and is subject to Section 106 compliance. A new maintenance building is proposed to replace the carpentry shop and storage buildings and will house a fire cache along with janitorial storage. The new 3,490 square-foot facility connects the recently rebuilt Roads and Trails building via a common area with restrooms and showers, ensuring accessibility with stairs and a lift. The design prioritizes emergency response, supply distribution, staff comfort, deferred maintenance and low life cycle costs for new facilities. Fire truck bays are positioned for easy access, and the central area is
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 12 -designated for maintenance supplies. The building will be constructed of durable materials for longevity and ease of maintenance.
The 2024 EF-3 Sulphur tornado damaged structures and vegetation within the existing maintenance area. All damaged structures and trees shall be removed and/or restored by others prior to the start of construction of the new maintenance building. After the tornado, flooding was identified in the center of the existing lower maintenance area, and the proposed building is located on higher ground than the area that experienced flooding. Furthermore, the maintenance area is critical for day-to-day park functions, and the design-build entity (DBE) should aim to minimize operational disruptions throughout construction.
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 13 -
3.0 PROJECT ANALYSIS
3.1 REPLACE WATER TREATMENT PLANT
3.1.1 PROJECT DESCRIPTION
This project replaces the existing water treatment plant (WTP), constructed in the 1970s. The existing WTP cannot reliably provide treated water to the served area. Several maintenance issues are noted, including difficulty repairing or replacing aging appurtenances, non-functional automatic controls and water leaks. The water treatment plant is located north of the Buckhorn campground and services the campground, boat ramp, and pavilion as well as the Point boat ramp and campground via a pipe crossing underneath the lake.
The existing plant is designed to produce 25,000 gallons per day (gpd) of potable water. The new plant’s design capacity is 43,000 gallons per day (gpd). Water from Murray County is purchased at various times to supplement water needs in the campgrounds, which has increased overall utility costs. Replacing the plant greatly reduces the costs associated with manual operation, loss of water during certain processes, and purchases of water from outside sources when the facility is not able to meet water demands.
The existing water treatment plant equipment and building are to be removed once the new water treatment facility is operational. One existing welded steel water tank is removed and replaced with a new bolted steel water storage tank on-site. Tree removal and minor grading are required at the new building site.
3.1.2 ALTERNATIVES CONSIDERED
Three alternative water treatment methods for the new WTP were presented and discussed with NPS and the project team. These alternatives are:
Alternative #1: Ultrafiltration (UF) and Granular Activated Carbon (GAC) Filters:
UF membrane filters fur turbidity, bacteria, and most viruses GAC filters to be included as an option or could be added as needed in the future for mitigation and formation of disinfection by-products (DBPs) Disinfection treatment by dosing liquid sodium hypochlorite and contact-time provided in the exterior on-site water storage tanks Remove/replace existing 30,000-gallon welded steel storage tank with a new 30,000-gallon bolted steel water storage tank at the site Provide new building for water treatment equipment
Alternative #2: Direct Rapid Sand Filtration (RSF):
Direct RSF eliminates the flocculation/sedimentation tank(s) included in a more conventional RSF treatment system
Chickasaw National Recreation Area - 14 -
Polymer coagulant is dosed, and a static mixer used for mixing prior to water entering the rapid sand filter
Dual media filtration was recommended using silica sand and anthracite GAC to be included as an option or could be added as needed in the future either directly in the RSF or in a separate filter Disinfection treatment by dosing liquid sodium hypochlorite and contact-time provided in a 10,000-gallon clear well storage tank in the treatment building Remove/replace existing 30,000-gallon welded steel storage tank with a new 30,000-gallon bolted steel water storage tank at the site Provide new building for water treatment equipment
Alternative #3: Conventional RSF:
Largely the same as Alternative #2 but includes a flocculation/sedimentation basin prior to the sand filters and matches the existing water treatment process
Includes some process efficiency improvements to the existing treatment plant including tube settlers to increase efficiency in the sedimentation basin
GAC to be included as an option or could be added as needed in the future either directly in the RSF or in a separate filter
Disinfection treatment by dosing liquid sodium hypochlorite and contact-time provided in a 10,000-gallon clear well storage tank in the treatment building
Remove/replace existing 30,000-gallon welded steel storage tank with a new 30,000-gallon bolted steel water storage tank at the site
Provide new building for water treatment equipment
In addition to the water treatment process alternatives discussed above, options for handling wastewater created by the treatment process were also presented and discussed. Options included evaporative lagoons, discharging lagoons, drying beds, and internal recycling of backwash/reject water wastewater. Discussion also included constructing a lift station to connect to the existing force main between the existing Lift Station #3 and Lift Station #6 in the Park’s wastewater collection system.
Based on discussions, Alternative #1 is the preferred option, along with the use of a connection to the sanitary sewer collection system for wastewater. Further details on the alternatives are found in Appendices K, L, M, N and O.
3.2 NEW MAINTENANCE BUILDING
This project also includes a new maintenance building to replace the carpentry shop and storage buildings. The new maintenance building is anticipated to be a 3,490 square feet high-bay steel frame metal building with a high strength concrete slab floor. Limited windows are anticipated to provide natural daylighting, while avoiding excessive heat buildup from sunlight. Roll up doors are sized for
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 15 -
Wildland Fire Vehicles, maintenance vehicles and delivery, and custodial supply storage functions. A 20-foot concrete apron at the front of the building with a shade canopy is to facilitate exterior work. The clear height is 15-foot minimum to the bottom of the shade canopy structure. Interior walls are to be finished in light paint for reflectivity. Perimeter walls of conditioned/heated spaces are to have R-15 insulation based on climate zone 3 in the IECC. Sanitary sewer lift stations are sized to serve the new maintenance building and existing buildings with sanitary system at the lower west end of the maintenance area. The following necessary elements for this new building include:
Site preparation including demolition of existing structures New maintenance building functions:
Fire cache Carpentry Storage, 400 sf Office space, 64 sf Single use bathroom with shower Paint booth
Two-story building or one-story building Eye wash station/safety station Clothing washer and dryer and hot water heater Covered/enclosed wood storage space Exterior covered storage Electrical:
The underground OG&E electrical service to the existing buildings anticipated to be demolished shall be upgraded to establish a new larger 120/240V, 1-phase electric service for the new maintenance facility and proposed lift station
Coordination with OG&E will be required to confirm the full extent of utility rework A new exterior generator and associated power distribution equipment is anticipated to backup desired optional standby loads Mechanical and plumbing:
Plumbing scope will include a restroom with a shower, washer/dryer units, a combination emergency eyewash/shower, and a compressed air system The building will include a paint shop with ventilation and exhaust Woodworking sections shall include dust collection system for equipment Heating and cooling in open shop and storage areas High volume low speed fans for passive cooling Fan-forced unit heaters
Heat pumps to provide heating and cooling for the office spaces
Chickasaw National Recreation Area - 16 -
3.3 EXISTING DOCUMENTATION
Site investigations include visual observations, aerial photography and survey, and topographic and utility surveys. The geotechnical reports are included in Appendix B. Existing historical records are included in Appendix D, and Appendix C includes the Hazardous Materials Investigation. Natural and cultural resource information identify the requirements of this POR and are included in Appendices E and F, respectively. Natural and cultural resources are further described in the Compliance Section of this POR. Additional reports and documentation are available at the request of the NPS.
All existing documentation will be provided to the selected bidder.
3.4 NPS CONTACTS
Contractual:
Contracting Officer (CO): Timothy Burger, 720-688-9530, timothy_burger@nps.gov
Contract Specialist (CS): Jeanna Manseau, 720-503-4666, jeanna_manseau@nps.gov
Technical:
Project Manager (PM) and Contracting Officer’s Representative (COR): Kris Neset, 720-814- 7973, kris_neset@nps.gov
Project Specialist (PS) and Alternate COR: Matthew Shafer, 720-483-0684, matthew_shafer@nps.gov
Park:
Chickasaw National Recreation Area (NRA), Project Manager, Linda Richards, 580-622- 7253, linda_richards@nps.gov
Chickasaw NRA, Chief of Maintenance, Jeremie Johnston, 580-618-2144, jeremie_johnston@nps.gov
Chickasaw NRA, Chief Ranger (for security needs), Kane Seitz, 580-622-7241, kane_seitz@nps.gov
3.5 IMPLEMENTATION STRATEGY
The delivery model for this project is expected to be Best Value Design-Build / Fixed Price procurement.
This requires the DBE to provide a price and technical proposal for the improvements. The technical proposal shall include the scope of services for design by licensed engineering and environmental professionals in the State of Oklahoma.
mailto:timothy_burger@nps.gov mailto:jeanna_manseau@nps.gov mailto:kris_neset@nps.gov mailto:matthew_shafer@nps.gov mailto:linda_richards@nps.gov mailto:jeremie_johnston@nps.gov mailto:kane_seitz@nps.gov
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 17 -
All standard practices for design and construction shall comply with the requirements of federal projects as outlined by the NPS Denver Service Center (DSC) at the following site:
http://www.nps.gov/orgs/1804/dscdandc.htm
The DBE shall conduct bi-weekly progress update meetings to the NPS project team from the time of design Notice to Proceed through delivery of the Construction Documents. The DBE shall conduct weekly progress update meetings to the NPS team from construction Notice to Proceed through to final completion. The DBE is required to prepare the agendas, the minutes, and lead these meetings.
The DBE shall coordinate with the NPS to identify temporary needs during construction, as all areas used to satisfy temporary needs shall be approved by NPS prior to implementation. Such needs may include access routes, vehicular and pedestrian traffic management, limits of work, storage, staging, limits of trenching side slopes, and stockpile (refuse and demolition materials included) locations. These shall be defined during the design process for review and approval by NPS. If additional storage, staging, and stockpile areas are required beyond that allowed by NPS, the DBE shall locate and maintain an off-site location(s) at no additional cost to NPS. The DBE shall not assume that temporary utility hook-ups to support construction will be allowed, including for water, electric, and communications. New utility service cutovers shall be coordinated with NPS and specified in design documents to avoid utility disruptions to adjacent park facilities.
The DBE is responsible for preparing and providing NPS information and project documents required for legally mandated compliance processes to protect environmental and cultural resources. Compliance is required for any survey or field investigation work during design as well as for the final construction project, as further discussed in later sections. Coordination with the NPS compliance team shall be initiated as soon as possible to determine data needs and compliance schedules to minimize impacts on the design and construction schedules. No work at the site shall begin prior to receiving compliance approvals. Construction Notice to Proceed (NTP) will not be issued until compliance is completed for both design and construction. NPS is committed to providing collaborative assistance throughout the compliance process.
In addition, the DBE is responsible for determining applicable permits and obtaining them before the start of any work at the site.
The DBE is responsible for scheduling and phasing the construction of the new WTP and the demolition of the existing WTP to provide potable water to the facilities served throughout construction. The new water treatment equipment shall be located in a new building adjacent to the existing water treatment building to maintain the existing treatment while the proposed is under construction. DBE is responsible for providing any temporary treatment equipment and/or storage as needed to maintain the minimum potable water production and storage capacity described in this POR.
http://www.nps.gov/orgs/1804/dscdandc.htm
Chickasaw National Recreation Area - 18 -
The DBE will be responsible for all inspections, testing, and certification requirements. All results and documentation from these activities shall be submitted to the CO. Any required manufacturer’s certifications for equipment specified by the DBE must be completed and submitted to the CO. The water treatment plant will require specific commissioning as defined by the CO. The DBE will train NPS staff on the operation of all equipment installed as a part of this work. The work areas and buildings may require approval of the Authority Having Jurisdiction, a Building Code Official, or the Fire Code Official.
The DBE shall complete the submittal list, O&M Manual, and waste management worksheet. The COR shall provide a final punch list, and a certification of occupancy upon completion of the work.
This POR document outlines the requirements to be followed in order to complete the project. The Division 1 Specifications and other appendices provide additional requirements, guidance, and context.
If there are any conflicts between this POR document and the Division 01 specifications, the POR shall take precedence.
The site exhibits in this POR were developed with NPS to confirm a feasible approach to meeting park needs and design criteria at the sites and to assist DBE bidders in developing their proposal.
3.6 DELIVERABLES
The DBE is required to submit the following deliverables for NPS Review:
50% DB Design Development Documents
Draft Design Build (DB) Design Development Drawings Draft Division 1 Construction Specifications (Construction Specifications Institute (CSI) Master Format
04 Edition). The DBE shall utilize and modify DSC Division 1 Construction Specifications templates (as included in Appendix R)
Draft Division 2 through 49 Construction Specifications (Construction Specifications Institute (CSI) Master Format 04 Edition)
Initial design calculations for utilities, including a model of the water system Initial design calculations of the structural systems Initial Statement of Structural Tests and Special Inspections Information and documentation required for NPS to submit Categorical Exclusion, Endangered
Species Act (ESA) consultant document, and Wetland / Waterway Identification and Delineation Updated Permit Assessment Form (PAF). The DBE shall utilize and modify the draft template included in Appendix G Checklists for internal review of drawings, specifications, and calculations. Required documents shall go through a Quality Control (QC) review for each submission to confirm required documents are included and complete per contract requirements. NPS requires documentation and submittal of QC work performed
Chickasaw National Recreation Area - 19 -
100% DB Design Development Documents
100% DB Design Development Drawings Updated Division 1 Construction Specifications (Construction Specifications Institute (CSI) Master
Format 04 Edition) Updated Divisions 2 through 49 Construction Specifications (Construction Specifications Institute (CSI)
Master Format 04 Edition) Updated design calculations of utility designs, including model of the water system Updated design calculations of the structural systems Updated Statement of Structural Tests and Special Inspections Updates to information and documentation required for compliance permitting, as directed by NPS Updated Permit Assessment Form (PAF) and / or Permit Tracking List Draft permit applications, if not previously submitted Checklists for internal review of drawings, specifications, and calculations. Required documents shall go through a Quality Control (QC) review for each submission to confirm required documents are included and complete per contract requirements. NPS requires documentation and submittal of QC work performed NPS Review form with responses to 50% DB Design Development Documents review comments
100% DB Construction Documents 100% DB Construction Drawings Geographic Information Systems (GIS) Shapefiles of project utilities Final Division 1 Construction Specifications Final Division 2 through 49 Construction Specifications Final design calculations of the water, sewer, and storm systems and model of the water system Final design calculations of the structural systems Final Statement of Structural Tests and Special Inspections All remaining required compliance and permitting documentation for approvals Updated Permit Assessment Form (PAF) and / or Permit Tracking List Finalized permit applications, if not previously submitted Checklists for internal review of drawings, specifications, and calculations. Required documents shall go through a Quality Control (QC) review for each submission to confirm required documents are included and complete per contract requirements. NPS requires documentation and submittal of QC work performed
NPS Review form with responses to 100% DB Design Development Documents review comments, including from compliance and permitting
Final DB Construction Documents (CD)
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 20 -
Upon final approval of 100% DB Construction Documents and once all compliance tasks have been complete, submit Complete Signed and Stamped DB Construction Documents per Table 1 for construction, NPS archiving, and general use. Documents shall be signed and sealed by a Professional Engineer licensed in the state of Oklahoma. For format and media submission requirements, see Design Deliverables – Content and Format Requirements DB Hard Copy and Electronic Submittal Requirements.
The DBE shall provide all supplemental documentation and design reports including but not limited to:
permits, survey, and geotechnical reports, including soil testing reports and drilling logs.
Table 1: Deliverable Document Requirements
FINAL CONSTRUCTION DOCUMENTS (CD) FILE FORMATS
Final Construction Drawings PDF & CAD/BIM
Full Sized Hard Copy to Project Manager
Final Division 1 Specifications PDF & Microsoft Word Final Divisions 2 through 49 Construction Specifications PDF & Microsoft Word Final Statement of Structural Tests and Special Inspections PDF & Microsoft Word Final Proft Calculator PDF & Microsoft Excel Construction Inspection Checklist PDF & Microsoft Word Final Contract Price Schedule with cost fields blank PDF & Microsoft Excel Final Contract Price Schedule with cost fields filled in based on Final Class A MasterFormat Construction Cost Estimate
PDF & Microsoft Excel
Permits PDF & Microsoft Excel Final Submittal List PDF & Microsoft Excel Final Closeout and Operation and Maintenance (O&M) Requirements PDF & Microsoft Excel Final NPS Constructability Checklist PDF & Microsoft Excel Final Class A MasterFormat Construction Cost Estimate PDF & Microsoft Excel Final Design Calculations PDF Supplemental Design Reports PDF Checklists for internal review of drawings, specifications, calculations, and cost estimates
PDF & Microsoft Excel
NPS DSC QA Review Comments form with responses to 100% Complete CD review comments
PDF & Microsoft Excel
Chickasaw National Recreation Area - 21 -
Table 2: Conformed Construction Documents
CONFORMED CONSTRUCTION DOCUMENTS FILE FORMATS
Conformed Construction Drawings PDF & CAD/BIM
Full Size and Half Size Hard Copy to Project
Manager Conformed Construction Specifications PDF Updated Submittal Register PDF and Submittal
Register Format Updated Basis of Design PDF Updated Design Calculations PDF
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 22 -
3.7 SCHEDULE
The DBE shall establish a phasing plan and a detailed design and construction schedule, including permitting and compliance timelines in alignment with the requirements set forth in this POR document and the appendices. The DBE is expected to phase the work for each site to ensure efficient and timely mobilization of disciplines. Refer to the diagram below showing phases and approximate timelines for each site. Peak visitation and water use at Buckhorn and The Point campgrounds shall be considered when phasing the WTP. The construction schedule shall ensure the existing WTP, or the new WTP, is fully operational during the peak visitation periods defined by the park.
Table 3: Project Schedules
Water Treatment Plant (including all Options)
Phases 3-Month Intervals
Design
Permitting
Compliance
Construction
Maintenance Building (including all Options)
Phases 3-Month Intervals
Design
Permitting
Compliance
Construction
Design Process Milestones
50% Design Development – no more than 60 calendar days from contract award, 30 day NPS review
100% Design Development – no more than 60 calendar days after receiving review comments, 30 day review
100% Construction Documents – no more than 60 calendar days after receiving comments, 30 day review
Final Construction Documents – no more than 30 calendar days after receiving comments, 21 day review
Conformed Construction Documents – no more than 14 calendar days after receiving comments
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 23 -
3.8 CODES AND STANDARDS
The requirements for this work include, but are not limited to, the following list of the codes and standards that the DBE shall adhere to for this project. Unless otherwise specified by the NPS, the DBE shall comply with the latest version of each code or standard. Additional information about project requirements can be found at the Workflows website for the Denver Service Center of the National Park Service.
3.8.1 NATIONAL PARK SERVICE STANDARDS
• NPS Sustainability Design Standards
• NPS 7 Principles of Universal Design
• NPS Climate Change and Natural Hazards, Addressing Climate Change and Natural Hazards Level
3 Handbook January 2015
• NPS: Electronic Drawing Standards
• NPS Reference Manual #58: Structural Fire Management
3.8.2 CODE PATHWAYS
• International Building Code (2024 IBC)
• International Existing Building Code (2024 IEBC)
• International Plumbing Code (2024 IPC)
• National Electric Code (2023 NEC)
• International Fuel Gas Code (2024 IFGC)
• International Energy Conservation Code (2021 IECC)
• International Fire Code (2024 IFC)
• Architectural Barriers Act Accessibility Standards (2015 ABAAS)
• EPA Government Standards Manual
3.8.3 STRUCTURAL DESIGN STANDARDS
• 2022 ASCE 7 (American Society of Civil Engineers, Minimum Design Loads and Associated Criteria for Buildings and Other Structures)
• 2022 RP 10 (NISTIR 8458e2022 Standards of Seismic Safety for Existing Federally Owned and Leased Buildings, ICSSC Recommended Practice 10): Only applies to existing buildings being rehabilitated
• ACI 318-19 (American Concrete Institute, Building Code Requirements for Structural Concrete)
• AISC 360-22 (American Institute of Steel Construction, Specification for Structural Steel
Buildings)
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 24 -
3.8.4 WATER TREATMENT CODES AND STANDARDS
NATIONAL PARK SERVICE:
• Reference Manual 83A: Public Health Protection and Disease Prevention
• Department of the Interior: Automated Controls Policy
OKLAHOMA ADMINISTRATIVE CODE:
Title 252 Department of Environmental Quality:
• Chapter 606 Oklahoma Pollutant Discharge Elimination System (OPDES) Standards
• Chapter 624 Minor Public Water Supply Systems
• Chapter 626 Public Water Supply Construction Standards
• Chapter 631 Public Water Supply Operation
• Chapter 656 Water Pollution Control Facility Construction Standards
• Chapter 710 Waterworks and Wastewater Works Operator Certification
AMERICAN WATER WORKS ASSOCIATION (AWWA):
• B112: Microfiltration and Ultrafiltration Membrane Systems
• B300: Hypochlorites
• B500 Series: Scale and Corrosion Control
• C652: Disinfection of Water-Storage Facilities
• C653: Disinfection of Water Treatment Plants
• D103: Factory-Coated Bolted Carbon Steel Tanks for Water Storage
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)/NATIONAL SANITATION FOUNDATION (NSF):
• ANSI/NSF 14: Plastic Pipes and Fittings
• ANSI/NSF 60: Water Treatment Chemicals
• ANSI/NSF 61: Drinking Water System Components – Health Effects
• ANSI/NSF 372: Drinking Water System Components – Lead Content
3.8.5 STANDARDS
GENERAL:
• American Society for Testing and Materials (ASTM)
• American National Standards Institute (ANSI)
• National Emergency Management Association (NEMA)
• American Society of Civil Engineers (ASCE)
• Underwriters Laboratories (UL)
• Occupational Safety and Health Administration (OSHA)
• International Code Council (ICC)
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 25 -
• American Welding Society (AWS)
• Manufacturers Standardization Society (MSS)
• International Association of Plumbing and Mechanical Officials (IAPMO)
• Office of Statewide Health Planning and Development (OSHPD)
PLUMBING:
• American Water Works Association (AWWA)
• U.S. Safe Drinking Water Act (SDWA)
• National Science Foundation (NSF)
• American Society of Sanitary Engineering (ASSE)
• Cast Iron Soil Pipe Institute (CISPI)
• Plumbing & Drainage Institute (PDI)
• Plumbing Fixtures: All plumbing fixtures and fittings shall be low-flow, water conserving, conforming to the requirements stated in the 1992 Energy Policy Act.
• Water Pressure: Pressure reducing valves shall be provided as necessary to limit water pressure in buildings to 80 per square inch gauge (psig) maximum. Booster pumps shall be provided as necessary to maintain a minimum of 25 psig at the furthest plumbing fixture at design flow rate conditions.
HVAC SYSTEMS:
• American Society of Mechanical Engineers (ASME)
• American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)
• Air Conditioning, Heating, & Refrigeration Institute (AHRI)
• Sheet Metal and Air Conditioning Contractors' National Association (SMACNA)
• Air Movement and Control Association International (AMCA)
• Air-Conditioning and Refrigeration Institute (ARI)
ELECTRICAL SYSTEMS:
• Illuminating Engineering Society (IES)
• National Fire Protection Association (NFPA)
SITE AND TRANSPORTATION:
• Compaction of all backfill shall meet the geotechnical recommendations and requirements established by the DBE engineer of record. Compaction testing requirements shall be included in the construction specifications prepared by the DBE.
• AASHTO (American Association of State Highway and Transportation Officials) o AASHTO "Green Book" - A Policy on Geometric Design of Highways and Streets 2011
• ABA (Architectural Barriers Act) Accessibility Standards
• ACOE (Army Corp of Engineers)
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 26 -
• AI (Asphalt Institute)
• APWA (American Public Works Association)
• ASLA (American Society of Landscape Architects)
• CLFMI (Chain Link Fence Manufacturers Institute)
• DOT (Department of Transportation)
• FHWA FLH PDDM 2018 (Federal Highway Administration - Federal Lands Highway - Project
Development and Design Manual)
• IA (Irrigation Association)
• MUTCD 2009 with Revisions 1 and 2, May 2012 (Manual on Uniform Traffic Control Devices)
• NAPA (National Asphalt Pavement Association)
• PCA (Portland Cement Association)
• Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
2014, FP-14
The following references are cited as they provide professional guidance for Site Design and Transportation Design within the NPS (National Park Service).
• Alternative Transportation Systems Guidebook
• Greening Federal Facilities
• National Scenic Byways Program
• Park Road Standards
• Special Regulations for Areas of the National Park System
• Transportation Planning Guidebook
UTILITIES
• Backflow Prevention: Comply with each Park's backflow prevention regulations. As minimums, provide double check valve assemblies on all fire services or other water service connections that may have the potential for cross-connection. Provide reduced pressure zone backflow assemblies on all water service connections that may produce hazardous backflow conditions.
• Metering: All domestic and reclaimed water service lines to each building shall be metered in accordance with NPS Staff Directive 78-10.
• ACI (American Concrete Institute)
• ACPA (American Concrete Pipe Association)
• ASME (American Society of Mechanical Engineers)
• ASPE (American Society of Plumbing Engineers)
• ASSE (American Society of Sanitary Engineering)
• AWWA (American Water Works Association)
• DEH (Department of Environmental Health) with Regulations
• DEP (Department of Environmental Protection) with Regulations
• EPA (Environmental Protection Agency) with Regulations
• HI (Hydraulic Institute)
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 27 -
• NACE (National Association of Corrosion Engineers)
• NAPCA (National Association of Pipe Coating Applicators)
• NEMA (National Electrical Manufacturers Association)
• NFPA (National Fluid Power Association)
• NIST (National Institute of Standards and Technology)
• NPDES (National Pollution Discharge Elimination System)
• NPFI (National Pipe Fabrication Institute)
• NSF International (Formerly National Sanitation Foundation (NSF))
• OSHA (Occupational Safety and Health Administration)
• PCI (Precast/Pre-Stressed Concrete Institute)
• PDI (Plumbing and Drainage Institute)
• UL (Formerly Underwriters Laboratories)
• Stormwater and Hydrology: EPA Technical Guidance on Implementing the Stormwater Runoff
Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act, 2009.
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 28 -
4.0 PROGRAM ANALYSIS
The specific information included for each Project Element represents the minimum program analysis requirements. While conceptual layouts are included for guidance, the NPS is seeking innovative design solutions. The Desing-Build Entity (DBE) shall design to optimize the required improvements. The DBE shall complete an evaluation of the design criteria during detailed programming within the DBE’s contract.
4.1 PROJECT ELEMENT 1 – WATER TREATMENT
4.1.1 OVERVIEW
This POR describes the essential needs for a new water treatment facility to meet the current and future needs of Chickasaw National Recreation Area. A new building shall be constructed along the existing access road, as shown in Appendix M. The existing building and equipment shall be retained until the new WTP is operational. The new WTP shall meet or exceed all EPA primary and secondary drinking water standards.
Figure 2: Water Treatment Plant Location
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 29 -
The existing water treatment plant is designed using a conventional rapid sand filter treatment process including flocculation/sedimentation basin, dual media rapid sand filter, and clear well storage within the existing treatment building. The existing treatment plant was constructed in the 1970s and cannot reliably provide treated water to the area served. Several maintenance issues are noted, including difficulty in repairing or replacing aging equipment/appurtenances, non-functional automatic controls damaged by lightning which currently require manual operation, and numerous water leaks. There are two existing 30,000-gallon at-grade steel water storage tanks at the treatment plant site. The existing welded steel tank adjacent to the treatment building is older and has shown issues with corrosion and foundation. The existing bolted steel tank on the north side of the road is newer and no maintenance issues are noted.
The project team evaluated multiple approaches to achieve the park’s water quality objectives, including a treatment method similar to the existing system, a rapid sand filtration method, and the UF filtration method. Following a comprehensive analysis, NPS selected the UF Filtration method as the optimal solution for meeting water quality standards, citing its operational and maintenance efficiency and its compatibility with the park’s designated water treatment infrastructure and location.
Figure 3: Water Treatment Plant Site Study
CHIC 240631 Replace Critical Utility Systems – WTR and Maintenance POR January 2025
Chickasaw National Recreation Area - 30 -
4.1.2 SCHEDULE CONSTRAINTS
The primary challenge in constructing the new water treatment facility is ensuring uninterrupted supply of water during peak visitation season throughout the construction process. To minimize downtime between the existing and new systems, demolition and construction activities shall be strategically divided into clearly defined phases.
4.1.3 SITE PLANNING
A new treatment facility with additional storage is planned to replace the existing facility used for the park’s water treatment operations. The proposed facility will be strategically positioned to avoid impacting the existing 24-inch specimen tree located east of the building site, as identified in the site study in Appendix M. The 30-foot fire protection zone has been delineated to ensure it does not interfere with this specimen tree. Additionally, the existing water tank to the west of the road is to remain in place and will be repainted to harmonize with the surrounding vegetation. No trees or vegetation west of the existing water tank are to be removed during construction activity. The site layout must facilitate vehicular movement throughout construction and future park operations. The site exhibit has been developed with NPS to limit disturbance and achieve design criteria for phasing and demolition described in this section.
PHASING AND DEMOLITION
Design criteria for demolition and phasing include:
Minimize site disturbance and work within the current cleared area to the greatest extent possible.
Some expansion of the gravel roadway and maintenance access areas may be required to facilitate vehicular movement as shown on site exhibit, Appendix M.
Provide 30’ buffer around the water tanks and the proposed building for fire protection. All vegetation within this buffer is to be removed, including several trees, which are listed on the Site Exhibit, Appendix M. Several trees to be removed are cedars (Juniperus virginiana) which are classified as an invasive species in the state of Oklahoma. A healthy 24-inch oak tree (Quercus spp.)
located to the east of to be removed water tank requires special consideration in establishing the 30’ fire protection zone. The fire protection zone shall extend immediately west of this specimen tree, and additional protection measures should be implemented to safeguard it during construction activities.
This is the start of the file's text. The full file is on GovTribe.