B08_Attachment_06_Proposal_Submission_Package.pdf

PDF 900 KB Posted

Attached to
ROMO 160755 - Replace Undersized Entrance Station Federal contract opportunity
Solicitation number
140P2022R0005
Issued by
Department of the Interior National Park Service National Office

About this file

This package contains documents related to a solicitation for replacing an undersized entrance station at Rocky Mountain National Park. The solicitation number is 140P2022R0005 issued by the National Park Service on behalf of Rocky Mountain National Park. Offerors are requested to provide pricing for base requirements to replace the entrance station, as well as optional items like road widening, signage, and materials. Pricing is to be submitted using the contract price schedule template included. The solicitation also includes templates for a bid bond, past performance questionnaires to collect references, a project experience questionnaire, and other standard federal contracting forms.

View the file

Other files for this federal contract opportunity

Other files attached to ROMO 160755 - Replace Undersized Entrance Station, newest first.
File Type Posted
B09_Amendment_04_Solicitation_Questions_and_Answers_0004.pdf PDF
B09_Amendment_04_4-28-22_0004.pdf PDF
Sol_140P2022R0005_Amd_0004.pdf PDF
Second_Sign_in_Sheet_0004.pdf PDF
B09_Amendment_03_4-18-22_0003.pdf PDF
Sol_140P2022R0005_Amd_0003.pdf PDF
Appendix_F_-_ROMO_Fall_River_Entrance_Class_III_Inventory_Final_Metcalf_03242021_0002.pdf PDF
Appendix_D_-_Plan_of_Areas_Requiring_Archeological_Monitoring_0002.pdf PDF
Appendix_C_-_ROMO_FR_HazMatAssessReport_022322_FTC_0002.pdf PDF
Appendix_A_-_Fall_River_Entrance_Station_Geotechnical_Report_09_14_2021_0002.pdf PDF
B09_Amendment_02_Revised_Contract_Price_Schedule_0002.pdf PDF
B09_Amendment_02_Solicitation_Questions_and_Answers_0002.docx DOCX document
Appendix_E_-_ROMO_reveg_Plan_Fall_River_Entrance_ajs_12_6_21_0002.pdf PDF
Appendix_B_-_Fall_River_Entrance_Station_Mortar_Analysis_09_21_2021_0002.pdf PDF
Sol_140P2022R0005_Amd_0002.pdf PDF
Appendix_G_-_2022_03_10_StatementOfStructuralTestsSpecialInspections_-_JVA_CD_Final_0002.pdf PDF
B09_Amendment_02_SF_30_4-15-22_0002.pdf PDF
B09_Amendment_01_Preproposal_Attendees_4-7-22_01.docx DOCX document
B09_Amendment_01_SF_30_4-8-22_01.pdf PDF
Sol_140P2022R0005_Amd_01.pdf PDF
B09_Amendment_01_ROMO_FRE_PreBid_Conference_Presentation_FINAL_04062022_01.pptx PPTX presentation
B09_Amendment_01_ROMO_160755_Second_Site_Visit_Info_01.docx DOCX document
B08_Attachment_01_ROMO_160755_Specifications_3-10-22.pdf PDF
B08_Solicitation_140P2022R0005_ROMO_160755_3-31-22.pdf PDF
B08_Attachment_02_ROMO_160755_Drawings_3-17-22.pdf PDF
B08_Attachment_07_Geotech_Report_9-15-21.pdf PDF
B08_Attachment_05_Vaccination_Certification_Notification_Template.pdf PDF
B08_Attachment_03_Wage_Determination_2-25-22.pdf PDF
Sol_140P2022R0005.pdf PDF
B08_Attachment_04_Certification_of_Vaccination_Form.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Rocky Mountain National Park

Solicitation: 140P2022R0005

Replace Undersized Entrance Station at Fall River Entrance

ROMO 160755

REQUEST FOR PROPOSAL

(RFP)

Proposal Submission Package file_0.wmf

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

For Technical Volume I:

Experience Questionnaire

Subcontractor Reference

Past Performance Questionnaire

For Business & Price Volume II:

SF 24 Bid Bond

Contract Price Schedule

General References

Hazardous Materials Identification Listing

Report on Limitation on Subcontracting

Template for Contracts and Indi

Report on Limitations on Subcontracting [Template Version 7/25/19]

This report is required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000.

Contract Number: [Insert contract #]

Prime Contractor: [Insert prime contractor's company name]

Current Total Contract Price: [Insert the amount of the original contract + all excuted contract modifications]

Type of Set Aside: [Insert type of set-aside: Small Business, HUBZone, SDVOSB, WOSB, 8(a), etc.]

Period of Performance MM/DD/YYYY - MM/DD/YY

Type of Service (Required Participation): [Put an X in the applicable box below per clause 52.219-3, 14, 27,29,30]

1) Services (except construction). 50% maximum may be subcontracted to non-similary situated Subcontractors

2) General construction. 85% maximum may be subcontracted to non-similary situated Subcontractors

3) Construction by special trade contractors. 75% maximum may be subcontracted to non-similary situated Subcontractors

Participartion Calculation as of the Current Invoice

Amounts shown below shall include amounts from all previous invoices and the current invoice. Exclude the cost of materials.

1) Amount Invoiced by the Prime Contractor: $0

2) Portion of Amount Invoiced for All Similarly Situated Subcontractors (SSS)* $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0 Add additional rows if more than 5 SSS

3) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS) $0

Total Amount Paid To: [Insert NSS company name] $0

Total Amount Paid To: [Insert NSS company name] $0

Total Amount Paid To: [Insert NSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0 Add additional rows if more than 5 NSS

4) Prime & SSS Participation % ERROR:#DIV/0! Modify formula if additional rows added above

5) % subcontracted to NSS ERROR:#DIV/0! Modify formula if additional rows added above

* Similarly Situated Subcontractor (SSS): is a small business subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the prime contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.)

** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS)/ Total amount invoiced by the Prime Contractor)

Corrective Action Plan

If the NSS % noted in line 5 above is not in compliance with the % required by contract clause 52.219-3, 14, 27,29,30 then the prime contractor shall provide a written corrective action plan below:

Sheet2

Services (except construction)

General construction

Construction by special trade contractors

General References

READ CAREFULLY: The purpose of this form is for the offeror to provide the Government with general references in the spaces provided as described in the Instructions, Conditions, and Notices to Offerors (Section L). Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

It is especially important that the offeror disclose instances in which their relationships with the references may be considered less than fully satisfactory. The offeror should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an offeror has been less than candid with the Government, which could result in an unfavorable assessment of the offeror’s past performance record. Provide explanations on separate sheets as necessary.

Name of Contractor/Offeror:

Surety

Name of Surety:

Address of Surety:

Name of Agent:

Telephone Number:

Corporate Bank

Name of Bank:

Address of Bank:

Name of Agent:

Telephone Number:

Types and Numbers of Accounts:

Corporate Bank

Name of Bank:

Address of Bank:

Name of Agent:

Telephone Number:

Types and Numbers of Accounts:

Insurance Company

Name:

Address:

Name of Agent:

Telephone Number:

Types of Policies:

Subcontractor

Name:

Address:

Name of Contact:

Telephone Number:

Area of Specialized Work:

Subcontractor

Name:

Address:

Name of Contact:

Telephone Number:

Area of Specialized Work:

Subcontractor

Name:

Address:

Name of Contact:

Telephone Number:

Area of Specialized Work:

Material Supplier

Name:

Address:

Name of Contact:

Telephone Number:

Types of Material:

Material Supplier

Name:

Address:

Name of Contact:

Telephone Number:

Types of Material:

MATERIAL Supplier

Name:

Address:

Name of Contact:

Telephone Number:

Types of Material:

Price Schedule Template

CONTRACT PRICE SCHEDULE

Solicitation Number: 140P2022R0005

PARK - PMIS: ROMO 160755

Project Title: Replace Undersized Entrance Station at Fall River Entrance

Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Refer to section “H” of this solicitation for additional information regarding contract options

Contract Line Item Number (CLIN) Contract Line Item (CLI) Title Qty Unit of Measure Total Price

1 Base Bid 1 LS

2 Rehabilitate Bighorn Ranger Station / Fall River Entrance Station Wastewater System (ROMO 199703) 1 LS

3 Rehabilitate Bighorn Ranger Station / Fall River Entrance Water System (ROMO 249028) 1 LS

4 Culvert Under Fall River Road 1 LS

TOTAL BASE PRICE (Contract Line Item Number 1 Through 4) -----------------------------

5 Road Widening (Bid Option 1) 1 LS

6 Pavement Striping (Bid Option 2) 1 LS

7 Monument Sign with Accessible Parking (Bid Option 3) 1 LS

8 Variable Message Sign (Bid Option 4) 1 LS

9 Stone Veneer (Bid Option 5) 1 LS

10 Weathering Steel Roofing (Bid Option 6) 1 LS

11 Reset Granite CCC Curb (Bid Option 7) 1 LS

12 Lightning Protection (Bid Option 8) 1 LS

13 West Horseshoe Paving (Bid Option 9) 1 LS

Total Price For All Options (Contract Line Item Number 5 Through 13) ---------

Total Proposed Price - Base Plus All Options (Contract Line Item Number 1 Through 13) -

All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 8/31/2022

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

NAME(S)

(Seal) (Seal)

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

2. Corporate

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

JOINT VENTURE

OTHER (Specify)

PARTNERSHIPINDIVIDUAL

CORPORATION

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

B

STATE OF INCORPORATION LIABILITY LIMIT ($)

2. Corporate

Corporate

LIABILITY LIMIT ($)STATE OF INCORPORATION

1.NAME(S) &

C

LIABILITY LIMIT ($)

D

E

F

G

STANDARD FORM 24 (REV. 8/2016) BACK

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 8/31/2022

PRINCIPAL (Legal name and business address)

TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT OF BID PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S)

THOUSAND(S)

HUNDRED(S)

CENTS

BID IDENTIFICATION

BID DATE

INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

3.

3.

(Seal)

(Seal)

(Seal)

Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal)

(Seal)

CORPORATE SURETY(IES)

SURETY A

NAME & ADDRESS

STATE OF INCORPORATION

LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or

Services)

OBLIGATION: We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum. CONDITIONS: The Principal has submitted the bid identified above. THEREFORE: The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid. Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid. WITNESS: The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

SURETY B

NAME & ADDRESS

STATE OF INCORPORATION

LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)

STATE OF INCORPORATION

2.

2.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY C

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY D

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY E

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY F

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY G

STANDARD FORM 24 (REV. 8/2016) BACK

8.2.0.3062.1.452232.445150

Standard Form 24 - Bid Bond

DATE BOND EXECUTED. Enter 2 digit month, 2 digit day and 4 digit year.:

PRINCIPAL (Legal Name and business Address):

STATE OF INCORPORATION :

SURETY(IES) (Name and business address):

PERCENT OF BID PRICE:

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. THOUSAND(S):

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. HUNDRED(S):

DATE Enter 2 digit month, 2 digit day and 4 digit year.:

BID IDENTIFICATION INVITATION NUMBER:

FOR (CONSTRUCTION SUPPLIES, OR SERVICES):

1. Name(s) and title(s) (types):

2. Name(s) and title(s) (types):

3. Name(s) and title(s) (types):

INDIVIDUAL SURETY(IES) 1. NAME(S) (TYPED) :

INDIVIDUAL SURETY(IES) 2. NAME(S) (TYPED) :

CORPORATE SURETY(IES), SURETY A NAME AND ADDRESS:

STATE OF INC.:

CORPORATE SURETY(IES), SURETY A 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY A 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES) LIABILITY LIMIT(S):

If Other was selected, specify here. :

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. CENTS:

CORPORATE SURETY(IES), SURETY B 2.SIGNATURES:

CORPORATE SURETY(IES), SURETY B NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY B STATE OF INC.:

CORPORATE SURETY(IES), SURETY B 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY E 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C STATE OF INC.:

CORPORATE SURETY(IES), SURETY C 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY D 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY D STATE OF INC.:

CORPORATE SURETY(IES), SURETY D 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY D NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY E STATE OF INC.:

CORPORATE SURETY(IES), SURETY E 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY E NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY F 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY F STATE OF INC.:

CORPORATE SURETY(IES), SURETY F 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY F NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY G 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY G STATE OF INC.:

CORPORATE SURETY(IES), SURETY G 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY G NAME AND ADDRESS:

CORPORATE SURETY(IES) B LIABILITY LIMIT(S):

CORPORATE SURETY(IES) C LIABILITY LIMIT(S):

CORPORATE SURETY(IES) D LIABILITY LIMIT(S):

CORPORATE SURETY(IES) E LIABILITY LIMIT(S):

CORPORATE SURETY(IES) F LIABILITY LIMIT(S):

CORPORATE SURETY(IES) G LIABILITY LIMIT(S):

3. The bond may express penal sun as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).:

Project Experience Questionnaire

Solicitation: 140P2022R0005

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror

Company Name

REFERENCED PROJECT INFORMATION

Project Title

Title

Project Location

City, State

Brief Project Description

Description

Project Owner

Company Name

POC:

First & Last Name

Phone:

(XXX) XXX-XXXX

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name

Role on Referenced Project

(Prime or Sub)

Trade

Price

(list for each contractor’s specific work)

Performance Period

(calendar days)

(list for each contractor’s specific work)

Original

Final

Original

Final

Sparky’s Electrical Company

Prime

Prime

$XXX,XXX

$X,XXX,XXX

XX

XX

ABC Plumbing & Heating, Co

Subcontractor

Plumbing & Mechanical

$X,XXX,XXX

$X,XXX,XXX

XXX

XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response

PAST PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS: Offeror to complete Sections A and B and transmit questionnaire to reference.

Reference to complete Sections C and D and transmit back to Contracting Officer listed in section E.

A. CONTRACTOR INFORMATION

Company Name

Company

Street Address

Address

City

City

State

State

Zip Code

XXXXX

DUNS Number

XXXXXXX

Point of Contact

Name, Email, Phone

B. CONTRACT INFORMATION

Project Title

Title

Contract Number

XXXXXXXXXX

Contract Type

Firm Fixed Price / Time & Materials / Cost Reimbursable / Other

Awarded Contract Price

$X,XXX,XXX

Current / Final Price

$X,XXX,XXX

Contract Award Date

XX/XX/XXXX

Contract Completion Date

XX/XX/XXXX

Period of Performance

XX/XX/XXX – XX/XX/XXX

Project Location

Park or Street address, City, State

Client / Owner

Company

Brief description of the contract & work effort:

Scope of work description

C. REFERENCE:

Name

First, Last

Position / Title

Title

Organization

Agency or Company

Phone Number

XXX-XXX-XXXX

Email Address

Email

Signature

Signature

Date

XX/XX/XXXX

D. EVALUATION

Rating

Definition

Exceptional

Performance met contractual requirements and exceeded many to the owner’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good

Performance met contractual requirements and exceeded some to the owner’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory

Performance met contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal

Performance did not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Evaluation Area

Rating

Quality

Quality of workmanship (including subcontractors)?

Choose an item.

Quality of and adherence to quality control plan?

Choose an item.

Quality of informational and technical submittals?

Choose an item.

Overall Quality Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Schedule (& Time Management)

Met project schedule milestones?

Choose an item.

Responded to owner requests in a timely manner?

Choose an item.

Informational and technical submittals submitted timely?

Choose an item.

Promptly addressed scheduling issues?

Choose an item.

Overall Schedule (& Time Management) Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Cost Control

Addressed differing & unforeseen site conditions so as to minimize additional costs?

Choose an item.

Provided fair and reasonable pricing for contract modifications?

Choose an item.

Submitted accurate and complete invoices?

Choose an item.

Promptly paid subcontractors and suppliers?

Choose an item.

Overall Cost Control Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Management

General oversight by project manager and superintendent?

Choose an item.

Coordination with and control of subcontractors?

Choose an item.

Avoidance of accidents & safety violations?

Choose an item.

Addressed location factors (especially remote locations)?

Choose an item.

Maintained good working relationship with owner representatives?

Choose an item.

Demonstrated flexibility, innovativeness and cooperation in resolving potential problems?

Choose an item.

Overall Management Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Small Business Subcontracting (& Labor Standards)

Met regulatory and contractual labor standards?

Choose an item.

Successfully contracted with small and socio-economically disadvantaged businesses?

Choose an item.

Quality and adherence to applicable subcontracting plans?

Choose an item.

Overall Small Business Subcontracting (& Labor Standards) Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Regulatory Compliance

Met building and life safety codes?

Choose an item.

Overall Regulatory Compliance Rating

Choose an item.

Overall Recommendation:

Given what I know today about the contractor's ability to perform in accordance with the contract’s most significant requirements, I would recommend them for similar contracts:

Choose an item.

Overall Comments:

E. RETURN:

Return by

Time / Date

Name

CO or CS name

Title

Contracting Officer / Contract Specialist

Organization

National Park Service – Denver Service Center

Email

First_Last@nps.gov

File details come from the government source that posted it. Updated .