ROMO 160755 - Replace Undersized Entrance Station Federal contract opportunity
Solicitation number
140P2022R0005
Issued by
Department of the Interior National Park Service National Office

About this file

This document outlines specifications for a federal construction project to replace an undersized entrance station at Rocky Mountain National Park. The project involves demolishing existing structures and constructing a new office building and three entrance kiosks, along with associated site work and infrastructure upgrades. Key requirements include replacing water and wastewater systems, roadway and parking area paving, and full security, HVAC and power systems for the new buildings. The solicitation includes various bid options for additional work such as road widening, signage, and materials substitutions. The National Park Service is the contracting agency, with responses due by January 14, 2022 and work to be completed over one construction season.

View the file

Other files for this federal contract opportunity

Other files attached to ROMO 160755 - Replace Undersized Entrance Station, newest first.
File Type Posted
Second_Sign_in_Sheet_0004.pdf PDF
B09_Amendment_04_Solicitation_Questions_and_Answers_0004.pdf PDF
B09_Amendment_04_4-28-22_0004.pdf PDF
Sol_140P2022R0005_Amd_0004.pdf PDF
Sol_140P2022R0005_Amd_0003.pdf PDF
B09_Amendment_03_4-18-22_0003.pdf PDF
Appendix_F_-_ROMO_Fall_River_Entrance_Class_III_Inventory_Final_Metcalf_03242021_0002.pdf PDF
Appendix_D_-_Plan_of_Areas_Requiring_Archeological_Monitoring_0002.pdf PDF
Appendix_C_-_ROMO_FR_HazMatAssessReport_022322_FTC_0002.pdf PDF
Appendix_A_-_Fall_River_Entrance_Station_Geotechnical_Report_09_14_2021_0002.pdf PDF
B09_Amendment_02_SF_30_4-15-22_0002.pdf PDF
Appendix_E_-_ROMO_reveg_Plan_Fall_River_Entrance_ajs_12_6_21_0002.pdf PDF
Appendix_B_-_Fall_River_Entrance_Station_Mortar_Analysis_09_21_2021_0002.pdf PDF
Sol_140P2022R0005_Amd_0002.pdf PDF
Appendix_G_-_2022_03_10_StatementOfStructuralTestsSpecialInspections_-_JVA_CD_Final_0002.pdf PDF
B09_Amendment_02_Revised_Contract_Price_Schedule_0002.pdf PDF
B09_Amendment_02_Solicitation_Questions_and_Answers_0002.docx DOCX document
B09_Amendment_01_Preproposal_Attendees_4-7-22_01.docx DOCX document
B09_Amendment_01_SF_30_4-8-22_01.pdf PDF
Sol_140P2022R0005_Amd_01.pdf PDF
B09_Amendment_01_ROMO_160755_Second_Site_Visit_Info_01.docx DOCX document
B09_Amendment_01_ROMO_FRE_PreBid_Conference_Presentation_FINAL_04062022_01.pptx PPTX presentation
B08_Solicitation_140P2022R0005_ROMO_160755_3-31-22.pdf PDF
B08_Attachment_02_ROMO_160755_Drawings_3-17-22.pdf PDF
B08_Attachment_06_Proposal_Submission_Package.pdf PDF
B08_Attachment_04_Certification_of_Vaccination_Form.pdf PDF
B08_Attachment_07_Geotech_Report_9-15-21.pdf PDF
B08_Attachment_05_Vaccination_Certification_Notification_Template.pdf PDF
B08_Attachment_03_Wage_Determination_2-25-22.pdf PDF
Sol_140P2022R0005.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE UNDERSIZED ENTRANCE STATION

AT FALL RIVER ENTRANCE

PMIS #: ROMO 160755

Also includes PMISes:

ROMO 199703: Rehabilitate Bighorn Ranger Station/Fall River Entrance Station Wastewater

System ROMO 249028: Rehabilitate Bighorn Ranger Station/Fall River Entrance Water System

ROMO 318223: Fall River Road Transportation Improvements

FINAL CONSTRUCTION DOCUMENTS

Construction Specifications

& Appendices

ROCKY MOUNTAIN NATIONAL PARK

10 March 2021

Anderson Hallas Architects, PC 715 Fourteenth Street

Golden, CO 80401 303.278.4378

PAGE INTENTIONALLY BLANK

ROMO 160755 00 01 07 - 1

SEALS PAGE

SECTION 00 01 07

SEALS PAGE

PART 1 - GENERAL

1.1 SUMMARY

A. Professional seals by Design Professionals and others responsible for preparing Construction Documents:

1. Architect:

2. Landscape Architect

ROMO 160755 00 01 07 - 2

3. Civil Engineer:

4. Structural Engineer:

03/10/22

ROMO 160755 00 01 07 - 3

5. Mechanical Engineer:

5. Electrical Engineer:

3/10/2022

ROMO 160755 00 01 00-1

TABLE OF CONTENTS

SECTION 00 01 10 - TABLE OF CONTENTS

00 01 07 Seals Page 00 01 10 Table of Contents

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management & Coordination 013100a Request for Information Form 01 32 16 Construction Schedule 01 32 33 Photographic Documentation 01 33 23 Submittal Procedures 01 35 13 Archeological and Historical Resource Protection 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 57 13 Temporary Erosion and Sediment Control 01 57 19.11 Indoor Air Quality Management 01 57 19.12 Noise & Acoustics Management 01 67 00 Product Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 79 00 Demonstration and Training 01 81 13 Sustainable Design Requirements 01 91 14 Total Building Commissioning

DIVISION 02 - EXISTING CONDITIONS

02 41 13 Selective Site Demolition 02 41 16 Structure Demolition 02 81 01 Offsite Transportation and Disposal 02 82 13 Asbestos Abatement 02 84 16 Handling of Other Regulated Materials 02 83 13 Removal and Disposal of Material Containing Lead

DIVISION 03 - CONCRETE

03 30 00 Cast in Place Concrete 03 45 00 Precast Architectural Concrete

ROMO 160755 00 01 00-2

DIVISION 04 - MASONRY

04 01 40.91 Stone Restoration 04 34 00 Stone Masonry

DIVISION 05 - METALS

05 12 00 Structural Steel Framing 05 50 00 Metal Fabrications

DIVISION 06 - WOOD, PLASTICS, & COMPOSITES

06 10 00 Rough Carpentry 06 10 63 Exterior Rough Carpentry 06 17 00 Shop-Fabricated Structural Wood 06 17 53 Shop-Fabricated Wood Trusses 06 20 23 Interior Finish Carpentry 06 41 16 Plastic Laminate Clad Architectural Cabinets

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 Bituminous Dampproofing 07 21 00 Thermal Insulation 07 21 19 Foamed in Place Insulation 07 25 00 Weather Barriers 07 41 13.16 Standing Seam Metal Roof Panels 07 42 93 Soffit Panels 07 46 46 Fiber Cement Siding 07 62 00 Sheet Metal Flashing and Trim 07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08 14 16 Flush Wood Doors 08 31 00 Access Doors and Frames 08 50 00 Metal Clad Wood Windows 08 71 00 Door Hardware

DIVISION 09 - FINISHES

09 29 00 Gypsum Board 09 30 13 Ceramic Tiling 09 65 43 Linoleum Flooring 09 91 13 Exterior Painting 09 91 23 Interior Painting 09 93 00 Staining and Transparent Finishes 09 96 00 High Performance Coatings

ROMO 160755 00 01 00-3

DIVISION 10 - SPECIALTIES

10 14 23.16 Room Identification Panel Signage 10 26 00 Wall Protection 10 28 00 Toilet Accessories 10 44 13 Fire Protection Cabinets 10 51 13 Metal Lockers 10 81 19 Rodent Control

DIVISION 11 - EQUIPMENT

11 10 00 Barrier Gate Arm Operator

DIVISION 12 - FURNISHINGS

12 24 13 Window and Door Shades 12 32 16 Manufactured Plastic Laminate Clad Casework 12 36 61.19 Quartz Agglomerate Countertops

DIVISION 22 - PLUMBING

22 05 00 Common Work Results for Plumbing 22 05 17 Sleeves and Sleeve Seals for Plumbing Piping 22 05 18 Escutcheons for Plumbing Piping 22 05 19 Meters and Gages for Plumbing Piping 22 05 23 General-Duty Valves for Plumbing Piping 22 05 23.12 Ball Valves for Plumbing Piping 22 05 23.14 Check Valves for Plumbing Piping 22 05 53 Identification for Plumbing Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 11 16 Domestic Water Piping 22 11 19 Domestic Water Piping Specialties 22 13 16 Sanitary Waste and Vent Piping 22 13 19 Sanitary Waste Piping Specialties

DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING

23 05 00 Common Work Results for HVAC 23 05 23 General-Duty Valves for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping 23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 08 00 Mechanical Commissioning 23 23 00 Refrigerant Piping 23 31 13 Metal Ducts 23 31 16 Nonmetal Ducts 23 33 00 Air Duct Accessories 23 74 33 Dedicated Outdoor Air Units 23 81 26 Split System Air Conditioners

ROMO 160755 00 01 00-4

DIVISION 26 – ELECTRICAL

26 05 00 Common Work Results for Electrical……………………………………………………… 26 05 19 Low-Voltage Electrical Power Conductors and Cables…………………………………….

26 05 26 Grounding and Bonding for Electrical Systems…………………………………………….

26 05 29 Hangers and Supports for Electrical Systems……………………………………………….

26 05 33 Raceway and Boxes for Electrical Systems………………………………………………… 26 05 44 Sleeve and Sleeve Seals for Electrical Raceways and Cabling……………………………… 26 05 53 Identification for Electrical Systems………………………………………………………… 26 05 73 Electrical System Studies 26 08 00 Commissioning for Electrical Systems……………………………………………………… 26 09 23 Lighting Control Device……………………………………………………… 26 24 16 Panelboards……………………………………………………… 26 27 13 Electricity Metering 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 41 13 Lightning Protection for Structures 26 43 13 Transient Voltage Suppression for Low Voltage Electrical Power Circuits 26 51 00 Lighting Fixtures

DIVISION 27 - COMMUNICATIONS

27 05 26 Grounding and Bonding for Communications Systems 27 05 28 Pathways for Communications Systems 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and Cabling 27 11 00 Communications Equipment Room Fittings 27 13 00 Communication Backbone Cabling 27 15 00 Communication Horizontal Cabling

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 28 16 00 Intrusion Detection 28 23 00 Video Surveillance 28 31 11 Digital Addressable Fire Alarm System

DIVISION 31 – EARTHWORK

31 10 00 Site Clearings 31 20 00 Earth Moving 31 23 16 Topsoil 31 23 19 Dewatering 31 23 33 Trenching and Backfilling 31 37 00 Riprap Boulders and Bedding

ROMO 160755 00 01 00-5

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 13 73 Concrete Paving Joint Sealant 32 14 00 Unit Paving 32 15 40 Crusher Fines Paving 32 17 23 Pavement Markings 32 33 00 Site Furnishings 32 40 00 Tree Protection 32 91 13 Soil Preparation 32 91 19 Aggregate Topsoil 32 92 19 Seeding 32 93 19 Landscape Boulders 32 96 43 Tree Transplanting

DIVISION 33 - UTLITIES

33 01 30 Cured in Place Pipe 33 11 00 Water Utility Distribution Piping 33 31 00 Sanitary Utility Sewerage Piping 33 34 00 Onsite Wastewater Treatment System 33 41 00 Storm Utility Drainage Piping 33 46 00 Subdrainage

DIVISION 34 – TRANSPORTATION

34 01 00 Maintenance of Traffic

DIVISION 46 – WATER AND WASTEWATER EQUIPMENT

46 07 13 Water Treatment Equipment

ROMO 160755 00 01 00-6

APPENDICES

APPENDIX A: Geotechnical Investigation Report, Rocky Mountain National Park Fall River Entrance, by Yeh and Associates, dated September 15, 2021

APPENDIX B: Mortar Analysis, by Barlow Cultural Resource Consulting, LLC, dated September 21, 2021

APPENDIX C: Hazardous Materials Assessment Report For Rocky Mountain National Park, Fall River Entrance Station, Estes Park, Colorado, by Landmark Environmental, Inc. dated February 23, 2022.

APPENDIX D: Areas Requiring Archeological Monitoring, provided by NPS ROMO.

APPENDIX E: Revegetation Project Summary, provided by NPS ROMO, received December 16, 2021.

APPENDIX F: Class III Cultural Resource Inventory for the Bighorn Ranger Station/Fall River Entrance Wastewater and Water Systems at Rocky Mountain National Park, Larimer County, Colorado, Metcalf Archaeological Consultants, Inc., dated March 2021.

APPENDIX G: Statement of Structural Tests and Special Inspections, JVA, Inc., dated March 10, 2022.

END OF SECTION 00 01 10

ROMO 160755 01 11 00 - 1

SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Section 01 11 00 “Summary of Work” includes the following:

1. Work covered by the Contract Documents.

2. Government Furnished Materials.

3. Contractor use of site.

4. Public use of site.

5. Work Restrictions.

6. Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements

7. Special Construction Requirements.

8. Additional Compliance Requirements.

9. References.

10. Soils Investigation Report.

11. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Rocky Mountain National Park, Fall River Entrance. Northwest of Estes Park, Colorado; Five (5) miles from intersection of US 34 and US 36 (N St. Vrain Ave.) along US 34 (in town from that intersection called E Wonderview Ave.). Site is currently an existing entrance station.

B. The Work includes but is not limited to:

1. Base Contract: The Work includes but is not limited to removal of existing three (3) entrance kiosks, associated office building, and monument sign; removal and replacement of pavement adjacent to entrance buildings; construction of new office building and three

(3) entrance kiosks (all wood framed buildings with concrete foundations and slab, cementitious siding, boardformed concrete veneer base, aluminum clad wood windows, standing seam metal roof); repair of a historic masonry curb, reconstruction of two historic masonry culvert headwalls, replacement existing waterlines; replacement of water treatment system and well pump; replaced electrical infrastructure for replaced system and pump, rehabilitation of sanitary lines with Cured In Place Pipe (CIPP) and replacement of the Onsite Wastewater Treatment System (OWTS). Electrical work also includes coordination with Estes Park Power and Communications for an extension on the primary distribution and a new pad mounted transformer along with all related sitework.

Communications work includes coordination with Lumen to relocate an existing pedestal and associated underground lines. A new wooden pole and conduit will also be provided for future NPS data infrastructure. Building work (office and kiosks) includes typical interior finishes: gyp board walls, paint, wall tile, sheet flooring, cabinetry, hollow metal exterior doors, wood interior doors, and a single user restroom. Supporting infrastructure shall include full security system, including multiple cameras and onsite server, power and

ROMO 160755 01 11 00 - 2

data in all buildings, heating ventilation and cooling for all buildings, including positive pressurization of all kiosks. Site improvements include: new asphalt and reinforced concrete roadway paving, curbing, staff parking area, epoxy pavement markings, accessible sidewalks and curb cuts, concrete patio area, rumble strips, traffic alert signage, buried traffic counter loop, replacement of an existing gate and construction of a new vehicle turnaround area. A spare communications conduit will also be provided for future fiber optic connectivity between the Bighorn Ranger Station and Fall River Entrance Office Building.

a. This scope of work has two contract line items separated out from the base scope of work: the Wastewater System rehabilitation and the Water System rehabilitation with associated historic culvert replacement and pump house repair. See Section 01 27 00 “Definition of Contract Line Items” for specific information on division of scope.

2. Bid Option 1 - Road Widening: includes but is not limited to extending the additional lane from the base scope to the park boundary. This involves additional road construction (asphalt, striping) and associated grading, revegetation and irrigation. See also annotations on civil site plans.

3. Bid Option 2 – Pavement Striping: includes but is not limited to alternate pavement striping and markings materials assuming a 2-part epoxy paint and thermoplastic pavement markings (i.e. ABAAS symbols, etc.).

4. Bid Option 3 – Monument Sign with Accessible Parking: includes but is not limited to new monument sign (wood posts and panel, steel structure, concrete foundations, stone veneer base), asphalt pavement, retaining wall adjacent to parking lot, concrete paving, and a concrete valley cross pan adjacent to the parking area for the monument sign pull-off. Also included in this option is a stormwater solution to route drainage from the roadside ditch beneath the pull-off and back into the roadside ditch to the east.

5. Bid Option 4 – Variable Message Sign: includes but is not limited to wood posts, steel structure, concrete foundations, stone veneer base, trenching/conduit/ power/communications to the sign, a supplemental conduit (laid in same trenching) for future electrical primary replacement, and electronically changeable message sign.

6. Bid Option 5 – Stone Veneer: includes but is not limited to substitution of base bid boardform concrete veneer on the office and kiosk buildings for granite stone veneer.

7. Bid Option 6 – Weathering Steel Roofing and Elements: includes but is not limited to substitution of the base bid prefinished standing seam metal roofing for standing seam bare “weathering” steel roofing. Also substitutes steel bollards, steel sidewalk grate, truncated dome pavers, exposed steel columns and steel screens (at back of office building) with same element composed of weathering steel.

8. Bid Option 7 – Reset Granite historic CCC Curb: includes but is not limited to salvaging and resetting the historic CCC curb on a stabilized base. This work is conditional if additional work beyond base bid exposure and repair of historic CCC curb is directed by Contracting Officer.

9. Bid Option 8 – Lightning Protection: includes but is not limited to lightning protection for the new buildings.

ROMO 160755 01 11 00 - 3

10. Bid Option 9 – West Horseshoe Paving: includes but is not limited to project close repaving of the West Horseshoe parking lot / pulloff area that will be used as a staging area.

11. Bid Option 10 – Culvert under Fall River Road: includes but is not limited to replacement of one (1) existing culvert, two (2) new concrete culvert headwalls constructed of integrally colored concrete with a boardformed finish, and associated grading and revegetation.

12. Bid Option 11 – Fall River Road Culvert Headwall Stone Veneer Finish: includes but is not limited to a different culvert headwall design that includes stone veneer, stone wall cap, and the additional foundation width to support the stone veneer. Basis for design is described in Section 01 27 00 “Definition of Contract Line Items.”

C. Project will be constructed under a single prime contract.

D. The work is intended to be conducted over one construction season but may take place over two years.

1. The intended one year construction period assumes parallel areas of work.

2. References to “phasing” in the specification and drawings shall refer to changes in vehicular routing though the construction area and not to project phases.

a. Phasing of construction is suggested but not dictated by the drawings. The

Contractor is encouraged to propose other methods of managing the work to fit into the schedule.

3. The culvert replacement is preferred to be scheduled during the dry season (fall) but may be conducted in the wet season (spring) or sometime in between.

E. Concurrent Work:

1. The Town of Estes Park has announced a project called the “Downtown Estes Loop” project that will improve the roads through the town immediately to the south of the Fall River Entrance area. This roadwork may affect access for workers and deliveries as well as potentially affect resource availability. The anticipated construction timeline at the time of publication of this document is Summer 2022 through Fall 2023.

a. For contact information and the most current public information, contractor may reference the following Federal Highway Administration website:

https://highways.dot.gov/federal-lands/projects/co/estes

2. Utility improvements that may be occurring at the same time:

a. Fiber Optic expansion into the area, including the buildings/homes near Alpenglow campground. Laying the new cable may pass through the construction site.

b. Electrical Utility Improvements undertaken for this project shall be performed concurrently.

c. Contractor shall coordinate with contractors and/or representatives for the parallel projects such that all concurrent work shall proceed with minimal conflicts.

1.3 GOVERNMENT-FURNISHED MATERIALS

A. Delivery and Storage

1. Contractor is responsible for receiving, unloading, and handling Government-furnished items at Project site.

https://highways.dot.gov/federal-lands/projects/co/estes

ROMO 160755 01 11 00 - 4

2. Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.

3. If Government-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.

4. Contractor shall install and otherwise incorporate Government-furnished items into the Work.

B. Government-Furnished Products:

1. Ponderosa pine trees for revegetation shall be supplied by the park. Contractor shall be responsible for salvaging, storing (only if necessary), and planting the trees. Contractor shall coordinate revegetation work with Contracting Officer.

2. Webcam for traffic camera. Contractor shall install as identified in the drawings.

3. Toilet Accessories: toilet paper dispenser, paper towel dispenser, soap dispenser.

Contractor shall install as identified in the drawings.

C. Items Salvaged Onsite:

1. Old green safe that is within the wall cupboard in the current office. To be salvaged and placed in a corner of the storage room in the new building.

2. Arrowhead from entrance sign.

3. Leftover granite veneer from the construction of retaining walls and Bid Option 5.

4. Select road signs (see site demolition plan).

5. Ponderosa pines to be salvaged and relocated.

6. Boulders alongside road (see site demolition plan) to be salvaged and relocated.

1.4 CONTRACTOR USE OF SITE

A. General: Contractor shall have full use of the area within construction limits for construction operations during the construction period, including use of the project site and designated staging area. Contractor's use of the site is limited only by the Government's right to perform work on-site or adjacent to the site and storage of materials/equipment on acceptable surfaces.

1. Construction limits are called out in the construction drawing set on civil sheets and Maintenance of Traffic (MOT) sheets.

2. Government shall need weekly access to buildings and well in Bighorn Ranger Station area.

3. Limit site disturbance to area identified as construction limits in the civil drawings.

4. To minimize impact to the park’s natural and cultural environment, use lowest impact methodologies for trench excavation.

B. Staging Areas and Storage of Materials:

1. Staging Areas include:

a. West Horseshoe Park Parking Lot (2.5 miles west on Fall River Road)

b. Disturbed areas to sides of road within Limits of Disturbance.

c. Hardened parking lot and access road to Bighorn Ranger Station buildings within

Construction Limits.

ROMO 160755 01 11 00 - 5

2. Confine storage of materials to within construction limits and designated staging area, unless directed otherwise by Contracting Officer.

3. Locate staging and stockpiling areas in hardened areas. Return all staging and stockpiling areas to pre-construction conditions following construction.

4. When possible, place soils on asphalt, paved areas, planks or tarps to reduce ground and vegetation disturbance.

5. Equipment will be kept on hardened surfaces, except where needed to perform grading and utility work.

6. Washout Area(s): Shall be offsite or in repairable areas as approved by the Contracting Officer prior to start of work. Washout sites shall be returned to their original, pre-construction condition, at the close of work. If on Government Property, repaired/cleaned washout site(s) shall be reviewed and approved by Contracting Officer.

C. Highway (Fall River Road/US 34): Keep highway open, clear, and available to public, Government, Government's employees, and emergency vehicles at all times. One lane in each direction is required to be provided. Areas on the shoulder and within Construction Limits may be used for parking or storage of materials.

1. See also Section 01 50 00 “Temporary Facilities and Controls” for full description of provisions required at highway.

D. Driveways and Entrances: Keep access road serving Aspenglen Campground clear and available at all times for Government, Government's employees, and emergency vehicles, and public and residents for the campground road. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Construction Camp: Establishment of a camp within the park will not be permitted.

F. Construction Trailer: Establishment of a construction trailer will be permitted in West Horseshoe Park parking lot or near Fall River Entrance building site, provided it is within the Construction Limits. Provide utilities as specified in Division 1 Section 01 50 00 “Temporary Facilities and Controls.” Keep trailer area neat and clean and return site to previous condition at completion of work.

1. No utility or communication connections are available at West Horseshoe Park.

G. Construction Equipment:

1. Construction Equipment shall not be stored along open roadways overnight, without prior approval of the Contracting Officer.

2. Construction equipment shall not be permitted to idle for longer than five (5) minutes.

H. Hauling Restrictions: Comply with all NPS and DOT load restrictions in the hauling of materials.

Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Chief of Visitor and Resource Protection. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Contracting Officer. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

ROMO 160755 01 11 00 - 6

1.5 PUBLIC USE OF SITE

A. The highway will be open to the public during construction.

B. Contractor shall at all times conduct their operations to ensure the least inconvenience to the public. Temporary closures of all lanes of traffic may be necessary for brief, intermittent periods.

Night work may be considered to minimize disruption of access and placement of steel plates over work areas to facilitate access during non-work hours will be permitted contingent on Contracting Officer approval (see also 1.6 On-Site Work Hours, requirement for Contracting Officer approval for work performed beyond normal working hours).

1. Temporary closures of longer than 10 minutes shall be coordinated in advance with park staff.

2. Temporary closures of 10-30 minutes shall be discussed during Construction Progress

Meetings.

3. Temporary closures of greater than 30 minutes shall be applied for 72 hours in advance of closure date/time.

4. Contractor shall follow terms for closures detailed in Section 01 50 00 “Temporary

Facilities and Controls.”

5. Temporary traffic control outside of Federal property is subject to approval by the Town of Estes Park and CDOT.

C. Emergency Vehicle Access is required at all times. Contractor shall coordinate with dispatch to ensure access is provided.

1.6 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 6 a.m. to 6 p.m., Monday through Friday, except as otherwise arranged with Contracting Officer.

1. No work shall be performed beyond normal working hours, on weekends or federal holidays without prior approval of the Contracting Officer.

B. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

1. The utilities shown in the drawings are indicated in accordance with available records. All utilities may not be shown and those which are shown may not be shown accurately. The contractor shall be responsible for field locating all utilities including public utilities and NPS owned utilities to determine exact locations, elevations and sizes.

2. Contractor shall be responsible for calling the Colorado 811, (800) 922-1987 and park a minimum one week in advance of digging. Contractor may be required to use additional methods for utility locations, such as electromagnetic utility locating, acoustic pipe locating, ground penetrating radar or potholing.

a. Public Utilities include:

1) Primary Power: Town of Estes Park, Power and Communication Department

2) Telephone: Lumen

ROMO 160755 01 11 00 - 7

3) Cable/Internet: Lumen

4) Sewer outside the Park: Upper Thompson Sanitation District

5) Water outside the Park: Town of Estes Park

b. NPS Utilities include:

1) Water

2) Sewer

3. Work Near or Affecting Existing Utilities

a. Existing Utilities: Notify Contracting Officer and utility companies and park of proposed locations and times for excavation not less than one week in advance.

b. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

c. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

4. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions:

a. Notify Contracting Officer and park not less than one week in advance of proposed utility interruptions.

b. Do not proceed with utility interruptions without Contracting Officer’s written permission.

C. Multiple areas of work: Due to the short construction period, this project scope assumes parallel areas of work, such as utility improvements at the same time as demolition and construction at the entrance station. The Contractor may propose strategies, alterations, or economies to achieve the documented design intent within the required completion date, which must be reviewed and approved by the Contracting Officer prior to any action being taken to enact any of these.

D. Nonsmoking Building: Smoking is not permitted within buildings or within 25 feet of entrances, operable windows, or outdoor air intakes.

E. Fire Restrictions: The contractor shall be responsible for keeping informed and informing all on-site staff regarding current fire restrictions at the park. This may include an outdoor smoking prohibition if fire conditions warrant.

F. Hot Work Permits: No hot work is anticipated on this project, but if the contractor finds this is necessary, the following is required.

1. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of the National Park Service Authority Having Jurisdiction.

2. Hot work permits, approved through the Contracting Officer by the park’s structural fire coordinator, are required for any hot work. Submittal of permit request is required no less than one week in advance of the work. Do not proceed until notified by the Contracting Officer that the permit has been approved.

ROMO 160755 01 11 00 - 8

1.7 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES

AND IMPROVEMENTS

A. As required by FAR Clause 52.236-9:

1. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall treat as directed by the Contracting Officer.

2. The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

B. Provide temporary barriers to protect existing trees and plants and root zones.

C. Provide temporary barriers to protect existing cultural features, as identified by the Contracting Officer.

D. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.

E. Do not fasten ropes, cables, temporary fence, or guy wires to existing trees.

F. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

G. No storage, parking, or excavation shall be allowed within the drip line of protected trees without approval from the Contracting Officer.

1.8 SPECIAL CONSTRUCTION REQUIREMENTS

A. Roads

1. Trail Ridge Road (US 34) is closed during the winter. Locations of closures will vary based on weather and road conditions. It is generally closed at the first significant snowfall (usually mid to late October) and reopened through plowing by late May. Check https://www.nps.gov/romo for up to date information.

a. Note that this is not in the project area as our project and the West Horseshoe Park staging area are on Fall River Road.

2. Old Fall River Road is closed during the winter. It is generally closed at the first snowfall

(usually early to mid October) and reopened through plowing by early July. Check https://www.nps.gov/romo for up to date information.

a. Note that this section of road is also not in the project area.

https://www.nps.gov/romo https://www.nps.gov/romo

ROMO 160755 01 11 00 - 9

3. The road restrictions in line with general height, weight, and length specs for State of Colorado highways.

a. The weight restrictions for the area are: 80,000 lbs. for the roadways.

b. No known bridges in the area that would decrease this weight rating.

c. The length restriction is 70’ total for tractor trailers.

4. If construction vehicles will be traveling to the park from the west side of the park via Trail Ridge Road, pilot cars are required for tractor trailers from the switchbacks of Trail Ridge Road on the west side to Hidden Valley on the east side.

5. Contractor shall review and confirm the above with CDOT prior to construction traffic start, as conditions may have changed.

B. Weed Mitigation

1. All borrow, road base, aggregate, crusher fines, bedding, topsoil, hay bales and other fill materials brought into Rocky Mountain National Park and used in this project shall be certified weed free. Without certification, materials shall come from commercial sources that have been inspected by the NPS and approved prior to materials entering the Park.

2. Equipment Cleaning:

a. Clean vehicles and construction equipment prior to entry into the Park to minimize the potential for introduction and/or proliferation of invasive non-native weeds through project actions. The contractor is required to wash equipment, with emphasis on undercarriages, with a high pressure spray prior to transporting such equipment to Rocky Mountain National Park.

b. All vehicles and construction equipment entering Rocky Mountain National Park shall be inspected and approved by the Contracting Officer prior to entering the park.

c. Equipment not deemed clean by the Contracting Officer will not be allowed to enter the park. The contractor remains liable for additional transportation fees incurred when equipment fails inspection.

d. Cleaning will not be permitted within the park. Contractor shall be responsible for identifying and using a cleaning location outside the park. Note that this may be some distance from the park and project site.

C. Avoid Soil Compaction

1. Avoid compaction from heavy equipment to surrounding area by keeping equipment inside the limits of work.

2. Compacted soils must be ripped or decompacted post construction to enable vegetation.

3. All disturbances must be returned to grade and any tracks from equipment must be raked out.

D. Bird Protection Acts

1. In order to protect birds under the Migratory Bird Treaty Act (MBTA, 16 U.S.C. 703–712), all construction work performed between February 1 and August 31 requires a site survey, to be performed by a trained individual. The survey must be completed within two weeks prior to the start of construction. Additional surveys will be required after periods of no work exceeding two weeks. The Contractor will be required to avoid cutting down trees with active nests, however, other work would be permitted to continue. Some species may also require a buffer around active nests where work cannot occur.

ROMO 160755 01 11 00 - 10

a. Contractor shall request a site survey a minimum of one month prior to mobilization.

2. In order to protect eagles under the Bald and Golden Eagle Protection Act (BGEPA, 16 U.S.C. 668-668c), all construction work requires a site survey, to be performed by a trained individual. The survey must be completed within two weeks prior to the start of construction and encompass the project location as well as a half mile area surrounding the project. . If an active bald eagle or golden eagle nest is found, work that causes disturbance to the eagles will not be permitted. If an active or inactive nest is found, the Contractor will be required to avoid cutting down trees with nests.

a. Contractor shall request a site survey from Contracting Officer a minimum of one month prior to mobilization.

3. In order to protect Mexican Spotted Owls (MSO) under the Endangered Species Act (ESA;16 U. S. C. 1531-1544), if a MSO is discovered near the project site, work will be stopped while additional consultation with the US Fish and Wildlife Service is completed.

The construction site is within MSO foraging habitat.

a. Contractor shall request a site survey from Contracting Officer a minimum of one month prior to mobilization.

E. Reducing Wildlife Interactions

1. Do not feed or disturb wildlife within the Park boundaries. Do not approach or remain within 25 yards of any wildlife.

2. All construction personnel working in the field must follow park food storage regulations, 36 CFR 2.10. All food, garbage, toiletry, or other bear attractants must not be left unattended for any length of time.

a. These items shall be stored inside vehicle trunks.

b. In vehicles with no trunk, place these items as low in the vehicle compartment as possible and covered from sight, with all windows and doors closed and locked.

3. On-site construction personnel are required to report all bear, mountain lion, and/or any unusual sightings in the work area to the Contracting Officer.

F. Archeological Monitoring

1. The Government is providing archeological monitoring, and Contractor is required to comply with information and procedures as specified in Section 01 35 13 “Archeological and Historical Resource Protection.”

G. Work Within Rocky Mountain National Park and Coordination with Park Employees

1. Contractors will coordinate with park staff to reduce disruption to normal park activities.

2. Construction workers and job superintendent will be required to attend park resource orientation session lasting no more than two hours to learn about the special sensitivity of park values, regulations, and appropriate litter and trash control measures. The Contracting Officer will coordinate orientation session with the NPS Cultural Resource Specialist and NPS Natural Resource Specialist to develop resource awareness. Work schedule, equipment to be used on project and resource protection plan will be discussed. This training session shall occur prior to the start of work and will be repeated for changes of key personnel.

ROMO 160755 01 11 00 - 11

a. Training session shall also include orientation regarding emergency procedures for local safety risks, including but not limited to lightning, flood, fire, wildlife.

3. The National Park Service will ensure that all contractors and subcontractors are informed of the penalties for illegally collecting artifacts or intentionally damaging archeological and/or natural sites and/or historic properties. Contractors and subcontractors will also be instructed on procedures to follow, in case previously unknown archeological and/or natural resources are uncovered during construction.

H. Blasting is not permitted in this project.

1.9 ADDITIONAL COMPLIANCE REQUIREMENTS

A. The work of this project has been reviewed and approved by the State Historic Preservation Office for compliance with the requirements of Section 106 of the National Historic Preservation Act.

To minimize impact to the cultural resources, work shall be performed as specified in Section 01 35 13 “Archeological and Historical Resource Protection.”

1.10 REFERENCES

A. Industry Standards.

1. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

2. Publication Dates: Comply with standards in effect as of the date of the Contract Documents unless otherwise indicated.

1.11 GEOTECHNICAL INVESTIGATION REPORT (Appendix A)

A. A soils investigation report entitled Geotechnical Investigation Report Rocky Mountain National Park Fall River Entrance has been prepared by Yeh and Associates, Inc and dated September 15, 2021.

B. A copy of the report is available to all plan holders with this package.

C. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

1.12 MORTAR ANALYSIS (Appendix B)

A. A mortar analysis report entitled Mortar Analysis has been prepared by Phillip Barlow, Historic Preservation Specialist and dated September 21, 2021.

B. A copy of the report is available to all plan holders with this package.

ROMO 160755 01 11 00 - 12

1.13 ADDITIONAL REPORTS

A. A hazmat report is anticipated to be produced prior to bidding, prepared in early 2022 by Landmark Environmental.

1. A copy of the report shall be available to all plan holders with this package.

B. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00 - SUMMARY OF WORK

ROMO 160755 01 26 01 - 1

012721 CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section 01 26 01 “Contract Modification Procedures” consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager (PM), Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

ROMO 160755 01 26 01 - 2

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.

The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: The hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:

1) Social Security

2) Medicare

3) Workers Compensation – Policy and company calculation to be made available.

4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.

ROMO 160755 01 26 01 - 3

5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.

6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.

Include as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank

ROMO 160755 01 26 01 - 4

utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.

3. Requests for extensions of contract time as a result of change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) upon request.

5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. Labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for work being performed.

2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.

3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book http://www.nps.gov/dscw/publicforms.htm#CP___PAGEID=396735|

ROMO 160755 01 26 01 - 5

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.

6. Standby unit rates used…