B08 Attachment 0026 - PWS Annex B Supply PRS.pdf
PDF 241 KB Posted
- Attached to
- EAGLE REDSTONE ARSENAL, AL W519TC-23-R-0094
- Solicitation number
- W519TC-23-R-0094
About this file
This document outlines performance work statement requirements for supply and logistics services at a central issue facility and installation supply support activity. Key requirements include providing organizational clothing and individual equipment services within five days of receipt, accepting turn-ins of equipment 30 days prior to out-processing, maintaining property book accountability and supporting documentation, processing supply requests within established timeframes, performing monthly arms room and hazardous material inventories, and conducting repairs and preventive maintenance on supply vehicles and equipment. Acceptable quality levels range from 90 to 100 percent depending on the requirement. Services will be awarded on a best value basis under solicitation number W519TC-23-R-0094 issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal. The period of performance and response date are not specified.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task/Requirement Standard Sampling Method, Lot & Acceptable
Quality Level (AQL)
INSTALLATION SUPPLY AND SERVICES DIVISION (ISSD) – GENERAL
CENTRAL ISSUE FACILITY (CIF) Storefront Operations
5.15.1 Provide core Organizational Clothing and Individual Equipment (OCIE) services in accordance with The Department of the U.S. Army.
Timeliness: Process soldiers records within 5 Working days.
Quality: IAW local directives, AR 710-2, para 2-14
Random sampling
Lot: The number of soldiers requiring issue of items IAW HQDA Policy.
AQL: 95%
5.15.2 Provide new Procedural steps to support retained issue for active-duty component Soldiers, and business rules to ensure the Soldiers success in clearing the installation
Timeliness: Process soldier records and update within 5 working days.
Quality: CIF Storefront will ensure all soldiers that process through will have support and knowledge of process.
Random sampling
Lot: The number of soldiers supported in a month.
AQL: 90%
5.15.3 Accept turn-ins of OCIE.
Timeliness: 30 days prior to out-processing at this location to schedule turn-in appointments for Direct Exchange prior to retirement and Expiration of Term of Service.
Quality: Soldier will receive a stamped clearance document for all items accepted for turn-in.
Random sampling
Lot: CIF Store Front ships to RLSC and RLSC delivers response message to clear CIF ISM within 3-5 business days
5.15.3 Excess OCIE items reported to Central Management Office (CMO) for redistribution prior to initializing any turn-in action.
Timeliness: Excess OCIE items reported to CMO within 15 working days of discovery that the items are excess.
Quality: Divest of OCIE above four years of supply or IAW End of Life lists provided by CMO policy.
Random sampling
Lot: The number of OCIE LIN’s reported to the CMO at the time of surveillance.
AQL: 90%
5.15.4 Conduct 100% control check of inventory
Timeliness: Once a year to ensure accuracy.
Quality: Special measurement items ordered IAW directive IAW AR 700-84.
Random sampling
Lot: The number of accurate locations verified.
AQL: 100%
5.15.5 Maintain inventory accuracy and Ensure shelf-life is within
Timeliness: Process within 3 working days.
Random sampling established parameters 100% of the time.
Quality: Maintained IAW policy and regulatory guidelines
Lot: The number of records processed the day of surveillance.
AQL: 97%
CONSOLIDATED INSTALLATION PROPERTY BOOK OFFICE
5.18.1 Maintain property book
accountability and supporting documentation on a continuing basis.
Timeliness: LIS generated issue documents closed out daily.
Quality: LIS generated issue documents closed out IAW ADSM 18
Series Manuals and SOP.
Random sampling
Lot: The number of documents closed out on the day of surveillance.
AQL: 98%
5.18.1 Notify hand receipt holders
(SLOC) of required inventory review and provide inventory list
Timeliness: Notification no less than 30 calendar days of required inventory review and provide inventory list
Quality: Notify hand receipt holders
(SLOC) of required inventory review and provide inventory list IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of required inventory review and inventory list on file at the time of surveillance.
Reconcile on-hand inventory with records, and update hand receipts accordingly
Timeliness: Reconcile/update within 3 working days upon turn-in of inventory report from hand receipt holders
Quality: Reconcile on-hand inventory with records, and update hand receipts accordingly IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Reconcile on-hand inventory with records, and update hand receipts at the time of surveillance.
Process excess requests upon receipt of valid disposition instructions
Timeliness: Upon receipt of turn-in equipment, process excess removal within 30 working days Quality: Process excess requests upon receipt of valid disposition instructions
IAW local directives, AR 710-2, DA
PAM 710-2-1
Random sampling
Lot: The number of Process excess requests upon receipt of valid disposition instructions at the time of surveillance.
5.18.1 Timeliness: Reconcile request within
10 working days
Process shortage requests to ensure authorized property is on hand or on order
Quality: Process shortage requests to ensure authorized property is on hand or on order IAW local directives, AR
710-2, DA PAM 710-2-1
Lot: The number of Process shortage requests to ensure authorized property is on hand or on order at the time of surveillance.
Process lateral transfers
Timeliness: Upon request, post or accept transfer within 3 working days
Quality: Process lateral transfers IAW local directives, AR 710-2, DA PAM
710-2-1
Random sampling
Lot: The number of Process lateral transfers at the time of surveillance.
Process "found on installation" property
Timeliness: Post to property book within working 7 days
Quality: Process "found on installation" property IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Process "found on installation" property at the time of surveillance.
AQL: 90%
5.18.1 Catalog non-standard
equipment
Timeliness: Upon receipt of equipment, request non-standard LIN within 1 working day
Quality: Catalog non-standard equipment IAW local directives, AR
710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Catalog non-standard equipment at the time of surveillance.
AQL: 90%
5.18.1 Process adjustment documents
Timeliness: Upon receipt of complete/accurate Financial Liability Investigations of Property Loss (FLIPL) -provide document number within 24 hours; Statement of Charges and AAR within 5 working days
Process adjustment documents IAW local directives, AR 710-2, DA PAM
710-2-1
Random sampling
Lot: The number of Process adjustment documents at the time of surveillance.
AQL: 90%
5.18.1 Timeliness: Copies of hand receipts
provided within 8 hours of request.
Provide printouts of current hand receipts for supported units and activities as requested
Quality: Copies of hand receipts provided IAW AR 710-2.
Lot: The number of printouts provided at the time of surveillance.
Request/order non-expendable items.
Timeliness: Order within 3 working days (dependent on customer funding availability)
Quality: Request/order non-expendable items IAW local directives and AR 710-2& DA PAM 710-2-1.
Random sampling
Lot: The number of requisitions processed on the day of surveillance.
Reconcile open supply requests with Supply Support Activity
(SSA)
Timeliness: Conduct on a monthly basis
Quality: Reconcile open supply requests with Supply Support Activity
(SSA) IAW local directives and AR 710-
2.
Random sampling
Lot: The percentage of Reconcile open supply requests with Supply Support Activity (SSA) at the time of surveillance.
Document all non-expendable/major end item acquisitions
Timeliness: Post received item to the property book within 3 working days
Quality: Document all non-expendable/major end item acquisitions IAW local directives and
AR 710-2.
Random sampling
Lot: Documents of all non-expendable/major end item acquisitions at the time of surveillance.
Inventory and document Total
Package Fielding/force modernization support equipment
Timeliness: (1) Document shortages immediately; (2) Post received items to the property book within 3 working days
Quality: Inventory and document Total
Package Fielding/force modernization support equipment IAW local directives and AR 710-2.
Random sampling
Lot: Inventories and documents for Total Package Fielding/force modernization support equipment at the time of
Set-up fiduciary accounts for
Government furnished property
(GFP)
Timeliness: Set-up accounts within 3 working days of contract start date (COR provides GFP annex to PBO)
Quality: Set-up fiduciary accounts for
Government furnished property (GFP)
IAW local directives and AR 710-2.
Random sampling
Lot: The number of Set-up fiduciary accounts for Government furnished property (GFP) at the time of
Notify Commander's
Representative for pick-up of non-expendable dedicated items
Timeliness: Notify within 3 working days of item arrival
Quality: Notify Commander's
Representative for pick-up of non-expendable dedicated items IAW local directives and AR 710-2.
Random sampling
Lot: The number of Notify Commander's Representative for pick-up of non-expendable dedicated items at the time of surveillance.
Review turn-ins for (1) compliance IAW contractual obligations (such as with
Government furnished property
(GFP)), (2) serviceability, and (3) correct inventory amount; and post to the property book
Timeliness: Upon receipt of complete and accurate documentation and associated equipment, post within 3 working days
Quality: Review turn-ins IAW local directives and AR 710-2.
Random sampling
Lot: The number of reviewed turn-ins at the time of surveillance.
AQL: 90%
5.18.1 Maintain a file of customer
signature cards for supported units/activities.
Timeliness: Signature cards updated within 10 business days of expiration.
Quality: Signature cards maintained
IAW local directives, AR 710-2, and DA
Pam 710-2-1.
Surveillance activity checklist
Lot: Inspect all signature cards maintained at the time of surveillance.
AQL: 99%
5.18.2 Ensure that the warehouse is
safe, fire-hazard free and free of debris, trash and other hazards at all times.
Timeliness: Inspect the warehouse daily
Quality: The warehouse is safe, fire-hazard free and free of debris, trash and other hazards IAW local directives, AR 710-2, and DA Pam 710-2-1.
Surveillance activity checklist
Lot: Inspect the warehouse at the time of
AQL: 99%
INSTALLATION SUPPLY SUPPORT ACTIVITY (RETAIL SUPPLY SVCS)
5.19.1 Maintain a file of customer
signature cards for supported units/activities.
Timeliness: Signature cards updated within 10 business days of expiration.
Quality: Signature cards maintained
IAW local directives, AR 710-2, and DA
Pam 710-2-1.
Surveillance activity checklist
Lot: Inspect all signature cards maintained at the time of surveillance.
Maintain a voucher register for
Found on Installation (FOI) items.
Timeliness: Document numbers assigned from the voucher register the same day the FOI is discovered.
Quality: Register maintained IAW local directives, AR 710-2, and DA PAM 710-
2-2.
Random sampling
Lot: The number of document numbers assigned from the register at the time of surveillance.
AQL: 90%
5.19.1 Process DLADS withdrawal
documents.
Timeliness: DLADS withdrawals processed the same day received.
Quality: DLADS withdrawals processed
IAW AR 710-2 and local directives.
Random sampling
Lot: The number of DLADS withdrawal documents processed at the time of surveillance.
AQL: 90%
5.19.1 Perform inventory adjustment
functions for annual, cyclic, and special (sensitive items and weapons) inventories, and location surveys.
Timeliness: IAR’s processed within 2 days of notification of requirement.
Quality: IAR’s processed IAW AR 710-2, AR 735-5, and local directives.
Random sampling
Lot: The number of IAR’s processed at
Screen turn-in documents for redirect to DLADS.
Timeliness: Turn-in documents screened within 1 business day.
Quality: Turn-in documents processed
IAW DA PAM 710-2-2 and local directives.
Random sampling
Lot: The number of documents processed at the time of surveillance.
AQL: 90 %
5.19.1 Process warehouse denials.
Timeliness: Warehouse denials processed within 1 business day.
Lot: The number of warehouse denials processed at the time of surveillance.
Quality: Warehouse denials processed
IAW AR 710-2, GCSS-A manuals, ADSM-18-L1Y-AJT-ZZZ-EM, and local directives.
Report excess CL VII vehicles, trailers and construction equipment.
Timeliness: Excess CL VII items reported within 1 business day of report of excess.
Quality: Excess CL VII items reported and kept in a suspense file until disposition instructions are received
IAW GCSS-A Manual ADSM-18-LIY-AJT-
ZZZ-EM.
Surveillance activity checklist
Lot: Inspect all CL VII items reported at the time of surveillance.
AQL 90%
5.19.1 Prepare a Supply Discrepancy
Report (SDR) SF 364, for discrepancies of shortage, damages, or overages of shipments received.
Timeliness: SDRs prepared and processed within 3 business days after discovery of damages or discrepancies.
Quality: SDRs prepared IAW DA PAM
25-30 and local directives.
Random sampling
Lot: The number of SDRs processed at the time of surveillance.
AQL: 90%
5.19.1 Perform causative research and
annual, cyclic, and special
(sensitive items and weapons) inventories and location surveys.
Timeliness: Causative research completed within 2 days of notification of requirement.
Quality: Causative research conducted
IAW AR 710-2, AR 735-5, and local.
Random sampling
Lot: The number of Causative researches
5.19.2 Process DODAAC transactions
to the LOGSA Army Central
Service Point.
Timeliness: DODAAC transactions processed to LOGSA within 2 business days of receipt of request.
Quality: DODAAC transactions processed IAW AR 725-50.
Random sampling
Lot: The number of DODAAC transactions
5.19.2 Notify requesting activity in
writing when DODAAC transactions have been completed.
Timeliness: DODAAC memos forwarded to requesting activity within 1 business day of completion of transaction.
Lot: The number of DODAAC memos
Quality: Requesting activity notified
IAW AR 725-50.
5.19.3 Process receipt documents.
Timeliness: Shipments received, inspected and inventoried daily.
Quality: Receipt documents processed
IAW DA PAM 25-30, AR 710-2, and local directives.
Random sampling
Lot: The number of receipt documents processed at the time of surveillance.
AQL: 90%
5.19.3 Process Central Receiving Point
(CRP) receipts.
Timeliness: Receipt documents processed within 1 business day.
Quality: Turn-in documents processed
IAW DA PAM 710-2-2 and local directives.
Random sampling
Lot: The number of receipts processed at the time of surveillance.
AQL: 90%
5.19.3 Maintain customer signature
cards, DA form 1687 for issues from the CRP.
Timeliness: Signature cards updated within 10 business days of expiration.
Quality: Signature cards maintained
IAW AR 710-2 and local directives.
Surveillance activity checklist
Lot: Inspect all signature cards maintained at the time of surveillance.
AQL: 99%
5.19.3 Notify customer upon receipt of
“Push Shipments” that items are ready for pick up.
Timeliness: Customer notified within 1 business day.
Quality: Push shipments annotated in a log book with the date received, unit/activity recipient name, and phone number, date contacted IAW
AR 710-2.
Random sampling
Lot: The number of push shipments annotated in the logbook at the time of surveillance.
AQL: 90%
5.19.4 Operate and maintain the
FEDEX PowerShip 2 system.
Timeliness: Express Packages prepared and processed within 2 business days of receipt.
Quality: Turn-in documents processed
IAW FEDEX PowerShip instructions.
Random sampling
Lot: The number of Express Packages shipped at the time of surveillance.
AQL: 90%
5.19.4 Maintain a logbook recording
FEDEX tracking numbers.
Timeliness: Tracking numbers recorded daily in the logbook.
Lot: The number of FEDEX tracking numbers logged at the time of
Quality: Tracking numbers maintained in the logbook IAW DA PAM 710-2-2 and local directives.
5.19.4 Maintain source document files
for FEDEX documentation.
Timeliness: Documents filed with no more than a 2 day backlog.
Quality: Documents filed IAW AR 710-2 and local directives.
Random sampling
Lot: The number of documents filed on the day of surveillance.
5.19.4 Submit daily summary
transmittal and keep on file for verifying FEDEX billing invoices.
Timeliness: Transmittals submitted daily.
Quality: Summary transmittals submitted IAW FEDEX PowerShip instructions.
Random sampling
Lot: The number of transmittals
5.19.5 Perform a monthly Arms Room
inventory.
Timeliness: Arms Room inventory completed by the end of the last business day of the month.
Quality: Conduct inventory of all CCI and sensitive equipment IAW AR 710-
2, AR 735-5, and DA PAM 710-2-1.
Surveillance activity checklist
Lot: Inspect all items listed on the most recent inventory at the time of
Process turn-ins for small arms.
Timeliness: Turn-ins of small arms processed and excess reported within 4 duty hours of receipt.
Quality: Turn-ins of small arms processed IAW AR 710-2 and local directives.
Surveillance activity checklist
Lot: Inspect all small arms turn-in documents processed at the time of surveillance.
AQL: 100%
5.19.5 Receive sensitive/special
controlled items (i.e. rifles, carbines, machine guns, pistols, fire control equipment, missile training equipment, night vision
Timeliness: Receipts processed the same day items are received.
Quality: Receipt documents processed
IAW AR 710-2, DA PAM 710-2-1, AR
190-11, and local directives.
Surveillance activity report.
Lot: Inspect all sensitive/special controlled item receipt documents goggles, devices, and unclassified/classified COMSEC material).
AQL: 100%
5.19.5 Provide Packing and Crating
services of shipments of weapons and COMSEC items.
Timeliness: Turn-in items packaged within 1 business day
Quality: Turn-in items packaged IAW
DA PAM 710-2-2 and local directives.
Random sampling
Lot: The number of documents
Ensure that serial numbers for sensitive items are recorded on turn-in documents.
Timeliness: Turn-in documents screened within 1 business day.
Quality: Turn-in documents processed
IAW ADSM-18-LIY-AJT-ZZZ-EM and local directives.
Random sampling
Lot: The number of sensitive item turn-ins processed at the time of surveillance.
Provide Packing and Crating services.
Timeliness: Shipments processed within 2 business days of receiving shipping instructions.
Quality: Shipments processed IAW instructions received from the NICP.
Random sampling
Lot: The number of shipment documents
Process turn-in documents.
Timeliness: Turn-in documents processed within 1 business day of receipt.
Quality: Turn-in documents processed
IAW AR 710-2, DA PAM 710-2-1, DA
PAM 710-2-2, and local directives.
Random sampling
Lot: The number of turn-in documents
5.19.6 Perform care of supply in
storage (COSIS).
Timeliness: Perform required inspections that identify discrepant packaging within the required cyclic times or by the Stock Readiness Program.
Lot: Number of COSIS inspections performed within the established timeframes.
Quality: IAW Stock Readiness Program
Business Rules, AR 710-2, AR 740-3, DA
PAM 700-32, DODM 4140.27, MIL-STD-
2073-1, and local directives.
AQL: 95%
5.19.6.1 Determine crating and
packaging requirements for storage.
Timeliness: Determination made the same day received.
Quality: Determination made IAW
Stock Readiness Program Business
Rules, AR 740-3, 2 MIL-STD-2073-1, DA
PAM 700-32, and local directives.
Random sampling
Lot: The number of determinations completed documents at the time of
5.19.6.1 Package turn-ins for redirect to
DLADS or to depot.
Timeliness: Turn-in items packaged within 1 business day.
Quality: Turn-in items packaged IAW
MIL-STD-2073-1, DA PAM 700-32, AR
740-3, and local directives.
Random sampling
Lot: The number of documents
5.19.8 Perform repairs and scheduled
preventive maintenance on
Supply Division’s forklift fleet and associated equipment.
Timeliness: Repairs and scheduled preventive maintenance actions performed daily.
Quality: Repairs and scheduled preventive maintenance actions performed IAW local SOPs.
Random sampling
Lot: The number of PM actions performed at the time of surveillance.
Prepare and process DA form
2407 (work orders) for vehicle/equipment repair.
Timeliness: DA form 2407’s prepared for vehicles and equipment by COB next business day.
Quality: DA form 2407’s prepared for vehicles and equipment IAW AR 710-2.
Random sampling
Lot: The number of DA 2407’s processed at the time of surveillance.
Report excess CL VII vehicles, trailers and construction equipment.
Timeliness: Excess CL VII items reported within 1 business day of report of excess.
Quality: Excess CL VII items reported and kept in a suspense file until
Surveillance activity checklist
Lot: Inspect all CL VII items reported at disposition instructions are received
IAW LIS Manual ADSM-18-LIY-AJT-ZZZ-
EM.
AQL 90%
HAZARDOUS MATERIAL (HAZMAT)
5.20.1 Support Garrison Commander
guidelines for Hazardous
Material Control.
Timeliness: Ensure most recent copy is on hand at HMCP.
Quality: AR 200-1, AR 385-10, AR 700-
141, DA PAM 710-7 (In Revision), DA
Pam 710-2, AUL (Authorized Use List)
Random sampling
Lot: Compliance at time of sampling.
5.20.2 Process HAZMAT received at the ISSA through GCSS-Army and manage in the Army’s Material Management System, Enterprise Environmental & Safety Occupational Health- Management Information System (EESOH-MIS).
Timeliness: Process and label HAZMAT through EESOH-MIS immediately upon receipt
Quality: The number of SDS printed at the time of surveillance. AR 200-1, TM
38-410
Random sampling
Lot: Percentage HAZMAT items labeled upon receipt: 100-95% green, <95% -90% amber, <90% -80% red, <80% black
5.20.3 Store items with hazard
classification (Unit responsible for establishing Authorized Use
Lists (AUL) at the 50% level.
Timeliness: Perform location maintenance, to include shelf life management, inventories of all Authorized to Forecast (ATF) and relocation of assets (bin-to-bin) and create new locations as required.
Quality: Material Release Orders
(MROs) Class III (P) in accordance with
HMCP internal procedures, AR 710-2 and DA PAM 710 2-2.
Random sampling
Lot: Compliance at time of sampling.
AQL: 90%
5.20.4 Manage shelf-life and turn in
expired HAZMAT (material not coded condition A or B)
Timeliness: HMCP sites will not accept Type 1 shelf-life items with no less than 24 months of remaining shelf-life and Type II shelf life items with no less than 12 months of remaining shelf life.
Quality: Logistics Readiness Center
(LRC) Shelf-Life Management
Procedures; first in first out rotation of that materiel to limit environmental
Random sampling
Lot: Established AUL will use the materiel available IAW shelf life in order to limit stock on shelves.
waste. TM 38-410; 29 CFR (Code of
Federal Regulations); DTR 4500.9R,
5.20.5 Prepare and turn-in Class III (P)
products to DPW Recycle
Center once products expiration date has been exceeded, or when product can no longer be extended.
Timeliness: The contractor shall ensure that adequate packing materials are on hand and or requisitioned to delivery of expired products to the recycle center.
Quality: Ensure that products are cleaned and properly packaged or palletized prior to delivery to the recycle center.
Random sampling
Lot: Process request within 1 business day.
AQL: 90%
AMMUNITION SUPPLY SERVICES
5.22.1 Inspect commercial vehicles
delivering ammunition and complete DD form 626 (Motor
Vehicle Inspection) prior to their entry into the ASP.
Timeliness: Vehicles inspected prior to entry to ASP.
Quality: All vehicles inspected prior to entry to the ASP and discrepancies noted IAW AR 710-2.
Random sampling
Lot: The number of DD form 626’s processed at the time of surveillance.
AQL: 98%
5.22.1 Prepare manual Ammunition
Stores Slip (DA form 3151-R).
Timeliness: Stores Slips prepared within 1 duty day.
Quality: Stores Slips prepared IAW internal SOP.
Random sampling
Lot: The number of Stores Slips prepared at the time of surveillance.
AQL: 95%
5.22.1 Inspect military unit vehicles
using Motor Vehicle Inspection
(DD form 626) and verify unit driver’s licenses are valid and annotated to reflect the driver.
Timeliness: Military unit vehicles inspected prior to entry to the ASP.
Quality: Unit vehicles inspected and driver’s license endorsed IAW local directives.
Random sampling
Lot: The number of DD form 626’s processed at the time of surveillance.
AQL: 98%
5.22.1 Conduct ammunition
surveillance inspections and classify for serviceability;
reclassify munitions showing deterioration to appropriate
Condition Code.
Timeliness: Perform surveillance inspections at specified intervals and unit turn-ins at time of receipt. Cyclic inspections are performed IAW commodity command directives.
Classify ammunition according to condition.
Quality: Duties are performed by contractor surveillance inspectors
Random sampling
Lot: Percent of surveillance inspections conducted IAW mandated policies and regulations.
under the guidance of a Quality
Assurance Specialist (Ammunition
Surveillance) (QASAS). Ammunition inspections are conducted IAW DA
PAM 710-2-1, SB 742-1, and SOPs.
5.22.1 Process Ammunition Inspection
Records (DSR) (DA Form 3022-
R) (ACR) (DA Form 2415).
Timeliness: Ammo Inspection Records processed in Munitions History Program (MHP) by COB daily.
Quality: Ammo Inspection records maintained in MHP IAW AR 702-12 and
SOP.
Random sampling
Lot: The number of Ammo Inspection Records processed at the time of surveillance.
AQL: 95%
5.22.1 Perform required inventories.
Timeliness: Inventories of ammunition performed.
Quality: Ammunition inventories performed IAW AR 710-2.
Surveillance activity checklist
Lot: Inspect the most recent inventories performed at the time of surveillance.
AQL: 99%
5.22.1 Perform conductive footwear
tests.
Timeliness: Conductive footwear will be tested at the time of issue and daily before use.
Quality: Conductive footwear tests performed IAW DA PAM 385-64 and
TB 385-4.
Surveillance activity checklist
Lot: Inspect all conductive footwear tests performed at the time of surveillance.
5.22.1 Reconcile issue document
against LIVE munitions &
RESIDUE turn-ins.
Timeliness: Complete reconciliation process within 5 working days from end of training event and/or test event as annotated on the DA Form 581.
Quality: Reconcile all unit documentation within SAAS-Mod.
Random sampling
Lot: The number of turn-in documents processed at time of receipt.
5.22.3 Maintain a Command Oriented
Arms, Ammunition, and
Explosives (AA&E) Security
Screening, and Evaluation
Record, (DA Form 7281).
Timeliness: Ensure DA 7708 is completed and updated IAW AR 190- 13.
Quality: DA 7708 records are properly completed and available for review.
Semi-annual check
Lot: The number of posted documents to records within 24 hours of receipt.
5.22.4 Train A&E Employees IAW DA
PAM 385-64, AMC Reg. 350-4, ALARACT Messages, and other training deemed necessary by
Government.
Timeliness: Ensure all required training is completed prior to employee performing A&E duties.
Quality: All required training and certification certificates are reviewed by KO/COR prior to employee performing A&E duties.
Random sampling
Lot: All required training and certifications complete prior to employee performing A&E duties.
5.22.5 Perform surveillance Damage-
in-Transit (DIT)/Receipt
Inspections (RI); Reclassify munitions to appropriate condition code according to severity of damage.
Timeliness: A DIT/RI is performed at time of receipt and can be conducted ICW vehicle inspection; Inspector signs DD Form 1348 to reflect DIT/RI and munitions are properly classified.
Quality: All DIT/RI performed at time of receipt. Discrepancies and reclassification noted IAW AR 702-12 and surveillance SOPs.
Random sampling
Lot: The number of DD Form 1348’s processed at time of surveillance.
5.22.5.1 Under technical guidance of the
QASAS, conduct required inspections of the stockpile and surveillance of unit turn-ins.
Timeliness: Ensure all inspections are conducted IAW SB 742-1 and other applicable TM criteria and surveillance of unit turn-ins (live and residue) is provided.
Quality: Inspections are conducted
IAW SB 742-1 and other applicable TM criteria. Surveillance of unit turn-ins
(live and residue) conducted to ensure proper segregation of ammunition residue and live ammunition.
Random sampling
Surveillance of unit turn-ins conducted during all unit turn-ins (live and residue).
5.22.6.2 Prepare and mark light boxes
and non-standard packs.
Timeliness: Light boxes and non-standard packs processed and issued on day of scheduled pick up.
Quality: Light boxes and non-standard packs processed IAW FORSCOM Reg
700-4, MIL-STD-129 series, Marking for
Shipment, and Storage.
Random sampling
Lot: The number of light boxes and non-standard packs processed on the day of
5.22.6.2 Prepare and mark all light boxes
and non-standard packs IAW
CFR 40, MIL-STD-129 Series and
AMC regulations and drawings.
Timeliness: Ensure all light boxes and non-standard packs are configured IAW applicable regulations.
Quality: All light boxes and non-standard packs are properly marked
IAW aforementioned publications.
Daily spot check of light boxes and non-standard packs as they are created during unit turn-ins and/or unit issues.
Lot: All light boxes and non-standard packs created during unit turn-ins and/or unit issues.
AQL: 100%
5.22.6.3 Process Ammunition Transfer
Records (ATR’s) (DA form 4508).
Timeliness: Ammo Transfer Records processed by COB daily.
Quality: Ammo transfer records maintained in a central control register
IAW TM 743-200-1.
Random sampling
Lot: The number of ammo transfer records processed at the time of surveillance.
AQL: 95%
5.22.6.6 Accept ammunition from
installation commander's amnesty program and ammunition found on installation (FOI).
Timeliness: Amnesty turn-ins must be posted to the accountable records within 24 hours of processing at the
ASP.
Quality: Turn-in completed IAW AR
710-2.
Random sampling
Lot: Complete amnesty turn-in at time of receipt.
AQL: 100%
5.22.6.6 Accept ammunition turned in
under the provisions of the AE amnesty program IAW DA PAM
700-16 and AR 190-11.
Timeliness: Accept all amnesty or found on installation ammunition upon notification.
Quality: All ammunition turned in under the amnesty program is exempt from the 24-hour advance turn-in notification and will be picked up on the SRA; no turn-in documentation is necessary.
Random Sampling
Lot: All ammunition turned in under the AE amnesty program will be accepted.
File details come from the government source that posted it. Updated .