B08 Attachment 0017 - PWS Annex A - Maintenance PRS.pdf

PDF 155 KB Posted

Attached to
EAGLE Fort McCoy, WI - W519TC-23-R-0119
Solicitation number
W519TC23R0119
Issued by

About this file

This document is an Annex to the Performance Requirements Summary (PRS) for a federal contract opportunity related to maintenance services at Fort McCoy, Wisconsin. The PRS outlines the quality standards, sampling methods, lot sizes, and Acceptable Quality Levels (AQLs) for various maintenance tasks, including performing inspections, meeting performance metrics, operating equipment, providing supplies and services, and ensuring safety and compliance.

The key maintenance areas covered are general materiel maintenance, materiel maintenance support, allied trades, repair parts and materiel management, and food service equipment. The PRS also addresses contractor personnel requirements and safety standards for operating material handling equipment, maintaining eye-wash stations and fire extinguishers, and ensuring electrical equipment and tools are compliant with regulations. The related federal contract opportunity is for maintenance, supply, and transportation services at Fort McCoy, with the Department of the Army Materiel Command Contracting Command Rock Island Arsenal as the procuring agency.

View the file

Other files

File Type Posted
W519TC-23-R-0119 - 0008.pdf PDF
W519TC-23-R-0119 - 0007.pdf PDF
W519TC-23-R-0119 - 0006.pdf PDF
W519TC-23-R-0119 - 0005.pdf PDF
W519TC-23-R-0119 - 0004.pdf PDF
B08 Attachment 0001 - PWS v2.pdf PDF
W519TC-23-R-0119 - 0003.pdf PDF
W519TC-23-R-0119 - 0002.pdf PDF
W519TC-23-R-0119 - 0001.pdf PDF
B08 Attachment 0014 - NOT APPLICABLE.pdf PDF
B08 Attachment 0024 - Appendix B - 181st MFTB.docx DOCX document
B08 Attachment 0002 - Staffing and Labor Mix.xlsx XLSX spreadsheet
B08 Attachment 0018 - PWS Annex B - Supply PRS.pdf PDF
B08 Attachment 0012 - NOT APPLICABLE.pdf PDF
B08 Attachment 0015 - Subcontractor Cost Information Submission.pdf PDF
B08 Solicitation - W519TC23R0119.pdf PDF
B08 Attachment 0021 - PWS Annex E - Definitions Acronyms and Abbreviations.docx DOCX document
B08 Attachment 0005 - Cost Price Matrix.xlsx XLSX spreadsheet
B08 Attachment 0003 - Performance Questionnaire.pdf PDF
B08 Attachment 0023 - Appendix A - 88th RD.docx DOCX document
B08 Attachment 0009 - Purchasing Invoicing Guide (PIG).docx DOCX document
B08 Attachment 0025 - Appendix C - Garrison Support.docx DOCX document
B08 Attachment 0020 - PWS Annex D - Environmental Requirements.docx DOCX document
B08 Attachment 0007 - Department of Labor Wage Determinations 2015-4929-26.pdf PDF
B08 Attachment 0010 - Blocked File Extensions.pdf PDF
B08 Attachment 0022 - PWS Annex F - Publications and Forms.docx DOCX document
B08 Attachment 0001 - PWS.pdf PDF
B08 Attachment 0026 - Appendix D - 94th TD.docx DOCX document
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf PDF
B08 Attachment 0013 - Mission Essential Contractor Services.pdf PDF
B08 Attachment 0032 - FMWI Industry Question Template.xlsx XLSX spreadsheet
B08 Attachment 0004 - Letter of Consent.pdf PDF
B08 Attachment 0011 - Contract References Spreadsheet.xlsx XLSX spreadsheet
B08 Attachment 0019 - PWS Annex C - Transportation PRS.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex A – Maintenance PRS

Task/Requirement Standard Sampling Method, Lot & Acceptable

Quality Level (AQL)

MATERIEL MAINTENANCE – GENERAL

5.1.4 Perform initial and final inspection on all work orders.

Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.

Random Sampling

Lot: The total number of completed work orders during the period being surveilled.

AQL: 4.0

MATERIEL MAINTENANCE SUPPORT

5.3.2 Meet performance metrics found in AR 750-1 or reference metrics in requirements documents for specified program.

Quality:

Meet or exceed maintenance performance metrics IAW AR 750-1.

Random Sampling

Lot: The total number of base operations work orders completed during the period being surveilled.

ALLIED TRADES

5.4.3.1 Operate and maintain spray booths and breathing air machines.

Quality: IAW OSHA 29 CFR 1910-107 &

134, AR 200-1

Periodic Inspection

Lot: All spray booths and breathing air machines under control of KTR at time of surveillance.

AQL: 0.065

REPAIR PARTS AND MATERIEL MANAGEMENT TASKS

5.5.1 Perform shop supply services.

Quality: IAW ARs, DA Pams, and applicable regulations and guidance references.

Random Sampling

Lot: The total number of completed work orders during the period being surveilled.

FOOD SERVICE EQUIPMENT

5.7.2 Perform preventive and

required inspections, services, and maintenance.

Quality: IAW applicable TMs, SOPs, Tri-

Service Food Code TB MED-530, and commercial reference publication(s).

Random Sampling Lot: All work completed during the period being surveilled.

5.7.3 Provide unscheduled

maintenance.

Timeliness: Unscheduled maintenance service calls are responded to within 24 hours or 1 GBD of notification from DFAC maintenance POC.

Lot: The total number of completed work orders during the period being surveilled.

AQL: 4.0

CONTRACTOR PERSONNEL REQUIREMENTS & SAFETY

1.3.2.4 Operate and PMCS MHE (forklifts) as part of implementation of the plan of maintaining GFE.

Quality:

a. All forklifts are properly dispatched with the correct signatures on the dispatch form.

b. All forklifts are PMCS’d IAW current regulations and guidance.

Random Sampling

Lot: The total number of forklifts on the GFE list.

AQL: 0.65

1.8.5 Ensure eye-wash stations (plumbed and portable) are in compliance with current regulatory guidance.

Timeliness: Eye-wash stations are checked weekly.

Quality: Check is conducted IAW current ANSI guidance.

Random Sampling

Lot: The total number of eye-wash stations located in contractor operated maintenance facilities.

AQL: 4.0

1.8.5 Ensure portable fire extinguishers are in compliance with current regulatory guidance.

Timeliness: Portable fire extinguishers are checked monthly.

Quality: Check is conducted IAW current NFPA guidance.

Random Sampling

Lot: The total number of portable fire extinguisher stations in contractor operated maintenance facilities.

AQL: 1.5

1.8.5 Ensure all bench and floor mounted electrical equipment (i.e., electric grinders, saws, drills, etc.) is IAW current regulatory guidance.

Quality: Equipment is safe to use and is in compliance with current regulatory guidance.

Random Sampling

Lot: The total number of bench and floor mounted electrical equipment (i.e., electric grinders, saws, drills, etc.) on the GFE list in maintenance facilities.

AQL: 2.5

1.8.5 Ensure all hand-held electrical tools are in compliance with current regulatory guidance.

Quality Equipment is safe to use and is in compliance with current regulatory guidance.

Random Sampling

Lot: The total number of electrical tools on the GFE list in maintenance facilities.

AQL: 6.5

1.8.5 Quality: Equipment is correctly tagged

and/or stenciled.

Ensure safety inspections and load testing is performed on all lifting and MHE equipment and/or devices (i.e., hoists, pallet jacks, forklifts, chains, etc.).

Lot: The total number of lifting and MHE equipment on the GFE list.

AQL: 2.5

File details come from the government source that posted it. Updated .