Replace Roof and Gutters - BLRI Federal contract opportunity
Solicitation number
140P5126Q0036
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This is a Bid Schedule for construction services related to roof and gutter replacement on two buildings (B034 and B035) at a facility called Bluffs, which contains both seasonal and permanent housing.

The bid schedule is divided into two line items. The first item covers roof replacement work including removal and off-site disposal of existing asphalt shingle roofing and underlayment; weather protection during construction; inspection and repair or replacement of damaged roof supports (rafters), decking, and sheathing; replacement of all existing flashing in-kind; installation of new 30-pound asphalt saturated or synthetic roofing underlayment; installation of dark gray 30-year architectural interlocking tab shingles; installation of drip edges around the roof perimeter; installation of full-length ridge cap and roof vent system; and installation of new waterproof vent collars. The second line item covers gutter and downspout replacement, including removal and replacement of approximately 420 linear feet of gutters and associated downspouts on buildings B034 and B035, replacement of any damaged fascia boards behind the gutters with in-kind matching material, and installation of gutter guards on all gutters. Bidders are required to provide total pricing for each line item, with blank spaces provided for cost entry.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

REMOVE/REPLACE ASPHALT SHINGLE ROOF AND GUTTERS ON BLUFFS SEASONAL

AND PERMANENT HOUSING BUILDINGS (B034, B035)

REMOVE/REPLACE ASPHALT SHINGLE ROOF BUILDINGS (B034,B035)

1. Remove and dispose of the existing asphalt shingle roof(s) and roofing underlayment off site

2. Protect the building structures and contents from weather and other potentially damaging elements

3. Inspect the existing roof supports (rafters) and fascia boards, replace damaged facia boards

4. Repair or replace in kind as necessary damaged roof supports (rafters), decking, sheathing revealed by inspection

5. Replace in kind all existing flashing

6. Install new 30 pound asphalt saturated roofing underlayment or synthetic underlayment;

7. Install new dark gray 30 year architectural shingles with interlocking tabs

8. Install new drip edges around the entire perimeter of the roof

9. Install full length ridge cap(s) roof vent system

10. Install new waterproof vent collars

Total: $

REMOVE/REPLACE GUTTERS ON BLUFFS SEASONAL AND PERMANENT

HOUSING BUILDINGS (B034, B035)

1. Remove and replace approximately 420 linear feet of gutter and associated downspouts on buildings B034, B035

2. Replace any damaged fascia boards behind the gutters on B034 and B035 before new gutters are installed, fascia must be in-kind to match with remainder of building fascia.

3. Install gutter guards on all gutters

Total: $