Sol_140P5126Q0036.pdf

PDF 820 KB Posted

Attached to
Replace Roof and Gutters - BLRI Federal contract opportunity
Solicitation number
140P5126Q0036
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This is a Request for Quote (RFQ) for roof and gutter replacement services at Blue Ridge Parkway in North Carolina, issued by the National Park Service on June 5, 2026, with quotes due July 6, 2026, at 1:00 PM EST.

The solicitation (140P5126Q0036) is a 100% Small Business set-aside restricted to firms qualifying under NAICS code 238160 (Roofing Contractors) with a small business size standard of $19,000,000. The project involves removal and replacement of roof and gutter systems for two residential buildings (B034 & B035) at Bluffs Housing located at Blue Ridge Parkway 49794 & 49796, Laurel Springs, North Carolina 28644. The scope includes removal of approximately 3,600 square feet of asphalt shingles and replacement with architectural 30-year shingles and #30 underlayment (synthetic underlayment acceptable), repair or replacement of damaged plywood sheeting and facia boards, replacement of drip edge and roof boots, installation of roof underlayment and ridge vents, removal and replacement of approximately 420 linear feet of gutters with downspouts, and installation of approximately 270 linear feet of gutter guards. The project is a firm fixed-price contract with performance period from July 13, 2026, to November 13, 2026 (approximately 90 days of work after a 14-day notice-to-proceed period). Davis Bacon prevailing wages for Alleghany County, North Carolina apply. A mandatory site visit is scheduled for June 16, 2026, at 10:00 AM EDT at the project location. Performance and Payment bonds (100% each) are required based on total contract amounts. Offerors must submit responses in three volumes: Technical Approach, Past Performance, and Price Quote (on Attachment 0003 – Bid Sheet). Evaluation is on a lowest-price technically acceptable basis, with awards based on technical capability, past performance on similar roofing projects within three years, safety records (OSHA 300A logs required), proposed schedule, key personnel resumes demonstrating three years' relevant experience, and price reasonableness. All offerors must be registered in SAM.gov with current representations and certifications, and must comply with small business subcontracting limitations (75% for construction by special trade contractors). Questions must be submitted by June 19, 2026, at 1:00 PM EDT. Quotes must be submitted electronically to edward_dingle@ios.doi.gov.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140P5126Q0036

NPS SER EAST MABO

100 Alabama St., SW 1924 Building Atlanta GA 30303-8701

0044039590

PSE

Edward Dingle 4045075747

06/05/2026

07/06/2026

14 90 52.211-20

SITE LOCATION: Blue Ridge Parkway 49794 & 49796 Laurel Springs, North Carolina 28644.

PROJECT TITLE: Provide all material, labor, and supervision for the removal and replacement of roof and gutter systems for two houses, buildings B034 & B035 at Bluffs Housing: removal of approximately 36-Sq

/3,600 -SF of asphalt shingles and replace with architectural 30 year shingles and #30 underlayment

(note: underlayment can be replaced with synthetic underlayment), repair/replace damaged plywood sheeting/facia boards, replace drip edge, roof boots, install roof underlayment, installation of a ridge vent(s) along the length of the buildings, the removal and replacement of approximately 420-LF of gutter with downspouts and installation of approximately 270-LF of gutter guards on buildings. The buildings are a two-story residence with an asphalt shingle roof for Blue Ridge Parkway Laurel Springs, North

Carolina.

This procurement will be a 100% Small Business (SB) set-aside. The NAICS Code is 238160 - Roofing

Contractors, with a small business size of $19,000,000.00. The PSC is Z1JZ: Maintenance of Miscellaneous

Buildings.

Continued...

1 45

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

NPS SER EAST MABO

100 Alabama St., SW 1924 Building Atlanta GA 30303-8701

PSE

Edward Dingle

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

All interested offers MUST have an active vendor record in SAM.gov, be a small business under the identified NAICS code and NOT have any exclusions such as a delinquent federal debt or debarment.

SITE VISIT: A site visit is scheduled for June

16,2026 at 10:00 am EDT. Contractors are required to RSVP with the government point of contact for this requirement. The park POC for this site visit is: Mr. Chris Dockery at

865-214-2776 (cell), office 828-348-3459 or email christopher_dockery@nps.gov. All questions must be directed via email by May 05, 2026 3:00pm EDT to Edward_dingle@ios.doi.gov.

Type of Contract: Firm Fixed Price Contract.

Davis Bacon prevailing wages for Alleghany

County, North Carolina will apply for this requirement See attachment 0002 or NC20260050 on WDOL.gov will apply.

Provide all labor, tools, equipment, materials, and supervision required to provide replacement of roofs and gutters in accordance with the

Specifications, Davis Bacon Wage Determination, and Terms and Conditions.

No onsite work shall take place until a Notice to Proceed (NTP) is provided. NTP will not be provided until the following items are received/approved:

1.Receipt of Payment and Performance Bonds, if applicable

2.Receipt of Certificate of Liability

Insurance

3.Receipt and Approval of Contract Specific

Safety Plan

4.Receipt and Approval of Work Schedule

5.Receipt and Approval of Material Submittals

6.Schedule and Completion of PreCon

Delivery: 11/13/2026

Delivery Location Code: 0011283000

NPS, Blue Ridge Parkway

Headquarters, 199 Hemphill Knob Rd

Asheville NC 28803-8686 US

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

Period of Performance: 07/13/2026 to

11/13/2026

00010 Provide the removal and replacement of roof for two houses, buildings B034 & B035 at Bluffs

Housing: removal of approximately 36-Sq/3,600

-SF of asphalt shingles and replace with architectural 30 year shingles and #30 underlayment (note: underlayment can be replaced with synthetic underlayment), repair/replace damaged plywood sheeting/facia boards, replace drip edge, roof boots, install roof underlayment, installation of a ridge vent(s) along the length of the buildings. The buildings are a two-story residence with an asphalt shingle roof for Blue Ridge Parkway

Laurel Springs, North Carolina in accordance with the attached statement of work (SOW).

Product/Service Code: Z1JZ

Product/Service Description: MAINTENANCE OF

MISCELLANEOUS BUILDINGS

00020 Provide the removal and replacement of gutter systems for two houses, buildings B034 & B035 at Bluffs Housing: removal and replacement of approximately 420-LF of gutter with downspouts and installation of approximately 270-LF of gutter guards on buildings. The buildings are a two-story residence for Blue Ridge Parkway

Laurel Springs, North Carolina in accordance with the attached statement of work (SOW).

Product/Service Code: Z1JZ

Product/Service Description: MAINTENANCE OF

MISCELLANEOUS BUILDINGS

TABLE OF CONTENTS

PART I - The Schedule

SECTION A - Solicitation/contract form SECTION B - Bid schedule SECTION C - Specifications/Drawings SECTION D - Packaging and marking ................Postage and Markings SECTION E - Inspection and acceptance .............. Inspection of Construction … SECTION F - Deliveries or performance ...............Commencement, Prosecution, and Completion of Work ...............Suspension of Work… SECTION G - Contract administration data ...............Contract Administration ...............Authorities & Delegations (subcontracting & Site Administration) SECTION H - Special Contract Requirements ...............Safety ...............Progress Meetings ...............Operation of Facility during Construction… ...............Contractor Employees

PART II- Contract Clause

SECTION I - Contract clause ...............Clauses by Reference ...............Release of Claims - Department of Interior ...............Liability Insurance - Department of Interior

PART III - List of Documents, Exhibits, and Other Attachments

SECTION J - List of Attachments… ............... Specifications ............... Wage Determination ............... Price Schedule ............... Past Performance Questionnaire ............... Site Visit Information

PART IV – Representations and Instructions

SECTION K - Representations, certifications, and other statements of offerors SECTION L - Instructions, conditions and notices to offerors ............... Site Visit ............... Instruction to Offerors for Quote Submission SECTION M - Evaluation factors for award

Part I – The Schedule Section A - Solicitation/contract form

This solicitation is a Request for Quote (RFQ), in accordance with the Specifications/Drawings and is issued on Standard Form (SF) 1442.

PROJECT TITLE: This project will provide the removal and replacement of roof and gutter systems for two houses, buildings B034 & B035 at Bluffs Housing: removal of approximately 36-Sq /3,600 -SF of asphalt shingles and replace with architectural 30 year shingles and #30 underlayment (note: underlayment can be replaced with synthetic underlayment), repair/replace damaged plywood sheeting/facia boards, replace drip edge, roof boots, install roof underlayment, installation of a ridge vent(s) along the length of the buildings, the removal and replacement of approximately 420-LF of gutter with downspouts and installation of approximately 270-LF of gutter guards on buildings. The buildings are a two-story residence with an asphalt shingle roof for Blue Ridge Parkway Laurel Springs, North Carolina in accordance with the statement of work (SOW).

SITE LOCATION: Blue Ridge Parkway. The buildings are located at Blue Ridge Parkway 49794 & 49796 Laurel Springs, North Carolina 28644.

NOTICE TO PROSPECTIVE OFFEROR’S

SMALL BUSINESS SET-ASIDE: This requirement is a 100% Small Business (SB) set-aside.

SUBMISSION OF DOCUMENTS: Your offer must include the following Sections and Forms:

SF-1442, SOLICITATION, OFFER AND AWARD. PLEASE NOTE: The SF-1442 must be signed, and dated, and Blocks 14 through 20c must be completed.

SF-1442, ITEM 17, Offeror's are cautioned to review acceptance time stated in Item 13d before completing this item. Quotes offering less than specified time will cause quotes to be rejected.

SECTION B, Price Schedule (“ALL” Pricing shall be submitted with attachment 0003 as Volume III ONLY)

SECTION K, REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

SUBMIT AN OFFER TO THE FOLLOWING ADDRESS:

OFFERS SHALL BE SUBMITTED VIA EMAIL ONLY TO: edward_dingle@ios.doi.gov

PERFORMANCE/PAYMENT BONDS - Successful offeror will be required to furnish Performance and Payment bonds on Standard Forms 25 and 25A based on total contract amounts in the following ranges: 100% performance bond, 100% payment bond. Offerors understand that the Government will inspect, accept, and possess the completed work and release the bonding when the work is completed and accepted under FAR 28.203-5.

SITE VISIT: There will be one formal site visit for this requirement (No informal or individual site visits shall be allowed as part of the request for quote). The site visit is scheduled for June 16, 2026, at 10:00am EDT. See site visit instructions in Section L.8 of this document. Participation in the site visit is highly encouraged.

All questions regarding this solicitation shall be submitted in writing (No telephone calls will be accepted) to the Contracting Officer. Questions must be submitted no later than June 19, 2026, at 1:00pm EDT. Questions mailto:edward_dingle@ios.doi.gov submitted after this time may NOT be considered.

Quotes are due on July 06, 2026, at 1:00pm EST.

Section B – Bid schedule

Complete the Standard Form (SF) 1442: Offeror is to complete Blocks 14 through 20. Offerors shall include their valid SAM registered UEI number and cage code in Block 14 of the SF1442 when submitting offer.

Offeror must include original signature of individual authorized to sign for the company.

The Contractor should provide all labor, parts, tools, equipment, supervision, and all incidentals as necessary to provide the removal and replacement of roof and gutter systems for two houses, buildings B034 & B035 at Bluffs Housing: removal of approximately 36-Sq /3,600 -SF of asphalt shingles and replace with architectural 30 year shingles and #30 underlayment (note: underlayment can be replaced with synthetic underlayment), repair/replace damaged plywood sheeting/facia boards, replace drip edge, roof boots, install roof underlayment, installation of a ridge vent(s) along the length of the buildings, the removal and replacement of approximately 420-LF of gutter with downspouts and installation of approximately 270-LF of gutter guards on buildings. The buildings are a two-story residence with an asphalt shingle roof for Blue Ridge Parkway Laurel Springs, North Carolina in accordance with the attached statement of work (SOW).

PRICE QUOTE MUST CONTAIN A COST BREAKDOWN AND BE COMPLETED ON ATTCHMENT 0003 –

BID SHEET.

Section C – Specifications/Drawings

C.1 The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified). To perform the Statement of Work, included as Attachment 0001:

Attachment 0001, Statement of Work

Section D – Packaging and marking

No clauses included.

Section E – Inspection and acceptance

E.1 Notice Listing Contract Clause Incorporated By Reference

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title and Date) in accordance with the clauses at FAR 52.252-2 CLAUSES INCORPORTATED BY REFERENCE in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

Number Title Date 52.246-12 Inspection of Construction Aug 1996 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements Aug 1996

Section F – Deliveries or performance

F.1 Notice Listing Contract Clause Incorporated By Reference

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title and Date) in accordance with the clauses at FAR 52.252-2 CLAUSES INCORPORTATED BY REFERENCE in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

Number Title Date 52.236-15 Schedules for Construction Contracts Apr1984 52.242-14 Suspension of Work Apr 1984

Section G – Contract administration data

G.1 Contracting Officer’s Representative(s) for this contract will be:

TBD

G.2 Contract Officer responsible for administering this contract:

Edward Dingle, Jr.

National Park Service Contracting Operations (ConOps) East 100 S.W. Alabama Street, Atlanta, Georgia 30303 Email: edward_dingle@ios.doi.gov

G.3 Technical Direction

The performance of the work required in this contract shall be subject to the COR’s technical direction and surveillance. As used in this contract, “technical direction” is direction to the Contractor that requires pursuit of certain lines of inquiry, filing in detail or otherwise serving to accomplish the contract specifications. The technical direction, to be valid:

(a) Must be issued in writing consistent with the general scope of the work stated in the contract;

(b) May not constitute a new assignment of work changes to the expressed terms, conditions, or specifications incorporated into this contract; it shall not constitute a reason to extend the contract delivery schedule.

Nothing contained in this part authorizes the Contractor to incur costs that exceeds the contract price or other limitation of funds stated in the contract due to extra work performed in response to informal directions, suggestions, or instructions (oral or written) given by the CO’s representatives, unless before commencing the work, the Contractor: 1) directly notifies the CO; 2) requests a formal contract modification; and 3) receives written authorization to proceed from the CO.

G.4 Correspondence

Any correspondence initiated by the Contractor shall include the Contract Number and shall be addressed to the CO (original and one copy) at the address provided in the clause entitled “Contractor administration”.

G.5 Job Site Administration

The COR will be available at the site to inspect the work as it progresses. The COR is not authorized to make technical decisions or give technical directions; the Contractor or the Contractor’s Superintendent must contact the COR regarding such decisions and directions.

The Contractor shall have a competent superintendent (the Contractor’s Superintendent) who is (i) deemed acceptable to the Government; (ii) authorized to act on the Contractor’s behalf; and (iii) to be present on the job site at all times when contract work is being performed.

G.6 1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority.

The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

Section H – Special Contract Requirements

H.1 Generic Gender Terminology

Except where stipulated by the Federal Acquisition Regulations, the use of terms such as he, she, his, and her are not to be interpreted as implying other than neutral gender terms such as “it” or “their”.

H.2 Safety

The Contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s); the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA); Emergency Planning and Community Right-to-Know Act (EPCRA); Clean Air Act (CAA); Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).

H.3 Progress Meetings

(a) The Contractor shall be available to meet with the CO or his or her representative at the job site during construction to discuss work progress.

(b) Meetings will be scheduled by the CO with timely notification to the Contractor.

At the progress meetings, the Contractor shall give the CO progress reports on the project. If the work is behind schedule, the Contractor must (i) discuss the work and any causes of work delay(s); (ii) present a plan to bring the work back into conformance with the schedule; or, if necessary (iii) to propose a revised work schedule.

H.4 Operation of Facility During Construction

Construction activities must not interrupt the facility’s function and daily operations during construction.

Contractor must coordinate with the COR for any temporary measures. All temporary measures employed shall be at the Contractor’s expense and shall be removed upon completion of the contract.

H.5 Work Hours

Normal work hours are from 7:30 a.m. through 4:00 p.m., Monday through Friday. Contractor will not be permitted to work at the job site on Saturday, Sunday, or legal holidays unless the CO authorizes otherwise.

H.6 Use of Premises

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened, or operated on Government land or lands administered by the Government, written permission shall be obtained through the CO. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for Contractor. The permission, if granted, will be without charge to Contractor.

(b) Unless provided otherwise, the Contractor shall provide and maintain sanitation facilities for the workforce at the site. Solid waste shall be disposed of under applicable federal, state, and local regulations.

H.7 Maximum Work Week

The maximum work week that will be approved is 40 hours. The Contractor’s proposed hours of work are to include daily starting and stopping times.

H.8 Disposal

The contractor shall follow all standards in the specification and drawings.

H.9 Contractor Employees

a) The Contractor shall furnish sufficient personnel to perform, supervise and manage all work.

b) The Contractor employees shall conduct themselves in a proper, efficient, courteous, and business-like manner.

c) The Contractor shall remove from the site any individual whose continued employment the CO deems to be contrary to public interest or inconsistent with the National Park Service’s policies.

H.10 Permits

Contractor shall, without additional expenses to the government, obtain all appointments, licenses, and permits required to perform work under this contract. Contractor will provide evidence of all permits and licenses to the CO before the work begins and will always display them on the job site.

H.11 Quality of Work

Workmanship shall be of the highest quality and utilize the best trade practices. Contractor shall conform to all requirements of the state and county code, ANSI A 10.6, and applicable codes of the National Fires Protection Association. All replacement materials shall conform to the manufacturer specifications and standards. Substitute items shall be equal to or better that the original material and must be approved by the Government.

H.12 Completion of Work

The time stated for completion of the project includes all materiel procurement, payroll records, corrections of all discrepancies (Punch List Items), and final clean up on premises as stated in the clause “Commencement, Prosecution and Completion of Work”, FAR 52.211-10 (APR 1984) Section F.

H.13 Material Approval Submittals

All submittals shall be transmitted using National Park Service form CM-16E form that will be made available to the Contractor. No action will be taken on a submittal item unless accompanied by the CM- 16E transmittal form.

H.14 Archeological Findings

Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found in the construction area, are the property of and will be removed and only by the Government.

Should Contractor’s operations uncover, or his or her employees find any archeological remains, Contractor shall suspend operations at the discovery site; notify CO immediately of the findings; and continue operation in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for the contractor, he or she will be compensated by an equitable adjustment under the Contract’s General Provision.

H.15 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Internet Payment Platform (IPP) (Apr 2013)

Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Copy of vendor invoice document in PDF format, completed on the pay application document provided by contracting, which shows pricing breakdown for all line items. Once all signatures (Contractor’s / COR / CO) and approvals are completed on the pay application, the vendor can then upload this document into IPP as their invoice attachment.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

H.16 Contractor Performance Assessment Reporting System (Dec 2015)

1) FAR 42.1502 directs all federal agencies to collect past performance information on contracts. The Department of the Interior has implemented the Contractor Performance Assessment Reporting System (CPARS) to follow this regulation. One or more past performance evaluations will be conducted to record your contract performance as FAR 42.15 requires.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.

3) We request that you give the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm’s past performance evaluation(s) for the contract no later than 30 calendar days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

4) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.mil/. The CPARS User Manual, registration for Online Training for Contractor Representatives, and a practice application may be found at this site.

5) Within 60 days after a performance period ends, the CO will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.csd.disa.mil/.

a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

b) Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official’s narrative and should provide your views on the causes and ramifications of the assessed performance.

c) In addition to the ratings and supporting narratives, blocks 1 – 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating “No comment” in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government.

e) If you do not sign and submit the CPARS in 30 days, it will automatically be returned to the Government and will be annotated: “The report was received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment.”

f) Your response is due within 30 calendar days after receiving the CPARS.

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as “source selection information.” After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and submit the form through CPARS, contact the Contracting Officer for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than 7 calendar days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of clause) http://www.cpars.csd.disa.mil/.The http://www.cpars.csd.disa.mil/

Section I – Contract clauses

I.1 52.252-2 Clause Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet/far.gov

Clause Title Date 1452.203-70 Restriction on Endorsements Jul 1996 1452.215-70 Examination of Records by the Department of the Interior Apr 1984 1452.224-1 Privacy Act Notification (July 1996) Deviation Jul 1996 1452.236-70 Prohibition Against Use of Lead-based Paint Jul 1996 52.202-1 Definitions Jun 2020 52.203-3 Gratuities Apr 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government June 2020 52.203-7 Anti-Kickback Procedures Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for

Illegal or Improper Activity May 2014

52.203-12 Limitation on Payments to Influence Certain Federal Transactions

Jun 2020

52.203-16 Preventing Personal Conflicts of Interest Jun 2020 52.203-17 Contractor Employee Whistleblower Rights and

Requirement to Inform Employees of Whistleblower Rights

Nov 2023

52.203-19 Prohibition on Requiring Certain Internal Confidentiality or statements

Jan 2017

52.204-9 Personal Identify Verification of Contractor Personnel Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards Apr 2026

52.204-13 System for Award Management Maintenance Apr 2026 52.204-19 Incorporation by Reference of Representations and

Certifications Dec 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.

Apr 2026

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

Apr 2026

52.215-10 Price Reduction for Defective Cost or Pricing Data Aug 2011 52.215-12 Subcontractor Certified Cost or Pricing Data Apr 2026 52.216-24 Limitation of Government Liability Apr 1984 52.219-6 Notice of Total Small Business Set-Aside Apr 2026 52.219-8 Utilization of Small Business Concerns Apr 2026 52.219-28 Post-Award Small Business Program Representation Apr 2026 52.222-1 Notice to the Government of Labor Disputes Apr 2026 52.222-3 Convict Labor Apr 2026 52.222-4 Contract Work Hours and Safety Standards -Overtime

Compensation Apr 2026

52.222-6 Construction Wage Rate Requirements Apr 2026 52.222-8 Payrolls and Basic Records Apr 2026 52.222-10 Compliance with Copeland Act Requirements Apr 2026 52.222-11 Subcontracts (Labor Standards) Apr 2026 52.222-12 Contract Termination-Debarment May 2014

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

May 2014

52.222-14 Disputes Concerning Labor Standards Apr 2026 52.222-15 Certification of Eligibility May 2014 52.222-16 Approval of Wage Rates Apr 2026 52.222-35 Equal Opportunity for Veterans Apr 2026

52.222-36 Equal Opportunity for Workers with Disabilities Apr 2026 52.222-37 Employment Reports on Veterans Apr 2026

52.222-50 Combating Trafficking in Persons Apr 2026

52.222-54 Employment Eligibility Verification Apr 2026

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026

Apr 2026

52.222-62 Paid Sick Leave Under Executive Order 13706 Apr 2026 52.223-3 Hazardous Material Identification and Material Safety Data Apr 2026 52.223-5 Pollution Prevention and Right-to-Know Information May 2024 52.225-9 Buy American – Construction Materials Apr 2026 52.225-10 Notice of Buy American Act Requirement – Construction

Materials May 2014

52.225-11 Buy American-Construction Materials under Trade Agreements

Apr 2026

52.226-1 Utilization of Indian Organizations and Indian Owned Economic Enterprises

Apr 2026

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving

May 2024

52.227-4 Patent Indemnity-Construction Contracts Dec 2007 52.228-2 Additional Bond Security Oct 1997 52.228-5 Insurance - Work on a Government Installation Jan 1997 52.228-11 Individual Surety – Pledge of Assets Feb 2021 52.228-12 Prospective Subcontractor Requests for Bonds Dec 2022 52.228-14 Irrevocable Letter of Credit Nov 2014 52.228-15 Performance and Payment Bonds - Construction Jun 2020 52.229-3 Federal, State, and Local Taxes Apr 2026 52.232-5 Payments under Fixed-Price Construction Contracts May 2014 52.232-16 Progress Payments Apr 2026 52.232-17 Interest May 2014 52.232-23 Assignment of Claims May 2014 52.232-33 Payment by Electronic Funds Transfer-System for Award

Management Oct 2018

52.232-39 Unenforceability of Unauthorized Obligations Jun 2013 52.232-40 Providing Accelerated Payments to Small

Business Subcontractors Mar 2023

52.233-3 Protest after Award Apr 2026 52.233-3 Protest after Award – Alternate 1 Apr 2026 52.233-4 Applicable Law for Breach of Contract Claim Apr 2026 52.236-2 Differing Site Conditions Apr 2026 52.236-3 Site Investigation and Conditions Affecting the Work Apr 2026 52.236-5 Material and Workmanship Apr 2026 52.236-6 Superintendence by the Contractor Apr 2026 52.236-7 Permits and Responsibilities Apr 2026 52.236-8 Other Contracts Apr 2026 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements Apr 2026

52.236-10 Operations and Storage Areas Apr 2026 52.236-11 Use and Possession Prior to Completion Apr 2026 52.236-12 Cleaning Up Apr 2026 52.236-13 Accident Prevention Apr 2026 52.236-14 Availability and Use of Utility Services Apr 2026 52.236-17 Layout of Work Apr 2026 52.243-4 Changes Apr 2026 52.243-5 Changes and Changed Conditions Apr 2026 52.246-21 Warranty of Construction Mar 1994 52.249-2 Termination for Convenience of the Government

(Fixed-Price) Apr 2012

52.249-2 Termination for Convenience of the Government (Fixed-Price), Alternate I

Sept 1996

52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements)

Apr 2012

52.249-10 Default (Fixed-Price Construction) Apr 1984 52.253-1 Computer Generated Forms Jan 1991

I.2 1452.204-70 Release of Claims – Department of the Interior (Jul 1996)

After completion of work and before final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

I.3 1452.228-70 Liability Insurance (Jul 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

1. Worker’s compensation and employer’s liability: $500,000

2. General Liability: $100,000 each person and $500,000 each occurrence

3. Property Damage: $1,000,000

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days before the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number, and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate before beginning the work.

(c) The Contractor shall name the United States, National Park Service, as the insured party(ties) on the liability insurance policy.

I.4 52.216-23 Execution and Commencement of Work (Apr 1984)

Execution and Commencement of Work (Apr 1984)

The Contractor shall indicate acceptance of this letter contract by signing three copies of the contract and returning them to the Contracting Officer not later than To Be Determined. Upon acceptance by both parties, the Contractor shall proceed with performance of the work, including purchase of necessary materials.

I.5 52.216-25 Contract Definitization (Apr 2026)

(a) A firm fixed price definitive contract is contemplated. The Contractor agrees to begin promptly negotiating with the Contracting Officer the terms of a definitive contract that will include (1) all clauses required by the Federal Acquisition Regulation (FAR) on the date of execution of the letter contract, (2) all clauses required by law on the date of execution of the definitive contract, and (3) any other mutually agreeable clauses, terms, and conditions. The Contractor agrees to submit a fixed price proposal, including data other than certified cost or pricing data, and certified cost or pricing data, in accordance with FAR 15.408, Table 15-2, supporting its proposal.

(b) The schedule for definitizing this contract is [insert target date for definitization of the contract and dates for submission of proposal, beginning of negotiations, and, if appropriate, submission of make-or-buy and subcontracting plans and certified cost or pricing data]:

(c) If agreement on a definitive contract to supersede this letter contract is not reached by the target date in paragraph (b) of this section, or within any extension of it granted by the Contracting Officer, the Contracting Officer may, with the approval of the head of the contracting activity, determine a reasonable price or fee in accordance with subpart 15.4 and part 31 of the FAR, subject to Contractor appeal as provided in the Disputes clause. In any event, the Contractor shall proceed with completion of the contract, subject only to the Limitation of Government Liability clause.

(1) After the Contracting Officer’s determination of price or fee, the contract shall be governed by-

(i) All clauses required by the FAR on the date of execution of this letter contract for either fixed-price or cost-reimbursement contracts, as determined by the Contracting Officer under this paragraph (c);

(ii) All clauses required by law as of the date of the Contracting Officer’s determination; and

(iii) Any other clauses, terms, and conditions mutually agreed upon.

(2) To the extent consistent with paragraph (c)(1) of this section, all clauses, terms, and conditions included in this letter contract shall continue in effect, except those that by their nature apply only to a letter contract.

Alternate I (Apr 1984). In letter contracts awarded on the basis of price competition, add the following paragraph (d) to the basic clause:

(d) The definitive contract resulting from this letter contract will include a negotiated Firm Fixed Price [insert "price ceiling" or "firm fixed price"] in no event to exceed [insert the proposed price upon which the award was based].

I.6 52.252-4 Alterations in Contract (Apr 1984)

Portions of this contract are altered as follows: None

I.7 52.252-6 Authorization Deviations in Clauses (Nov 2020)

As prescribed in 52.107(f), insert the following clause in solicitations and contracts that include any FAR or supplemental clause with an authorized deviation. Whenever any FAR or supplemental clause is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the clause when it is used without deviation, include regulation name for any supplemental clause, except that the contracting officer shall insert "(DEVIATION)" after the date of the clause.

AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

I.8 DIAR Reference Number 0177, v02, Class Deviation - Limitations on Subcontracting

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are—

(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);

(5) Orders, regardless of dollar value, that are—

(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or

19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees to the following requirements in the performance of a contract assigned a North American Industry Classification System (NAICS) code applicable to this contract:

(1) Services (except construction). It will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United

States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded.

When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.

(i) The following services may be excluded from the 50 percent limitation:

(A) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code (562910), cloud computing services, or mass media purchases.

(B) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). It will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.

This is the start of the file's text. The full file is on GovTribe.